Line 97: Line 97:
=== 2018/10/3(Wed.) === === 2018/10/5(Fri.) ===
Line 100: Line 100:
 * Control room: Miyakawa, Yamamoto, Enomoto, Midooka, Aritomi, Akutsu, Nagano, Oshino, Kozagawa, Kita, Yokogawa, Yokozawa, Anna, Kokeyama
 * Fan hut:
 * Control room: Miyakawa, Tanaka, Yamamoto, Midooka, Aritomi, Akutsu, Nagano, Oshino, Kozakai
 * Fan hut: Furuta, Nakano
Line 117: Line 117:
 * Commissioning: Enomoto, Yokogawa, Midooka, Yamamoto,
 * CAL: Kozakai, Binhua, Yokozawa, Tomaru, Yokozawa
 * AOS: Akutsu, Tanaka, nagano, Nritomi, kita
 * IOO: N/A
 * Commissioning: Enomoto, Yokogawa, Midooka, Yamamoto
 * CAL: Kozakai, Tomaru, Ueda, Sawada
 * AOS: Akutsu, Nagano, Aritomi
 * IOO: Nakano, Yamamoto, Tanioka, Guiguo, Fujikawa, Kitazawa, Kuromiya

=== Weekend ===

 * Commissioning: Enomoto, Miyakawa, Yokozawa, Yamamoto (Probably Sunday)
Line 124: Line 129:
 * Mechanical work of PR2 is done. They need some measurement.
 * Gate valve will be open this evening or tomorrow morning.
 * ETMX oplev moved a lot somehow by ~mrad order in both pitch and yaw.
 * PMC trouble caused by temperature became stable. MZ will be stable today.
Line 130: Line 133:
 * PDA at EXA is offline. It should be fixed.
Line 134: Line 136:
 * Alignment using green at the beginning.
  *Being checked with PDA.
 * Check the oplev of ETMX using green.
 * PZT mirror will be installed to MZ.
 * CAL works for alignment will be done today.
 * Alignment of BRT or setting optical mounts.
 * It will be removed PDA after IR reached ETMX, probably Friday morning.
 * AOS needs to remove PDA after 3PM today.
 * Alignment of Periscope.(CAL)
 * PR2 is being repaired.
  * IR and Green was viewed at the end after PR2 repairing.

KAGRA Commissioning Wiki


Task list


Schedule

2018/10/2 updated

  • 8/16(Thur) 12:30 meeting at fan hut.
  • 8/23(Thur) 13:10 meeting at fan hut.
  • 8/30(Thur) 13:10 meeting at fan hut.
  • 9/10: 停電対策
  • 9/10, 11: 復電作業
  • ITMX:
    • 8/20の週: アルミホイルを外す。鏡の測定の位置確認、WABの設定。
    • 8/21: IPリリース、調整
    • 8/27(Mon) : Closing IXC、同日cryostatの掃除をする。
    • 8/28-30: NAB commissioning at IXA
    • 8/30(Wed) : Closing IXA by Mira-Pro
    • 8/30(Thur)夕方- : pump down、30日にポンプ一台で粗挽き、31日金曜日に本引き
    • 9/3-5: leak check
    • 9/11: IXC:φ800及びIXAのフランジ開け

    • 9/12,13~ メインビームのアラインメントをIXAで行う
    • 9/19: Type-Aを下げる。CRY立会い(牛場、都丸)
      • ~ 9/20: Type-A作業終了。もとの高さに戻す。CRY立会い(牛場、都丸)
    • 9/11-13 WAB finalize
      • 9/12 WAB温度計などの残り作業
      • 9/19 ITMX heat link防振 -> 牛場、山田

      • 9/25 プロテクター取り外し
      • その後WAB protector外し
    • 9/25~26: IXC:φ800及びIXAのフランジ閉止及び真空引き立ち上げ

    • 10/1~2: IXC 真空リーク試験
    • 10月4-5日=Xエンドフランジ封止及び真空排気
    • 10月3-11日=XフロントVIS部品交換作業
      • 10/3=大気導入
      • 10/4=フランジ開放/部品交換
      • 10/4-5=Type-A towerリカバリー
      • 10/9=CRYによる最終調整・確認作業 
      • 10/10=AOSによるWABファイナライズ 
      • 10/11=フランジ閉止真空排気作業(業者発注)
  • ETMX:
    • 8/31 冷凍機停止、真空引き続けて加温
    • 9/3 or 4 少しだけ大気開放
    • 9/5~ 中の様子を見て判断してフル大気開放
    • 9/7 大気開放ストップ
    • 9-8-10 放置
    • 9/11-10/3の期間EXCチェンバーが開く
    • 9/11大気開放直後:
      • PCalミラー設置(井上)
      • EXAの横の扉を開けて、PD設置(横澤)
    • 9/19 BRT運搬、それまでに通路撤去
    • 9/24 - 9/28:
      • PCalビームアラインメント(井上)
      • ETMXラフアラインメント(EXA内に入る、榎本)
      • EXCにBuffle PDインストール(榎本)
    • 10/4~5: EXC φ800フランジ閉止及び真空引き立ち上げ
    • 10/9~10: EXC 真空リーク試験、又は10/15~16: EXC 真空リーク試験
  • ITMY:
    • 10/19 鏡を神岡に輸送


Working people assignment



Meetings


Daily meeting

  • Date and time: Every weekday, 1PM
  • ~10min, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2018/10/5(Fri.)

Attendance

  • Control room: Miyakawa, Tanaka, Yamamoto, Midooka, Aritomi, Akutsu, Nagano, Oshino, Kozakai
  • Fan hut: Furuta, Nakano
  • eZuce:

Laser hazard

Before 3PM

After 3PM

Center

PSL

IR & Green

IR & Green

Center

upstream IMM

IR

IR

Center

around PR2

N/A

IR & Green

Center

behinde SR2-3 line

N/A

IR & Green

X end 1F

IR

IR & Green

Y end 1F

N/A

N/A

Night workers

  • Commissioning: Enomoto, Yokogawa, Midooka, Yamamoto
  • CAL: Kozakai, Tomaru, Ueda, Sawada
  • AOS: Akutsu, Nagano, Aritomi
  • IOO: Nakano, Yamamoto, Tanioka, Guiguo, Fujikawa, Kitazawa, Kuromiya

Weekend

  • Commissioning: Enomoto, Miyakawa, Yokozawa, Yamamoto (Probably Sunday)

Transition from morning work (*:responsible person)

  • PMC trouble caused by temperature became stable. MZ will be stable today.

Report of work (*:responsible person)

Work plan (*:responsible person)

  • AOS needs to remove PDA after 3PM today.
  • Alignment of Periscope.(CAL)
  • PR2 is being repaired.
    • IR and Green was viewed at the end after PR2 repairing.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members