Size: 17978
Comment:
|
Size: 17590
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 102: | Line 102: |
=== 2018/10/12(Fri.) === | === 2018/10/15(Mon.) === |
Line 105: | Line 105: |
* Control room: Akutsu, K.Yamamoto, Fujikawa, Aso, K. Tanaka | * Control room: Miyakawa |
Line 107: | Line 107: |
* eZuce: Enomoto | * eZuce: Enomoto(Network was dead.) |
Line 114: | Line 114: |
||Center||upstream IMM ||IR ||IR || ||Center||around PR2 ||N/A ||IR & Green|| ||Center||behinde SR2-3 line||N/A ||IR & Green|| ||||X end 1F ||IR ||IR & Green|| |
||Center||around PR2 ||IR & Green||IR & Green|| ||Center||behinde SR2-3 line||IR ||IR || ||||X end 1F ||IR & Green||IR & Green|| |
Line 122: | Line 121: |
* Commissioning: Enomoto, Yokogawa, Yamamoto, Sugimoto * CAL: Kozakai, oogaki |
* Commissioning: |
Line 127: | Line 125: |
* Not yet sure. | |
Line 131: | Line 128: |
* Drifts due to pumpdown are happing, it may be difficult to fine green at X end. * IPs of ETMX and ITMX are hitting somewhere, Fujii-kun, Eleonora and Lucia will work to fix it. |
* IPs of ETMX and ITMX are being fixed. |
Line 136: | Line 132: |
* Control loop of SR3 was closed yesterday. | |
Line 139: | Line 134: |
* Laser power will be up 5W inside PSL today. |
KAGRA Commissioning Wiki
Task list
Schedule
2018/10/9 updated
- 8/16(Thur) 12:30 meeting at fan hut.
- 8/23(Thur) 13:10 meeting at fan hut.
- 8/30(Thur) 13:10 meeting at fan hut.
- 9/10: 停電対策
- 9/10, 11: 復電作業
- ITMX:
- 8/20の週: アルミホイルを外す。鏡の測定の位置確認、WABの設定。
- 8/21: IPリリース、調整
- 8/27(Mon) : Closing IXC、同日cryostatの掃除をする。
- 8/28-30: NAB commissioning at IXA
- 8/30(Wed) : Closing IXA by Mira-Pro
- 8/30(Thur)夕方- : pump down、30日にポンプ一台で粗挽き、31日金曜日に本引き
- 9/3-5: leak check
9/11: IXC:φ800及びIXAのフランジ開け
- 9/12,13~ メインビームのアラインメントをIXAで行う
- 9/19: Type-Aを下げる。CRY立会い(牛場、都丸)
- ~ 9/20: Type-A作業終了。もとの高さに戻す。CRY立会い(牛場、都丸)
- 9/11-13 WAB finalize
- 9/12 WAB温度計などの残り作業
9/19 ITMX heat link防振 -> 牛場、山田
- 9/25 プロテクター取り外し
- その後WAB protector外し
9/25~26: IXC:φ800及びIXAのフランジ閉止及び真空引き立ち上げ
- 10/1~2: IXC 真空リーク試験
- 10月4-5日: Xエンドフランジ封止及び真空排気
- 10月3-11日: XフロントVIS部品交換作業
- 10/3: 大気導入
- 10/4: フランジ開放/部品交換
- 10/4-5: Type-A towerリカバリー
- 10/9: CRYによる最終調整・確認作業
- 10/10: AOSによるWABファイナライズ
- 10/11 or 12: フランジ閉止真空排気作業(業者発注)
- 10/17~18: EXC 真空リーク試験
- ETMX:
- 8/31 冷凍機停止、真空引き続けて加温
- 9/3 or 4 少しだけ大気開放
- 9/5~ 中の様子を見て判断してフル大気開放
- 9/7 大気開放ストップ
- 9-8-10 放置
- 9/11-10/3の期間EXCチェンバーが開く
- 9/11大気開放直後:
- PCalミラー設置(井上)
- EXAの横の扉を開けて、PD設置(横澤)
- 9/19 BRT運搬、それまでに通路撤去
- 9/24 - 9/28:
- PCalビームアラインメント(井上)
- ETMXラフアラインメント(EXA内に入る、榎本)
- EXCにBuffle PDインストール(榎本)
- 10/11~12: EXC φ800フランジ閉止及び真空引き立ち上げ
- 10/16~17: EXC 真空リーク試験
- ITMY:
- 10/19 鏡を神岡に輸送
Working people assignment
Meetings
Zoom URL: https://zoom.us/j/8678936825
Daily meeting
- Date and time: Every weekday, 1PM
- ~10min, as short as possible
- Location: Control room and Fan hut connected by eZuce
2018/10/15(Mon.)
Attendance
- Control room: Miyakawa
- Fan hut:
- eZuce: Enomoto(Network was dead.)
Laser hazard
|
Before 3PM |
After 3PM |
|
|
|
||
Center |
PSL |
IR & Green |
IR & Green |
Center |
around PR2 |
IR & Green |
IR & Green |
Center |
behinde SR2-3 line |
IR |
IR |
X end 1F |
IR & Green |
IR & Green |
|
Y end 1F |
N/A |
N/A |
Night workers
- Commissioning:
Weekend
Transition from morning work (*:responsible person)
- IPs of ETMX and ITMX are being fixed.
Report of work (*:responsible person)
Work plan (*:responsible person)
KAGRA/Commissioning/DailyWork << < 2025 / 5 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools