Line 54: Line 54:
2017/3/6(Wed.) 2017/3/12(Mon.)
Line 56: Line 56:
 * Remote participants by eZuce: Izumi  * Remote participants by eZuce: None
Line 59: Line 59:
 * Alignment: Enomoto, *Izumi
  * Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
Line 62: Line 60:
 * AOS: *Akutsu, Michimura
  * We replace all the items which were not compatible to vacuum.
 * Alignment: *Enomoto, Miyo, Miyamoto
  * Tuning of ETMY damping.
  * Yaw of 0.2Hz of ETMY is still moving. RMS is limited by this ~10urad.

 * CRY: Mirror reached at 19K.



==== Work plan (*:responsible person) ====
Line 66: Line 71:
  * Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.   * phi800 door of IX will be closed today.
  * phi800 door of IY will be closed tomorrow or day after tomorrow.
Line 68: Line 74:
 * CRY: mirror temperature 24K.

==== Work plan (*:responsible person) ====
 * Alignment: *Enomoto
  * PD at BS will be moved to REFL.
  * Connection of PD signal to DAQ should be implemented this week or next week.
  * GigE camera should be placed at the REFL port eventually.

 * AOS: *Akutsu, Michimura
  * Alignment of green light to ETMY will be finished today.
Line 80: Line 76:
 * AM: Around PR2 for green, Y-end for IR.
 * PM: Around PR2 for green, upstream SR2-3 line for IR.
 * [AM] IR: PSL, Green: PR2.
 * [PM] IR: PSL, Green: PR2.
Line 86: Line 82:
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
Line 90: Line 85:
  * 3/14: meeting for pump-down check
Line 100: Line 96:
  * Connection of PD signal to DAQ should be implemented this week or next week.
  * GigE camera should be placed at the REFL port eventually.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/5 updated KAGRA/Commissioning/Commissioning_schedule_20180306.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/12(Mon.)

  • Remote participants by eZuce: None

Report of work (*:responsible person)

  • Alignment: *Enomoto, Miyo, Miyamoto
    • Tuning of ETMY damping.
    • Yaw of 0.2Hz of ETMY is still moving. RMS is limited by this ~10urad.
  • CRY: Mirror reached at 19K.

Work plan (*:responsible person)

  • Tcam: *Inoue, Cory, Binhua
    • phi800 door of IX will be closed today.
    • phi800 door of IY will be closed tomorrow or day after tomorrow.

Laser hazard

  • [AM] IR: PSL, Green: PR2.
  • [PM] IR: PSL, Green: PR2.

Weekly

  • week of 3/5
    • 3/8 IYC door will be closed.
  • week of 3/12
    • 3/14: meeting for pump-down check
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

20

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)