Differences between revisions 347 and 348
Revision 347 as of 2018-03-19 09:32:18
Size: 9838
Comment:
Revision 348 as of 2018-03-19 09:34:15
Size: 9914
Comment:
Deletions are marked like this. Additions are marked like this.
Line 97: Line 97:
 * 3/26 Pcal will start, and all 1st floor of Y-end will be laser hazard area.  * week of 3/26
  * Rough alignment of ETMX will be planed using IR.
 
* 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/13 updated KAGRA/Commissioning/Commissioning_schedule_20180313.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/19(Mon.)

  • Remote participants by eZuce: Kimura

Report of work (*:responsible person)

  • VAC: *Uchiyama, Kimura, Suzuki
    • 4-5 turbo pumps started.
      • Currently vacuum level is ~1e-4Pa.
      • Some leaks were found. Fixing leaks around BS can be fixed easily, but fixing leaks around MC is not so easy. In any case, we need vent again.
    • New control boxes for gate valve test were done.
      • Currently they work at local place, but they will be controlled remotely in the future.
    • Vacuum chamber of Y-direction of BS is inclined to the gate valve direction by factor of 2mm.
    • PR2 assembly frames will be removed soon.
    • Power cable was connected to the ground at the power panel and made a short to the ground.

Work plan (*:responsible person)

  • Alignment, ETMY: *Izumi
    • All alignment after pump down will be checked.
    • PR3 yaw had some drift during pump-down.
  • Cal:
    • Calibration test using MC is planned on Wednesday.
  • VAC: Kimura, Sawada
    • Door will be closed at 3/23.
    • EX PD will be removed simonteninaously.: *Yokozawa

Laser hazard

  • [AM] IR: all, Green: off.
  • [PM] IR: all, Green: off.
  • [night] IR: all, Green: off

Weekly

  • week of 3/19
    • TMS alignment using green light at ETMY.
    • 3/21: Calibration test using MC.
    • 3/23: door between EXA and EXC will be removed.
  • week of 3/26
    • Rough alignment of ETMX will be planed using IR.
    • 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)