Line 24: | Line 24: |
* Laser, Ref''''''Cav, IMC: 苔山、中野 * IMMT: 大石 * VIS * Type Bp: 正田、三代 * Type B: Mark * Type A: 奥富、宮本 * Pico''''''Motor: 三代 * Digital: 山本、宮川 * 回路: 上泉、霜出 * DC電源関連: 宮川 * AC電源関連: 粟井 * 水漏れなど: 古田、早河 |
|
Line 50: | Line 39: |
=== 2018/4/18(Wed.) === | === 2018/4/28(Sat.) === |
Line 53: | Line 42: |
* 1st day of Phase 1 operation * OLG by |
|
Line 56: | Line 47: |
* VAC: *Kimura * One of the small leak was found where it was, but another large leak seems to exist. Leak hunting will last today. * There are 3 ways to the operation in the newt week; * Leak location will be found and fixed without vent. -> ETMX gate valve will open, no delay. * Leak location will be found and not fixed without vent. -> Vent on Wednesday and Thursday, fix leak on Friday, pump down on Friday. -> ETMX gate valve will open, delay for several days. * Leak location will not be found and not fixed. -> ETMX gate valve will not open, no delay, but it will be difficult to find beam at ETMX. * ETMX: *Hasegawa * TF for MM coupling of photo sensor was found. * RMS motion seems to be OK if the mirror is not kicked. Even if the mirror is kicked, damping speed is ~10min or something. |
* IFO: *Izumi, Enomoto + many * ETMY damping filter was back to what was best. Fluctuation is ~1urad. * ETMX damping filter changed a bit. Fluctuation is < 1urad. * BS alignment noise was improved around 10-30Hz 8 at most. * Gain bump can be seen around UGF of MICH. * Lock of the last night was ~1hour. Lock was lost because of L to oplev coupling seems to exist. |
Line 68: | Line 55: |
* ETMY: *Nakano, Shishido * Yaw dampins seems to be OK. Coupling between pitch and yaw exists. After ~10min or so, oscillation starts up to 10urad. |
* Camera: Yokozawa, Inoue * IYA camera could not see BS, because some clipping may exist. |
Line 71: | Line 58: |
* IFO: *Enomoto, Izumi * Trial lock of Michelson did not succeed because of too much motion of ETMY. |
* WAB: Akutsu * Heater off. |
Line 74: | Line 61: |
* BS: *Eleonora, Izumi * We are optimizing diagonalization of L2P filter. Needs more time. |
* IYC: Tomaru * Cooler off. |
Line 77: | Line 64: |
* DGS: *Yamamoto * Interface card for PCIe on k1ioo was exchanged and connection between RTPC and IO chassis was established again. |
* Operaton: * [[KAGRA/Commissioning/Phase1/Operation|Operation wiki page]] is opened. |
Line 84: | Line 69: |
* IFO, ETMs, BS: Enomoto, Nakano, Izumi, Hasegawa, Shishido, Eleonora * Damping, BS L2P, restoring alignment. |
* CAL: Yamamoto * Optical gain measurement * Open loot TF. * Amplitude tuning for injection. * Sensitivity. * BS to MICH TF, if can. |
Line 87: | Line 76: |
* VAC: *Kimura * Identifies the location of leak. |
* IFO: *Izumi, Enomoto + many * Higher BS oplev gain will be tried today by the gain switch on opec board or the gain setting on whitening board. |
Line 106: | Line 95: |
* week of 4/16 | * week of 4/23 |
Line 108: | Line 97: |
* Leak check. * Opening the last gate valve. |
* 4/28 Operation start |
Line 111: | Line 99: |
* week of 4/23 * Operation |
* week of 4/30 * Operation continues. |
Line 116: | Line 104: |
* Large leak was found but it is not identified where it is. |
KAGRA Commissioning Wiki
Task list
Schedule
2017/4/17 updated
Working people assignment
- *: responsible person
Meetings
Morning meeting
- Date and time: Every weekday, 9AM
- Location: Control room, or eZuce
2018/4/28(Sat.)
* Remote participants by eZuce: None * 1st day of Phase 1 operation
- OLG by
Report of work (*:responsible person)
- IFO: *Izumi, Enomoto + many
- ETMY damping filter was back to what was best. Fluctuation is ~1urad.
ETMX damping filter changed a bit. Fluctuation is < 1urad.
- BS alignment noise was improved around 10-30Hz 8 at most.
- Gain bump can be seen around UGF of MICH.
- Lock of the last night was ~1hour. Lock was lost because of L to oplev coupling seems to exist.
- Camera: Yokozawa, Inoue
- IYA camera could not see BS, because some clipping may exist.
- WAB: Akutsu
- Heater off.
- IYC: Tomaru
- Cooler off.
- Operaton:
Operation wiki page is opened.
Work plan (*:responsible person)
- CAL: Yamamoto
- Optical gain measurement
- Open loot TF.
- Amplitude tuning for injection.
- Sensitivity.
- BS to MICH TF, if can.
- IFO: *Izumi, Enomoto + many
- Higher BS oplev gain will be tried today by the gain switch on opec board or the gain setting on whitening board.
Laser hazard
- [AM]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
- [PM]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
- [night]
- IR: Upstream SR2-3 line, Xend 1F, Yend 1F
- Green: PR2, Xend 1F
Weekly
- week of 4/23
- Michelson control.
- 4/28 Operation start
- week of 4/30
- Operation continues.
Issues
KAGRA/Commissioning/DailyWork << < 2024 / 7 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
Meeting for pump down test at ETMX 2 (Minute, Check list)
Meeting for pump down test at ETMX 1 (Minute, Check list)
Meeting for pump down test at Center are (Minute, Check list)
Meeting for pump down and cooling at ETMY3 (Minute, Check list)
Meeting for pump down and cooling at ETMY2 (Minute, Check list)
Meeting for pump down and cooling at ETMY1 (Minute, Check list)
Meeting for closing ETY (Minute)
Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools