Line 11: Line 11:
2017/3/26 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180327.png||width=1200}}
2017/5/01 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180501.png||width=1200}}
Line 24: Line 24:
 * Laser, Ref''''''Cav, IMC: 苔山、中野
 * IMMT: 大石
 * VIS
  * Type Bp: 正田、三代
  * Type B: Mark
  * Type A: 奥富、宮本
 * Pico''''''Motor: 三代
 * Digital: 山本、宮川
 * 回路: 上泉、霜出
 * DC電源関連: 宮川
 * AC電源関連: 粟井
 * 水漏れなど: 古田、早河
Line 50: Line 39:
=== 2018/4/9(Mon.) === === 2018/5/7(Mon.) ===
Line 52: Line 41:
* Remote participants by eZuce:  * Remote participants by eZuce: Miyoki
 * Operation of phase1 was done!

 * [[KAGRA/Commissioning/Phase1/Operation|Operation wiki page]]
Line 55: Line 48:
 * IFO: Izumi, Enomoto, Nakano, Ushiba, Yamamoto
  * Light from ETMY was seen at the REFL. No light was confirmed from ETMX due to the work at ETMX.
  * Connection between k1lsc and k1bs was done.
Line 59: Line 49:
 * IFO: *Enomoto + many
  * Lock was not stable due to an earthquake at Hachijo-jima.
  * Hammering at ETMY did not show any signal at the IFO signal.
  * TF of IM to TM of ETMX.
Line 60: Line 54:
 * DAQ: *Miyakawa
  * Minute raw date is being shifted to k1tw0. k1fw0 currently writing full and science and minute data seems to be working very well.
 * Shunup asymmetry: Enomoto
  * Result: asymmetry was estimated 3.8+/-1.4m.
  * It will be measured this morning again to reduce error bar.
Line 65: Line 59:
 * Alignment: Enomoto
  * Alignment to ETMX will be verified Tuesday evening.
Line 68: Line 60:
 * Vacuum: Kimura
  * Disassembling outer frames today
  * Closing will be done tomorrow.
  * Installation of Illuminator and viewport are still remaining. It will be done today.
  * Laser will be stopped day time during this week.
 * VAC: *Uchiyama
  * 7 gate valve will open this morning.
  * Venting center area.
Line 77: Line 67:
  * Green: off   * Green: None
Line 80: Line 70:
  * Green: off   * Green: None
Line 84: Line 74:
  * Green: off   * Green: None
Line 89: Line 79:
 * week of 4/9
  * 4/11 12:30 at fan hut: Meeting before pump down 2
  * Closing EXC
 * week of 5/7
  * 5/7 8-9am: Close 7 gate valves.
Line 107: Line 97:
||28||2018/5/1||[[KAGRA/Commissioning/Weekly/20180501/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180501.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180501/Minute|Minute]]|| ||
||27||2018/4/17||[[KAGRA/Commissioning/Weekly/20180417/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180417.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180417/Minute|Minute]]|| ||
||26||2018/4/10||[[KAGRA/Commissioning/Weekly/20180410/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180410.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180410/Minute|Minute]]|| ||
Line 135: Line 128:
 * Meeting for pump down test at ETMX 2 ([[/Meetings/Others/20180411|Minute]], [[KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumETMX|Check list]])

KAGRA Commissioning Wiki


Task list


Schedule

2017/5/01 updated KAGRA/Commissioning/Commissioning_schedule_20180501.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2018/5/7(Mon.)

Report of work (*:responsible person)

  • IFO: *Enomoto + many
    • Lock was not stable due to an earthquake at Hachijo-jima.
    • Hammering at ETMY did not show any signal at the IFO signal.
    • TF of IM to TM of ETMX.
  • Shunup asymmetry: Enomoto
    • Result: asymmetry was estimated 3.8+/-1.4m.
    • It will be measured this morning again to reduce error bar.

Work plan (*:responsible person)

  • VAC: *Uchiyama
    • 7 gate valve will open this morning.
    • Venting center area.

Laser hazard

  • [AM]
    • IR: PSL, Yend 1F
    • Green: None
  • [PM]
    • IR: PSL, Yend 1F
    • Green: None
  • [night]
    • IR: PSL, Yend 1F
    • Green: None

Weekly

  • week of 5/7
    • 5/7 8-9am: Close 7 gate valves.

Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings