Differences between revisions 350 and 357 (spanning 7 versions)
Revision 350 as of 2018-03-20 08:53:43
Size: 9510
Comment:
Revision 357 as of 2018-03-26 17:02:57
Size: 10212
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/3/13 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180313.png||width=1200}}
2017/3/20 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180320.png||width=1200}}
Line 51: Line 51:
2017/3/20(Tue.) 2017/3/26(Mon.)
Line 53: Line 53:
 * Remote participants by eZuce: None  * Remote participants by eZuce: Shoda
Line 57: Line 57:
 * VAC: *Uchiyama, Kimura, Suzuki
  * PR2 assembly frames will be removed soon.
 * ETMY: *Miyamoto
  * Mirror motion has been suppressed to ~2urad. Requirement is 1urad, pretty close!
Line 60: Line 60:
 * Alignment: *Izumi
  * All alignment to REFL after pump down was verified.
 * BS: *Eleonora, Yamamoto
  * DAQ had trouble. Channel number is assigned to wrong channel, that was because RT model was built and installed but not restarted, and DAQ was restarted independently.
Line 63: Line 63:
 * Camera: *Inoue
  * X end camera was recovered, needs PC tuning.
Line 64: Line 66:
 * ETMY: *Miyamoto  * Camera: Yokozawa, Yamamoto, Miyamoto
  * X end camera will be recovered.
  * IYC cooling started.
Line 69: Line 73:
 * Alignment, ETMY: *Izumi  * BS: *Enomonot
  * Once oplev servo servo was engaged, yaw oscillation started. It will be investigated this week.
Line 71: Line 76:
 * Cal:
  * Calibration test using MC is planned tomorrow.
 * AOS: *Akutsu, Yokogawa
  * BRT alignment is still going on.
  * Oplev work at EXC. It will be available early this week.
Line 76: Line 82:
 * [AM] IR: all, Green: off.
 * [PM] IR: all, Green: off.
 * [night] IR: all, Green: off
 * [AM]
  *
IR: PSL
  *
Green: none
 * [PM]
  *
IR: PSL
  *
Green: none

 * [night]
  *
IR: PSL
  *
Green: none
Line 82: Line 95:
 * week of 3/19
  * TMS alignment using green light at ETMY.
  * 3/21: Calibration test using MC.
  * 3/23: door between EXA and EXC will be removed.
   * EX PD will be removed at the same time.: *Yokozawa
Line 89: Line 97:
  * Rough alignment of ETMX will be planed using IR.   * Connection of cable at ETMX and starting control.
  * Rough alignment of ETMX using IR.
   * EX PD will be removed.: *Yokozawa
Line 91: Line 101:

 * week of 4/2
  * ETMY damping.
  * Rough alignment of ETMX using IR, and control MICH if can.

 * week of 4/9
Line 105: Line 122:
||24||2018/3/27||[[KAGRA/Commissioning/Weekly/20180327/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180327.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180327/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/20 updated KAGRA/Commissioning/Commissioning_schedule_20180320.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/26(Mon.)

  • Remote participants by eZuce: Shoda

Report of work (*:responsible person)

  • ETMY: *Miyamoto
    • Mirror motion has been suppressed to ~2urad. Requirement is 1urad, pretty close!
  • BS: *Eleonora, Yamamoto
    • DAQ had trouble. Channel number is assigned to wrong channel, that was because RT model was built and installed but not restarted, and DAQ was restarted independently.
  • Camera: *Inoue
    • X end camera was recovered, needs PC tuning.
  • Camera: Yokozawa, Yamamoto, Miyamoto
    • X end camera will be recovered.
    • IYC cooling started.

Work plan (*:responsible person)

  • BS: *Enomonot
    • Once oplev servo servo was engaged, yaw oscillation started. It will be investigated this week.
  • AOS: *Akutsu, Yokogawa
    • BRT alignment is still going on.
    • Oplev work at EXC. It will be available early this week.

Laser hazard

  • [AM]
    • IR: PSL
    • Green: none
  • [PM]
    • IR: PSL
    • Green: none
  • [night]
    • IR: PSL
    • Green: none

Weekly

  • week of 3/26
    • Connection of cable at ETMX and starting control.
    • Rough alignment of ETMX using IR.
      • EX PD will be removed.: *Yokozawa
    • 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
  • week of 4/2
    • ETMY damping.
    • Rough alignment of ETMX using IR, and control MICH if can.
  • week of 4/9
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)