Differences between revisions 321 and 346 (spanning 25 versions)
Revision 321 as of 2018-03-02 09:25:50
Size: 8872
Comment:
Revision 346 as of 2018-03-16 09:26:09
Size: 9750
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/2/26 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180227.png||width=1200}}
2017/3/13 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180313.png||width=1200}}
Line 18: Line 18:

 * Beam leading to REFP port
  * *Enomoto
Line 54: Line 51:
2017/3/2(Fri.) 2017/3/16(Fri.)
Line 58: Line 55:
 * Report of work (*:responsible person) ==== Report of work (*:responsible person) ====
Line 60: Line 57:
  * Alignment: Enomoto, Miyo, Yokozawa
   * IMC and IMMT was aligned to center PRs.
   * Beam spot was not seen at the end.
   * We absolutely need monitors to check beam position at all the mirrors.
 * VAC: *Uchiyama, Kimura, Suzuki
  * Pump down started yesterday, but a big leak was found. We changed a flange at BS and it is ready to pump down again today.
Line 65: Line 60:
  * IOO: kokeyama
   * Alignment to MC was fixe.
 * Alignment, ETMY: *Enomoto, Miyo, Miyamoto, Izumi
  * Yaw damping stared working by changing polarity.
  * Beam alignment to both end and REFL port was confirmed the last night.
   * ~10rad shift was seen as usual.
   * Clipping was fixed by PSL alignment yesterday.
   * PR3 is being shifted to yaw by pump down by ~300urad.
  * LSC model as full model started running at k1imc0. Dolhpin will be conected soon.
Line 68: Line 68:
  * AOS:
   * Lasers of oplev will can be dying soon.
    * The lifetime is about 100000h.
 * Camera: Yokozawa
  * IYAC and IXAC areas are being pumped down.
Line 72: Line 71:
  * CRY: mirror temperature 89K.  * CRY: Mirror reached at 18K.
Line 75: Line 74:
 * Work plan (*:responsible person)
Line 77: Line 75:
  * Alignment:
   * Alignment to IYA, or IYC will be checked and we will find the spot at the end then.
==== Work plan (*:responsible person) ====
Line 80: Line 77:
 * Laser hazard: AM: PSL, PM: Upstream SR2-3 line, and Y-end.  * VAC: Uchiyama
  * Pump down.
Line 82: Line 80:
 * Weekly
  * Week of 2/26
   * ETMY tuninng.
   * Beam alignment to REFL port.
 * DGS: *Miyakawa
  * 10GB network card at dc0 will be replaced.
Line 87: Line 83:
  * week of 3/5
   * IYC door will be closed.
   * Exchanging items and cleaning inside the PR2 chamber
Line 91: Line 84:
  * week of 3/12
   * TMS installation at ETMY.
   * Connecting ducts at the corner area.
==== Laser hazard ====
 * [AM] IR: PSL, Green: off.
 * [PM] IR: PSL, Green: off.
 * [night] IR: all, Green: off
Line 95: Line 89:
  * week of 3/19
   * Vacuum test at at the corner area.
   * TMS alignment using green light at ETMY.
==== Weekly ====
 * week of 3/12
  * TMS installation at ETMY.
  * Connecting ducts at the corner area.

* week of 3/19
  * Vacuum test at at the corner area.
  * TMS alignment using green light at ETMY.
  * Beam alignment to REFL port.
Line 101: Line 101:
  * Connection of PD signal to DAQ should be implemented this week or next week.

Line 107: Line 110:
==== Weekly meeting ==== === Weekly meeting ===
Line 112: Line 115:
||22||2018/3/13||[[KAGRA/Commissioning/Weekly/20180313/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180313.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180313/Minute|Minute]]|| ||
||21||2018/3/6||[[KAGRA/Commissioning/Weekly/20180306/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180306.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180306/Minute|Minute]]|| ||
Line 135: Line 140:
 * Meeting for pump down test at Center are ([[/Meetings/Others/20180314|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter#preview|Check list]])

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/13 updated KAGRA/Commissioning/Commissioning_schedule_20180313.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/16(Fri.)

  • Remote participants by eZuce: None

Report of work (*:responsible person)

  • VAC: *Uchiyama, Kimura, Suzuki
    • Pump down started yesterday, but a big leak was found. We changed a flange at BS and it is ready to pump down again today.
  • Alignment, ETMY: *Enomoto, Miyo, Miyamoto, Izumi
    • Yaw damping stared working by changing polarity.
    • Beam alignment to both end and REFL port was confirmed the last night.
      • ~10rad shift was seen as usual.
      • Clipping was fixed by PSL alignment yesterday.
      • PR3 is being shifted to yaw by pump down by ~300urad.
    • LSC model as full model started running at k1imc0. Dolhpin will be conected soon.
  • Camera: Yokozawa
    • IYAC and IXAC areas are being pumped down.
  • CRY: Mirror reached at 18K.

Work plan (*:responsible person)

  • VAC: Uchiyama
    • Pump down.
  • DGS: *Miyakawa
    • 10GB network card at dc0 will be replaced.

Laser hazard

  • [AM] IR: PSL, Green: off.
  • [PM] IR: PSL, Green: off.
  • [night] IR: all, Green: off

Weekly

  • week of 3/12
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues
    • Connection of PD signal to DAQ should be implemented this week or next week.

KAGRA/Commissioning/DailyWork
<< <  2024 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)