Differences between revisions 331 and 337 (spanning 6 versions)
Revision 331 as of 2018-03-08 09:12:20
Size: 9562
Comment:
Revision 337 as of 2018-03-13 09:21:58
Size: 9772
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
2017/3/7(Thur.) 2017/3/12(Tue.)
Line 56: Line 56:
 * Remote participants by eZuce: Izumi  * Remote participants by eZuce: None
Line 60: Line 60:
 * Alignment: *Enomoto
  * PD in the BS chambers was moved to REFL table.
  * Offset of coil was offloaded into motors upstream.
 * Alignment, ETMY: *Enomoto, Miyo, Miyamoto
  * Diagonal of Bottom filter matrix.
  * Feedforward using accelerometer to IP error point.
  * Alignnemtn for IFO will be checked every night.
  * IMC was aligned last night, but MCi had ~100urad shift. MC alignment will be check every night.
Line 64: Line 66:
 * AOS: *Michimura, Yokogawa, Sugimono
  * Alignment of green light to ETMY was done, and beam was returned to center area.
 * Camera: Yokozawa
  * IX, IY works inside chambers were done. Pump down will be start tomorrow.
  * Team will start this week.
Line 67: Line 70:
 * IMMT: Koseyama
  * had jump but unknown for other SUS.
  * It is not clear that the duct connection or kicking table.
  * Oplev will be centered today.
Line 68: Line 75:
 * CRY: mirror temperature increase from 24K 25K during night.  * CRY: Mirror reached at 16K.
Line 72: Line 80:
 * AOS: *Michimura
  * Alignment of green at the ETMY table will be done today, so beam can be used outside of ETMY chamber around the ETMY area. However no laser hazard is needed at the ETMY area because power is very small.
 * VAC: Uchiyama
  * Duct connection, but they will wait for centering of oplev of IMMT.
 * Tcam:
  * phi800 door of IX and IY will be closed today.
  * Pump down will be start tomorrow.
Line 75: Line 86:
 * Tcam: *Inoue, Cory, Binhua
  * Illuminator or IYA will be implemented this afternoon.
 * Alignment, ETMY: *Enomoto, Miyo, Miyamoto
  * MC alignment will be check every night.
  * Alignnemtn for IFO will be checked every night.
Line 79: Line 91:
 * Maintenance of PCs will be done tomorrow. DAQ and some RT models will be stopped.  * IMMT: Koseyama
  * Oplev will be centered today.

Line 82: Line 97:
 * [AM] IR: PSL and Y-end, Green: PR2.
 * [PM] IR: upstream SR2-3 line and Y-end, Green: PR2
 * [AM] IR: PSL, Green: off.
 * [PM] IR: PSL, Green: off.
Line 87: Line 102:
 * week of 3/5
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
  * 3/8 IYC door will be closed.
Line 103: Line 114:
  * Request of using light in the night from Alignment and calibration.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/5 updated KAGRA/Commissioning/Commissioning_schedule_20180306.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/12(Tue.)

  • Remote participants by eZuce: None

Report of work (*:responsible person)

  • Alignment, ETMY: *Enomoto, Miyo, Miyamoto
    • Diagonal of Bottom filter matrix.
    • Feedforward using accelerometer to IP error point.
    • Alignnemtn for IFO will be checked every night.
    • IMC was aligned last night, but MCi had ~100urad shift. MC alignment will be check every night.
  • Camera: Yokozawa
    • IX, IY works inside chambers were done. Pump down will be start tomorrow.
    • Team will start this week.
  • IMMT: Koseyama
    • had jump but unknown for other SUS.
    • It is not clear that the duct connection or kicking table.
    • Oplev will be centered today.
  • CRY: Mirror reached at 16K.

Work plan (*:responsible person)

  • VAC: Uchiyama
    • Duct connection, but they will wait for centering of oplev of IMMT.
  • Tcam:
    • phi800 door of IX and IY will be closed today.
    • Pump down will be start tomorrow.
  • Alignment, ETMY: *Enomoto, Miyo, Miyamoto
    • MC alignment will be check every night.
    • Alignnemtn for IFO will be checked every night.
  • IMMT: Koseyama
    • Oplev will be centered today.

Laser hazard

  • [AM] IR: PSL, Green: off.
  • [PM] IR: PSL, Green: off.

Weekly

  • week of 3/12
    • 3/14: meeting for pump-down check
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues
    • Request of using light in the night from Alignment and calibration.
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

20

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)