Line 75: Line 75:
=== 2018/9/5(Wed.) === === 2018/9/6(Thur.) ===
Line 79: Line 79:
 * Control room:
 * Fan hut: Miyakawa, Takahashi(ICRR), Enomoto, Izumi, Yokozawa, Kimura, Kokeyama
 * educe: Takahashi
 * Control room: Izumi, Akutsu, Anna
 * Fan hut: Miyakawa, Takahashi(ICRR), Enomoto, Yokozawa, Kimura, Ueda
 * eZuce:
Line 85: Line 85:
|||| ||Before 3PM ||After 3PM||
|||| ||  ||||
|||| ||Before 3PM||After 3PM||
|||| || ||||
Line 88: Line 88:
||Center||upstream IMM ||IR  ||IR || ||Center||upstream IMM ||IR ||IR  ||
Line 90: Line 90:
||Center||behinde SR2-3 line||N/A  ||IR      ||
||||X end 1F ||IR ||IR      ||
||||Y end 1F ||N/A  ||N/A ||
||Center||behinde SR2-3 line||N/A ||IR & Green||
||||X end 1F ||N/A ||IR & Green||
||||Y end 1F ||N/A ||N/A  ||
Line 96: Line 96:
 * Izumi, Enomoto, Eleonora,  * Izumi, Enomoto, Eleonora
Line 99: Line 99:

 * Leak test will be extended to Friday or Saturday.
 * Due on mirror will last for a while. It is not sure when we can inject Nitrogen.
 * ETMY rack was stopped.
Line 104: Line 102:
 * Green laser is injected into POP table. The power is 10mW and table is covered for the safety.
 * Cleaning cable of ETMY rack was done.
 * DAC made 1Hz sound at the PSL.
 * IMC did not work yesterday. Changing some gain and threshold made lock.
  * This morning FSS did not work again.
Line 107: Line 109:
 * Cable clean up on ETMY will be on Thursday.
 *
 * We will introduce beam up to BS.

KAGRA Commissioning Wiki


Task list


Schedule

  • 8/16(Thur) 12:30 meeting at fan hut.
  • 8/23(Thur) 13:10 meeting at fan hut.
  • 8/30(Thur) 13:10 meeting at fan hut.
  • 9/10: 停電対策で真空関係の対応
  • ITMX:
    • 8/20の週: アルミホイルを外す。鏡の測定の位置確認、WABの設定。
    • 8/21: IPリリース、調整
    • 8/27(Mon) : Closing IXC、同日cryostatの掃除をする。
    • 8/28-30: NAB commissioning at IXA
    • 8/30(Wed) : Closing IXA by Mira-Pro
    • 8/30(Thur)夕方- : pump down、30日にポンプ一台で粗挽き、31日金曜日に本引き
    • 9/3-5: leak check
    • 9/11: IXC:φ800及びIXAのフランジ開け

    • 9/18,19~ メインビームのアラインメントをIXAで行う(横澤)
    • 9/11-13 WAB finalize
    • 9/25~26: IXC:φ800及びIXAのフランジ閉止及び真空引き立ち上げ

    • 10/1~2: IXC 真空リーク試験
  • ETMX:
    • 8/31 冷凍機停止、真空引き続けて加温
    • 9/3 or 4 少しだけ大気開放
    • 9/5~ 中の様子を見て判断してフル大気開放
    • 9/7 大気開放ストップ
    • 9-8-10 放置
    • 9/11-10/3の期間EXCチェンバーが開く
    • 9/11大気開放直後:
      • PCalミラー設置(井上)
      • EXAの横の扉を開けて、PD設置(横澤)
    • 9/18: Type-Aを下げる。CRY立会い(牛場、都丸)
      • ~ 9/21: Type-A作業終了。もとの高さに戻す。CRY立会い(牛場、都丸)
    • 9/24 - 9/28:
      • PCalビームアラインメント(井上)
      • ETMXラフアラインメント(EXA内に入る、榎本)
      • EXCにBuffle PDインストール(榎本)
    • 10/4~5: EXC φ800フランジ閉止及び真空引き立ち上げ
    • 10/9~10: EXC 真空リーク試験、又は10/15~16: EXC 真空リーク試験


Working people assignment



Meetings


Daily meeting

  • Date and time: Every weekday, 1PM
  • ~10min, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2018/9/6(Thur.)

  • How about the day and night work on Saturday or Sunday.

Attendance

  • Control room: Izumi, Akutsu, Anna
  • Fan hut: Miyakawa, Takahashi(ICRR), Enomoto, Yokozawa, Kimura, Ueda
  • eZuce:

Laser hazard

Before 3PM

After 3PM

Center

PSL

IR & Green

IR & Green

Center

upstream IMM

IR

IR

Center

around PR2

IR & Green

IR & Green

Center

behinde SR2-3 line

N/A

IR & Green

X end 1F

N/A

IR & Green

Y end 1F

N/A

N/A

Night workers

  • Izumi, Enomoto, Eleonora

Transition from morning work (*:responsible person)

  • ETMY rack was stopped.

Report of work (*:responsible person)

  • Cleaning cable of ETMY rack was done.
  • DAC made 1Hz sound at the PSL.
  • IMC did not work yesterday. Changing some gain and threshold made lock.
    • This morning FSS did not work again.

Work plan (*:responsible person)

  • We will introduce beam up to BS.

KAGRA/Commissioning/DailyWork
<< <  2024 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members