Differences between revisions 534 and 535
Revision 534 as of 2018-10-25 13:16:55
Size: 15780
Comment:
Revision 535 as of 2018-10-26 13:10:09
Size: 15752
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
=== 2018/10/25(Thur.) === === 2018/10/26(Fri.) ===

 * Crane inspection around such time: Laser is stopped at output of PSL during the inspection.
Line 46: Line 48:
 * Control room: Miyakawa, Izumi, Lucia, Yokogawa, Akutsu, Nakano, Kokeyama, Yamamoto, Oshino  * Control room: Miyakawa, Yamamoto, Izumi, Lucia
Line 49: Line 51:
 * Zoom: Enomoto  * Zoom:
Line 63: Line 65:
 * MIF: Izumi, Nakano  * MIF:
Line 69: Line 71:
 * ITMX measurement and analysis are going on by Lucia.
 * ETM motion of 0.78Hz is better than yesterday, but still ~sub urad.
 * Leak check is going on at EXC.
 * PMC Guardian has something wrong, Nakano-kun will fix.

 * Magnet of the ETMX seems to be removed. We need to open one day for the DARM feedback. It will a loss of 2weeks.
Line 79: Line 79:
 * Damping.
 * Check network for Pico motor.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment



Meetings

Zoom URL: https://zoom.us/j/7631499341


Daily meeting

  • Date and time: Every weekday, 1PM
  • ~10min, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2018/10/26(Fri.)

  • Crane inspection around such time: Laser is stopped at output of PSL during the inspection.

Attendance

  • Control room: Miyakawa, Yamamoto, Izumi, Lucia
  • Fan hut:
  • eZuce:
  • Zoom:

Laser hazard

Before 3PM

After 3PM

Center

PSL

IR & Green

IR & Green

Center

around PR2

IR & Green

IR & Green

Center

behinde SR2&Yfront

IR

IR

X end 1F

IR & Green

IR & Green

Y end 1F

N/A

N/A

Night workers

  • MIF:

Weekend

  • CAL: Haino, Nakano

Transition from morning work (*:responsible person)

  • Magnet of the ETMX seems to be removed. We need to open one day for the DARM feedback. It will a loss of 2weeks.

Report of work (*:responsible person)

  • Tidal compensation path was implemented.
  • Lock does not last so long. Pitch of ETMX has still large motion.

Work plan (*:responsible person)

  • Damping.
  • Check network for Pico motor.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1