Differences between revisions 325 and 327 (spanning 2 versions)
Revision 325 as of 2018-03-06 09:14:39
Size: 9093
Comment:
Revision 327 as of 2018-03-07 09:24:13
Size: 9278
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
2017/3/6(Tue.) 2017/3/6(Wed.)
Line 56: Line 56:
 * Remote participants by eZuce: Kimura  * Remote participants by eZuce: Izumi
Line 58: Line 58:
 * Report of work (*:responsible person) === Report of work (*:responsible person) ===
 * Alignment: Enomoto, Izumi
  * Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
Line 60: Line 62:
  * Alignment: Enomoto
   * Beam was found again at PD and Tcam of ETMX and Tcam of ETMY. Baffle PD at
 * AOS: Akutsu, Michimura
  * We replace all the items which were not compatible to vacuum.
Line 63: Line 65:
  * BS: Mark
   * We lifted up the optical table.
 * Tcam:
  * Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
Line 66: Line 68:
  * IOO:
   * IMMT2 cannot be seen by camera. We will work on camera this week.
 * CRY: mirror temperature 24K.
Line 69: Line 70:
  * CRY: mirror temperature 71K. === Work plan (*:responsible person) ===
 * Alignment: Enomoto
  * PD at BS will be moved to REFL.
  * Connection of PD signal to DAQ should be implemented this week or next week.
  * GigE camera should be placed at the REFL port eventually.
Line 71: Line 76:
 * Work plan (*:responsible person)  * AOS: Akutsu, Michimura
  * Alignment of green light to ETMY will be finished today.
Line 73: Line 79:
  * Alignment: Enomoto
   * We will find beam at the ETMY or ETMX by dithering PR3.
=== Laser hazard ===
 * AM: Around PR2 for green, Y-end for IR.
 * PM: Around PR2 for green, upstream SR2-3 line for IR.
Line 76: Line 83:
  * AOS: Akutsu, Michimura
   * Items PR2 chamber will be replaced, and green light will be used in the afternoon.
   * WAB work at the IYA.
Line 80: Line 84:
 * Laser hazard: AM: PSL, PM: Upstream SR2-3 line, and Y-end for both IR and green. === Weekly ===
 * week of 3/5
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
  * 3/8 IYC door will be closed.
Line 82: Line 89:
 * Weekly  * week of 3/12
  * TMS installation at ETMY.
  * Connecting ducts at the corner area.
Line 84: Line 93:
  * week of 3/5
   * IYC door will be closed.
   * Exchanging items and cleaning inside the PR2 chamber

  * week of 3/12
   * TMS installation at ETMY.
   * Connecting ducts at the corner area.

 
* week of 3/19
  * Vacuum test at at the corner area.
  * TMS alignment using green light at ETMY.
   * Beam alignment to REFL port.
 * week of 3/19
  * Vacuum test at at the corner area.
  * TMS alignment using green light at ETMY.
  * Beam alignment to REFL port.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/5 updated KAGRA/Commissioning/Commissioning_schedule_20180306.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/6(Wed.)

  • Remote participants by eZuce: Izumi

Report of work (*:responsible person)

  • Alignment: Enomoto, Izumi
    • Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
  • AOS: Akutsu, Michimura
    • We replace all the items which were not compatible to vacuum.
  • Tcam:
    • Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
  • CRY: mirror temperature 24K.

Work plan (*:responsible person)

  • Alignment: Enomoto
    • PD at BS will be moved to REFL.
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.
  • AOS: Akutsu, Michimura
    • Alignment of green light to ETMY will be finished today.

Laser hazard

  • AM: Around PR2 for green, Y-end for IR.
  • PM: Around PR2 for green, upstream SR2-3 line for IR.

Weekly

  • week of 3/5
    • 3/5 Exchanging items and cleaning inside the PR2 chamber
    • 3/8 IYC door will be closed.
  • week of 3/12
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

20

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)