Differences between revisions 487 and 488
Revision 487 as of 2018-09-07 13:28:30
Size: 16549
Comment:
Revision 488 as of 2018-09-11 13:11:11
Size: 16456
Comment:
Deletions are marked like this. Additions are marked like this.
Line 75: Line 75:
=== 2018/9/7(Fri.) ===
 * How about the day and night work on Saturday or Sunday?
=== 2018/9/11(Tue.) ===
Line 79: Line 78:
 * Control room: Miyakawa, Eleonora. Licia, Fujii
 * Fan hut: Izumi, Takahashi(ICRR), Enomoto, Izumi, Akutsu
 * eZuce: Yokozawa
 * Control room: Miyakawa, Oshino, Yamamoto
 * Fan hut: Takahashi(ICRR), Michimura, Yokozawa, Enomoto, Kokeyama, Kozakai
 * eZuce:
Line 87: Line 86:
||Center||PSL ||IR & Green||IR & Green||
||Center||upstream IMM ||IR ||IR       ||
||Center||PSL ||IR       ||IR & Green||
||Center||upstream IMM ||IR ||IR & Green||
Line 91: Line 90:
||||X end 1F ||N/A ||IR & Green|| ||||X end 1F ||N/A ||Green     ||
Line 96: Line 95:
 * Izumi, Enomoto, Eleonora, Yokozawa  * Enomoto, Michimura, Takeda, Yokogawa, Sugimoto, Kozakai, Darhan, Binhau
Line 99: Line 98:
 * ETMs, ITMs, BS, SR2 will be shutdown this afternoon.
 * PRMs and SR3, SRM will be shutdown later.
 * Laser will shutdown later.
 * IXC chamber opened in the moring. EXC will open this afternoon.
Line 104: Line 101:
 * Clean up the fiber coupler for ALS.
 * FSS did not work and it was tuned by Nakano and got locked.
Line 109: Line 104:

 * Telescope will be installed at X end.
 * Both green and IR beam will be checked at IXC.

KAGRA Commissioning Wiki


Task list


Schedule

  • 8/16(Thur) 12:30 meeting at fan hut.
  • 8/23(Thur) 13:10 meeting at fan hut.
  • 8/30(Thur) 13:10 meeting at fan hut.
  • 9/10: 停電対策で真空関係の対応
  • ITMX:
    • 8/20の週: アルミホイルを外す。鏡の測定の位置確認、WABの設定。
    • 8/21: IPリリース、調整
    • 8/27(Mon) : Closing IXC、同日cryostatの掃除をする。
    • 8/28-30: NAB commissioning at IXA
    • 8/30(Wed) : Closing IXA by Mira-Pro
    • 8/30(Thur)夕方- : pump down、30日にポンプ一台で粗挽き、31日金曜日に本引き
    • 9/3-5: leak check
    • 9/11: IXC:φ800及びIXAのフランジ開け

    • 9/18,19~ メインビームのアラインメントをIXAで行う(横澤)
    • 9/11-13 WAB finalize
    • 9/25~26: IXC:φ800及びIXAのフランジ閉止及び真空引き立ち上げ

    • 10/1~2: IXC 真空リーク試験
  • ETMX:
    • 8/31 冷凍機停止、真空引き続けて加温
    • 9/3 or 4 少しだけ大気開放
    • 9/5~ 中の様子を見て判断してフル大気開放
    • 9/7 大気開放ストップ
    • 9-8-10 放置
    • 9/11-10/3の期間EXCチェンバーが開く
    • 9/11大気開放直後:
      • PCalミラー設置(井上)
      • EXAの横の扉を開けて、PD設置(横澤)
    • 9/18: Type-Aを下げる。CRY立会い(牛場、都丸)
      • ~ 9/21: Type-A作業終了。もとの高さに戻す。CRY立会い(牛場、都丸)
    • 9/24 - 9/28:
      • PCalビームアラインメント(井上)
      • ETMXラフアラインメント(EXA内に入る、榎本)
      • EXCにBuffle PDインストール(榎本)
    • 10/4~5: EXC φ800フランジ閉止及び真空引き立ち上げ
    • 10/9~10: EXC 真空リーク試験、又は10/15~16: EXC 真空リーク試験


Working people assignment



Meetings


Daily meeting

  • Date and time: Every weekday, 1PM
  • ~10min, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2018/9/11(Tue.)

Attendance

  • Control room: Miyakawa, Oshino, Yamamoto
  • Fan hut: Takahashi(ICRR), Michimura, Yokozawa, Enomoto, Kokeyama, Kozakai
  • eZuce:

Laser hazard

Before 3PM

After 3PM

Center

PSL

IR

IR & Green

Center

upstream IMM

IR

IR & Green

Center

around PR2

IR & Green

IR & Green

Center

behinde SR2-3 line

N/A

IR & Green

X end 1F

N/A

Green

Y end 1F

N/A

N/A

Night workers

  • Enomoto, Michimura, Takeda, Yokogawa, Sugimoto, Kozakai, Darhan, Binhau

Transition from morning work (*:responsible person)

  • IXC chamber opened in the moring. EXC will open this afternoon.

Report of work (*:responsible person)

Work plan (*:responsible person)

  • Telescope will be installed at X end.
  • Both green and IR beam will be checked at IXC.

KAGRA/Commissioning/DailyWork
<< <  2024 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)