Line 11: Line 11:
2017/3/13 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180313.png||width=1200}}
2017/3/26 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180327.png||width=1200}}
Line 51: Line 51:
2017/3/20(Tue.) 2017/3/28(Wed.)
Line 57: Line 57:
 * VAC: *Uchiyama, Kimura, Suzuki
  * PR2 assembly frames will be removed soon.
 * Cry and Type A at ETMX: *Takahashi, Ishizaki, Sato, Okutomi, Tomaru, Takahashi, Ushiba, Miyamoto, Enomoto
  * Height was adjusted, and started yaw alignment. GAS filter had a sudden jump, and it is being fixed today.
  * First contact will be removed.
 * BS: *Enomoto
  * DAC had some glitches with no output (even dac kill and master SW are off).
  * It will be investigated more.
Line 60: Line 64:
 * Alignment: *Izumi
  * All alignment to REFL after pump down was verified.


 * ETMY: *Miyamoto
 * BRT: Akutsu
  * Alignment was done and BRT worked well, it means that the beam position can be controlled after BRT.
  * Beam shape looks elliptic a bit.
Line 69: Line 71:
 * Alignment, ETMY: *Izumi

 * Cal:
  * Calibration test using MC is planned tomorrow.
Line 76: Line 73:
 * [AM] IR: all, Green: off.
 * [PM] IR: all, Green: off.
 * [night] IR: all, Green: off
 * [AM]
  *
IR: PSL, Pend 1F
  *
Green: PR2
 * [PM]
  *
IR: SR2-3 line, Xend 1F, Yend 1F
  *
Green: PR2, Xend 1F

 * [night]
  *
IR: SR2-3 line, Xend 1F, Yend 1F
  *
Green: PR2, Xend 1F
Line 82: Line 86:
 * week of 3/19
  * TMS alignment using green light at ETMY.
  * 3/21: Calibration test using MC.
  * 3/23: door between EXA and EXC will be removed.
   * EX PD will be removed at the same time.: *Yokozawa
Line 89: Line 88:
  * Rough alignment of ETMX will be planed using IR.
Line 91: Line 89:
  * Connection of cable at ETMX and starting control.
  * Rough alignment of ETMX using IR.
   * 3/27 EX PD will be removed.: *Yokozawa

 * week of 4/2
  * ETMY damping.
  * Rough alignment of ETMX using IR, and control MICH if can.

 * week of 4/9
Line 93: Line 101:

 * ETMX Type A: GAS filter had a sudden jump, and it is being fixed today.
 * BS: DAC had some glitches with no output (even dac kill and master SW are off).
Line 105: Line 116:
||24||2018/3/27||[[KAGRA/Commissioning/Weekly/20180327/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180327.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180327/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/3/26 updated KAGRA/Commissioning/Commissioning_schedule_20180327.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/3/28(Wed.)

  • Remote participants by eZuce: None

Report of work (*:responsible person)

  • Cry and Type A at ETMX: *Takahashi, Ishizaki, Sato, Okutomi, Tomaru, Takahashi, Ushiba, Miyamoto, Enomoto
    • Height was adjusted, and started yaw alignment. GAS filter had a sudden jump, and it is being fixed today.
    • First contact will be removed.
  • BS: *Enomoto
    • DAC had some glitches with no output (even dac kill and master SW are off).
    • It will be investigated more.
  • BRT: Akutsu
    • Alignment was done and BRT worked well, it means that the beam position can be controlled after BRT.
    • Beam shape looks elliptic a bit.

Work plan (*:responsible person)

Laser hazard

  • [AM]
    • IR: PSL, Pend 1F
    • Green: PR2
  • [PM]
    • IR: SR2-3 line, Xend 1F, Yend 1F
    • Green: PR2, Xend 1F
  • [night]
    • IR: SR2-3 line, Xend 1F, Yend 1F
    • Green: PR2, Xend 1F

Weekly

  • week of 3/26
    • 3/26 Pcal will start, and all the 1st floor of Y-end will be laser hazard area.
    • Connection of cable at ETMX and starting control.
    • Rough alignment of ETMX using IR.
      • 3/27 EX PD will be removed.: *Yokozawa
  • week of 4/2
    • ETMY damping.
    • Rough alignment of ETMX using IR, and control MICH if can.
  • week of 4/9
  • Issues
  • ETMX Type A: GAS filter had a sudden jump, and it is being fixed today.
  • BS: DAC had some glitches with no output (even dac kill and master SW are off).

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1