Differences between revisions 332 and 335 (spanning 3 versions)
Revision 332 as of 2018-03-08 09:13:20
Size: 9561
Comment:
Revision 335 as of 2018-03-12 09:27:41
Size: 9256
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
2017/3/7(Thur.) 2017/3/12(Mon.)
Line 56: Line 56:
 * Remote participants by eZuce: None  * Remote participants by eZuce: Miyoki
Line 60: Line 60:
 * Alignment: *Enomoto
  * PD in the BS chambers was moved to REFL table.
  * Offset of coil was offloaded into motors upstream.
 * Alignment, ETMY: *Enomoto, Miyo, Miyamoto
  * Tuning of ETMY damping. Yaw of 0.2Hz of ETMY is still moving. RMS is limited by this ~10urad.
  * ETEY had jump during weekend.
  * BS has also jump on alignment, but not related duct connection.
  * Duct connection made some jumps
   * PR3 had jump 11am on Sunday.
   * IMMT oplev was not centered before duct connection.
Line 64: Line 68:
 * AOS: *Michimura, Yokogawa, Sugimono
  * Alignment of green light to ETMY was done, and beam was returned to center area.
 * CRY: Mirror reached at 18K.
Line 67: Line 70:

 * CRY: mirror temperature increase from 24K 25K during night.
Line 72: Line 73:
 * AOS: *Michimura
  * Alignment of green at the ETMY table will be done today, so beam can be used outside of ETMY chamber around the ETMY area. However no laser hazard is needed at the ETMY area because power is very small.

 * Tcam: *Inoue, Cory, Binhua
  * Illuminator or IYA will be implemented this afternoon.
 * VAC: Uchiyama
  * Duct connection
 * Tcam:
  * phi800 door of IX will be closed today.
  * phi800 door of IY will be closed tomorrow or day after tomorrow.
Line 79: Line 80:
 * Maintenance of PCs will be done tomorrow. DAQ and some RT models will be stopped.
Line 82: Line 81:
 * [AM] IR: PSL and Y-end, Green: PR2.
 * [PM] IR: upstream SR2-3 line and Y-end, Green: PR2
 * [AM] IR: PSL, Green: off.
 * [PM] IR: PSL, Green: off.
Line 87: Line 86:
 * week of 3/5
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
  * 3/8 IYC door will be closed.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/5 updated KAGRA/Commissioning/Commissioning_schedule_20180306.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/12(Mon.)

  • Remote participants by eZuce: Miyoki

Report of work (*:responsible person)

  • Alignment, ETMY: *Enomoto, Miyo, Miyamoto
    • Tuning of ETMY damping. Yaw of 0.2Hz of ETMY is still moving. RMS is limited by this ~10urad.
    • ETEY had jump during weekend.
    • BS has also jump on alignment, but not related duct connection.
    • Duct connection made some jumps
      • PR3 had jump 11am on Sunday.
      • IMMT oplev was not centered before duct connection.
  • CRY: Mirror reached at 18K.

Work plan (*:responsible person)

  • VAC: Uchiyama
    • Duct connection
  • Tcam:
    • phi800 door of IX will be closed today.
    • phi800 door of IY will be closed tomorrow or day after tomorrow.

Laser hazard

  • [AM] IR: PSL, Green: off.
  • [PM] IR: PSL, Green: off.

Weekly

  • week of 3/12
    • 3/14: meeting for pump-down check
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.

KAGRA/Commissioning/DailyWork
<< <  2024 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

20

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings