Line 54: Line 54:
2017/3/6(Tue.) 2017/3/6(Wed.)
Line 56: Line 56:
 * Remote participants by eZuce: Kimura  * Remote participants by eZuce: Izumi
Line 60: Line 60:
  * Alignment: Enomoto
   * Beam was found again at PD and Tcam of ETMX and Tcam of ETMY. Baffle PD at
  * Alignment: Enomoto, Izumi
   * Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
Line 63: Line 63:
  * BS: Mark
   * We lifted up the optical table.
  * AOS: Akutsu, Michimura
   * We replace all the items which were not compatible to vacuum.
Line 66: Line 66:
  * IOO:
   * IMMT2 cannot be seen by camera. We will work on camera this week.
 * Tcam:
  * Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
Line 69: Line 69:
  * CRY: mirror temperature 71K.   * CRY: mirror temperature 24K.
Line 74: Line 74:
   * We will find beam at the ETMY or ETMX by dithering PR3.    * PD at BS will be moved to REFL.
   * Connection of PD signal to DAQ should be implemented this week or next week.
   * GigE camera should be placed at the REFL port eventually.
Line 77: Line 79:
   * Items PR2 chamber will be replaced, and green light will be used in the afternoon.
   * WAB work at the IYA.
   * Alignment of green light to ETMY will be finished today.
Line 80: Line 81:
 * Laser hazard: AM: PSL, PM: Upstream SR2-3 line, and Y-end for both IR and green.  * Laser hazard:
  *
AM: Around PR2 for green, Y-end for IR.
  *
PM: Around PR2 for green, upstream SR2-3 line for IR.
Line 83: Line 87:
Line 85: Line 88:
   * IYC door will be closed.
   *
Exchanging items and cleaning inside the PR2 chamber
   * 3/5 Exchanging items and cleaning inside the PR2 chamber
   * 3/8 IYC door will be closed.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/5 updated KAGRA/Commissioning/Commissioning_schedule_20180306.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/6(Wed.)

  • Remote participants by eZuce: Izumi
  • Report of work (*:responsible person)
    • Alignment: Enomoto, Izumi
      • Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
    • AOS: Akutsu, Michimura
      • We replace all the items which were not compatible to vacuum.
  • Tcam:
    • Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
    • CRY: mirror temperature 24K.
  • Work plan (*:responsible person)
    • Alignment: Enomoto
      • PD at BS will be moved to REFL.
      • Connection of PD signal to DAQ should be implemented this week or next week.
      • GigE camera should be placed at the REFL port eventually.
    • AOS: Akutsu, Michimura
      • Alignment of green light to ETMY will be finished today.
  • Laser hazard:
    • AM: Around PR2 for green, Y-end for IR.
    • PM: Around PR2 for green, upstream SR2-3 line for IR.
  • Weekly
    • week of 3/5
      • 3/5 Exchanging items and cleaning inside the PR2 chamber
      • 3/8 IYC door will be closed.
    • week of 3/12
      • TMS installation at ETMY.
      • Connecting ducts at the corner area.
    • week of 3/19
      • Vacuum test at at the corner area.
      • TMS alignment using green light at ETMY.
      • Beam alignment to REFL port.
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

20

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members