Differences between revisions 347 and 355 (spanning 8 versions)
Revision 347 as of 2018-03-19 09:32:18
Size: 9838
Comment:
Revision 355 as of 2018-03-23 09:22:15
Size: 10003
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/3/13 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180313.png||width=1200}}
2017/3/20 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180320.png||width=1200}}
Line 51: Line 51:
2017/3/19(Mon.) 2017/3/23(Fri.)
Line 53: Line 53:
 * Remote participants by eZuce: Kimura  * Remote participants by eZuce: Izumi, Miyoki
Line 57: Line 57:
 * VAC: *Uchiyama, Kimura, Suzuki
  * 4-5 turbo pumps started.
   * Currently vacuum level is ~1e-4Pa.
   * Some leaks were found. Fixing leaks around BS can be fixed easily, but fixing leaks around MC is not so easy. In any case, we need vent again.
  * New control boxes for gate valve test were done.
   * Currently they work at local place, but they will be controlled remotely in the future.
  * Vacuum chamber of Y-direction of BS is inclined to the gate valve direction by factor of 2mm.
  * PR2 assembly frames will be removed soon.
  * Power cable was connected to the ground at the power panel and made a short to the ground.
 * IFO: *Izumi, Miyamoto, Eleonora
  * BS had some difficulty to close control loop of Y of oplev.
  * T of ETMY control loop was closed.
  * Circuits of baffle PD are being prepared.
Line 67: Line 62:
 * AOS: *Akutsu, Yokogawa
  * Green team succeeded to reach green and IR to ETMY.
  * BRT alignment is going on yesterday and today.
  * Oplev is being prepared at EXC.
Line 68: Line 67:
 * Camera: Yokozawa, Yamamoto, Miyamoto
  * X end camera will be recovered.
  * IYC cooling started.
Line 72: Line 74:
 * Alignment, ETMY: *Izumi
  * All alignment after pump down will be checked.
  * PR3 yaw had some drift during pump-down.
 * Alignment: *Eleonora, Miyamoto
  * BS diagonalization
  * ETMY damping
Line 76: Line 78:

 * Cal:
  * Calibration test using MC is planned on Wednesday.

 * VAC: Kimura, Sawada
  * Door will be closed at 3/23.
  * EX PD will be removed simonteninaously.: *Yokozawa
 * AOS: *Akutsu, Yokogawa
  * BRT alignment is going on yesterday and today.
  * Oplev work at EXC.
Line 86: Line 84:
 * [AM] IR: all, Green: off.
 * [PM] IR: all, Green: off.
 * [night] IR: all, Green: off
 * [AM]
  *
IR: PSL
  *
Green: around PR2
 * [PM]
  *
IR: Upstream SR2-3 line, Xend 1F, Yend 1F.
  *
Green: Xend 1F.

 * [night]
  *
IR: Upstream SR2-3 line, Xend 1F, Yend 1F.
  *
Green: Xend 1F.
Line 94: Line 99:
  * 3/21: Calibration test using MC.   * 3/21~: Calibration test using MC.
Line 96: Line 101:
   * EX PD will be removed at the same time.: *Yokozawa
Line 97: Line 103:
 * 3/26 Pcal will start, and all 1st floor of Y-end will be laser hazard area.  * week of 3/26
  * Rough alignment of ETMX is planed using IR.
 
* 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
Line 112: Line 120:
||23||2018/3/20||[[KAGRA/Commissioning/Weekly/20180320/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180320.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180320/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/20 updated KAGRA/Commissioning/Commissioning_schedule_20180320.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/23(Fri.)

  • Remote participants by eZuce: Izumi, Miyoki

Report of work (*:responsible person)

  • IFO: *Izumi, Miyamoto, Eleonora
    • BS had some difficulty to close control loop of Y of oplev.
    • T of ETMY control loop was closed.
    • Circuits of baffle PD are being prepared.
  • AOS: *Akutsu, Yokogawa
    • Green team succeeded to reach green and IR to ETMY.
    • BRT alignment is going on yesterday and today.
    • Oplev is being prepared at EXC.
  • Camera: Yokozawa, Yamamoto, Miyamoto
    • X end camera will be recovered.
    • IYC cooling started.

Work plan (*:responsible person)

  • Alignment: *Eleonora, Miyamoto
    • BS diagonalization
    • ETMY damping
  • AOS: *Akutsu, Yokogawa
    • BRT alignment is going on yesterday and today.
    • Oplev work at EXC.

Laser hazard

  • [AM]
    • IR: PSL
    • Green: around PR2
  • [PM]
    • IR: Upstream SR2-3 line, Xend 1F, Yend 1F.
    • Green: Xend 1F.
  • [night]
    • IR: Upstream SR2-3 line, Xend 1F, Yend 1F.
    • Green: Xend 1F.

Weekly

  • week of 3/19
    • TMS alignment using green light at ETMY.
    • 3/21~: Calibration test using MC.
    • 3/23: door between EXA and EXC will be removed.
      • EX PD will be removed at the same time.: *Yokozawa
  • week of 3/26
    • Rough alignment of ETMX is planed using IR.
    • 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)