Differences between revisions 349 and 411 (spanning 62 versions)
Revision 349 as of 2018-03-19 09:35:23
Size: 10137
Comment:
Revision 411 as of 2018-05-06 09:23:17
Size: 10871
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/3/13 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180313.png||width=1200}}
2017/5/01 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180501.png||width=1200}}
Line 24: Line 24:
 * Laser, Ref''''''Cav, IMC: 苔山、中野
 * IMMT: 大石
 * VIS
  * Type Bp: 正田、三代
  * Type B: Mark
  * Type A: 奥富、宮本
 * Pico''''''Motor: 三代
 * Digital: 山本、宮川
 * 回路: 上泉、霜出
 * DC電源関連: 宮川
 * AC電源関連: 粟井
 * 水漏れなど: 古田、早河
Line 50: Line 39:
=== 2018/5/6(Sun.) ===
Line 51: Line 41:
2017/3/19(Mon.)  * Remote participants by eZuce: None
 * 9th day of Phase 1 operation
  * PEM vibration injection
  * PEM sound injection
  * Hammer injection
Line 53: Line 47:
 * Remote participants by eZuce: Kimura  * [[KAGRA/Commissioning/Phase1/Operation|Operation wiki page]]
Line 57: Line 52:
 * VAC: *Uchiyama, Kimura, Suzuki
  * 4-5 turbo pumps started.
   * Currently vacuum level is ~1e-4Pa.
   * Some leaks were found. Fixing leaks around BS can be fixed easily, but fixing leaks around MC is not so easy. In any case, we need vent again.
  * New control boxes for gate valve test were done.
   * Currently they work at local place, but they will be controlled remotely in the future.
  * Vacuum chamber of Y-direction of BS is inclined to the gate valve direction by factor of 2mm.
  * PR2 assembly frames will be removed soon.
  * Power cable was connected to the ground at the power panel and made a short to the ground.

 * IFO: *Enomoto + many
  * Consorts bad yesterday and day before yesterday.
  * Lock was stable agin after evening of yesterday.
 
 * Shunup asymmetry: Enomoto
  * Result: asymmetry was estimated 3.8+/-1.4m.
  * It will be measured this morning again to reduce error bar.
Line 72: Line 63:
 * Alignment, ETMY: *Izumi
  * All alignment after pump down will be checked.
  * PR3 yaw had some drift during pump-down.
 * IFO: *Enomoto + many
  * PEM/CRY hammering test.
  * PEM sound injectio.
Line 76: Line 67:
 * OLG: Yamamoto
  * OLG measurement with full swinging.
Line 77: Line 70:
 * Cal:
  * Calibration test using MC is planned on Wednesday.

 * VAC: Kimura, Sawada
  * Door will be closed at 3/23.
  * EX PD will be removed simonteninaously.: *Yokozawa
 * Type A: Miyamoto
  * End IM TF
Line 86: Line 74:
 * [AM] IR: all, Green: off.
 * [PM] IR: all, Green: off.
 * [night] IR: all, Green: off
 * [AM]
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F
 * [PM]
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F

 * [night]
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F
Line 92: Line 88:
 * week of 3/19
  * TMS alignment using green light at ETMY.
  * 3/21: Calibration test using MC.
  * 3/23: door between EXA and EXC will be removed.
 * week of 4/30
  * Operation continues.
Line 97: Line 91:
 * week of 3/26
  * Rough alignment of ETMX will be planed using IR.
  * 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
 * week of 5/7
  * 5/7 8-9am: Close 7 gate valves.
  *
Line 101: Line 95:
 * Issues ==== Issues ====
Line 114: Line 109:
||28||2018/5/1||[[KAGRA/Commissioning/Weekly/20180501/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180501.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180501/Minute|Minute]]|| ||
||27||2018/4/17||[[KAGRA/Commissioning/Weekly/20180417/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180417.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180417/Minute|Minute]]|| ||
||26||2018/4/10||[[KAGRA/Commissioning/Weekly/20180410/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180410.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180410/Minute|Minute]]|| ||
||25||2018/4/3||[[KAGRA/Commissioning/Weekly/20180403/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180403.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180403/Minute|Minute]]|| ||
||24||2018/3/27||[[KAGRA/Commissioning/Weekly/20180327/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180327.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180327/Minute|Minute]]|| ||
Line 140: Line 140:
 * Meeting for pump down test at Center are ([[/Meetings/Others/20180314|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter#preview|Check list]])  * Meeting for pump down test at ETMX 2 ([[/Meetings/Others/20180411|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumETMX|Check list]])
 * Meeting for pump down test at ETMX 1 ([[/Meetings/Others/20180405|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumETMX|Check list]])
 * Meeting for pump down test at Center are ([[/Meetings/Others/20180314|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter|Check list]])

KAGRA Commissioning Wiki


Task list


Schedule

2017/5/01 updated KAGRA/Commissioning/Commissioning_schedule_20180501.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2018/5/6(Sun.)

  • Remote participants by eZuce: None
  • 9th day of Phase 1 operation
    • PEM vibration injection
    • PEM sound injection
    • Hammer injection
  • Operation wiki page

Report of work (*:responsible person)

  • IFO: *Enomoto + many
    • Consorts bad yesterday and day before yesterday.
    • Lock was stable agin after evening of yesterday.
  • Shunup asymmetry: Enomoto
    • Result: asymmetry was estimated 3.8+/-1.4m.
    • It will be measured this morning again to reduce error bar.

Work plan (*:responsible person)

  • IFO: *Enomoto + many
    • PEM/CRY hammering test.
    • PEM sound injectio.
  • OLG: Yamamoto
    • OLG measurement with full swinging.
  • Type A: Miyamoto
    • End IM TF

Laser hazard

  • [AM]
    • IR: Upstream SR2-3 line, Xend 1F, Yend 1F
    • Green: PR2, Xend 1F
  • [PM]
    • IR: Upstream SR2-3 line, Xend 1F, Yend 1F
    • Green: PR2, Xend 1F
  • [night]
    • IR: Upstream SR2-3 line, Xend 1F, Yend 1F
    • Green: PR2, Xend 1F

Weekly

  • week of 4/30
    • Operation continues.
  • week of 5/7
    • 5/7 8-9am: Close 7 gate valves.

Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)