Differences between revisions 400 and 412 (spanning 12 versions)
Revision 400 as of 2018-04-27 08:57:57
Size: 10733
Comment:
Revision 412 as of 2018-05-07 09:15:01
Size: 10606
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/4/17 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180417.png||width=1200}}
2017/5/01 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180501.png||width=1200}}
Line 39: Line 39:
=== 2018/4/26(Thur.) === === 2018/5/7(Mon.) ===
Line 41: Line 41:
* Remote participants by eZuce: None  * Remote participants by eZuce: Miyoki
 * Operation of phase1 was done!

 * [[KAGRA/Commissioning/Phase1/Operation|Operation wiki page]]
Line 45: Line 49:
 * IFO: *Izumi, Enomoto + many
  * Michelson gardian was implemented. Lock is identified by the REFL and a tripped state of BS.
  * Lock lasts typically several of 10 minutes.
  * PR2 had a jump caused by a DAC glitch once a day. Sampling rate will be lowered?
  * PR3 also had jumps caused by DAC glitches.
  * Whitening filter was implemented at demodulated signal of RFPD. Sensitivity will be improved.
  * Modulation frequency was tuned to iMC length. Optical gain increased 1.4 times.
 * IFO: *Enomoto + many
  * Lock was not stable due to an earthquake at Hachijo-jima.
  * Hammering at ETMY did not show any signal at the IFO signal.
  * TF of IM to TM of ETMX.

 * Shunup asymmetry: Enomoto
  * Result: asymmetry was estimated 3.8+/-1.4m.
  * It will be measured this morning again to reduce error bar.
Line 55: Line 60:
 * IFO: *Izumi, Enomoto, Nakano + many
  * Measurement without locking morning, measurement with locking in the afternoon.
 * VAC: *Uchiyama
  * 7 gate valve will open this morning.
  * Venting center area.
Line 61: Line 66:
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F
  * IR: PSL, Yend 1F
  * Green: None
Line 64: Line 69:
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F
  * IR: PSL, Yend 1F
  * Green: None
Line 68: Line 73:
  * IR: Upstream SR2-3 line, Xend 1F, Yend 1F
  * Green: PR2, Xend 1F
  * IR: PSL, Yend 1F
  * Green: None
Line 74: Line 79:
 * week of 4/23
  * Michelson control.
  * 4/28 Operation start
 * week of 5/7
  * 5/7 8-9am: Close 7 gate valves.
Line 80: Line 85:
  * PR2 had a jump caused by a DAC glitch once a day. Sampling rate will be lowered?
  * PR3 also had jumps caused by DAC glitches.
Line 94: Line 97:
||28||2018/5/1||[[KAGRA/Commissioning/Weekly/20180501/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180501.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180501/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/5/01 updated KAGRA/Commissioning/Commissioning_schedule_20180501.png


Working people assignment

  • *: responsible person



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2018/5/7(Mon.)

Report of work (*:responsible person)

  • IFO: *Enomoto + many
    • Lock was not stable due to an earthquake at Hachijo-jima.
    • Hammering at ETMY did not show any signal at the IFO signal.
    • TF of IM to TM of ETMX.
  • Shunup asymmetry: Enomoto
    • Result: asymmetry was estimated 3.8+/-1.4m.
    • It will be measured this morning again to reduce error bar.

Work plan (*:responsible person)

  • VAC: *Uchiyama
    • 7 gate valve will open this morning.
    • Venting center area.

Laser hazard

  • [AM]
    • IR: PSL, Yend 1F
    • Green: None
  • [PM]
    • IR: PSL, Yend 1F
    • Green: None
  • [night]
    • IR: PSL, Yend 1F
    • Green: None

Weekly

  • week of 5/7
    • 5/7 8-9am: Close 7 gate valves.

Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)