Differences between revisions 61 and 134 (spanning 73 versions)
Revision 61 as of 2015-08-17 11:40:42
Size: 8788
Comment:
Revision 134 as of 2016-11-22 17:03:50
Size: 14319
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 . Every Wednesday, from 15:00 (JST)
 . '''Next Meeting: 5 August, 2015'''
 . Every Friday, from 13:30 (JST)
Line 9: Line 8:
=== 2016.11.25 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161125|Agenda/Minutes]]

=== 2016.11.18 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161118|Agenda/Minutes]]

=== 2016.11.11 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161111|Agenda/Minutes]]

=== 2016.11.4 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161104|Agenda/Minutes]]


=== 2016.10.28 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161028|Agenda/Minutes]]

=== 2016.10.21 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161021|Progress reports]]

=== 2016.10.14 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161014|Agenda/Minutes]]

=== 2016.10.7 ===

[[KAGRA/Subgroups/VIS/VISMinutes20161007|Agenda/Minutes]]


=== 2016.9.30 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160930|Agenda/Minutes]]

=== 2016.9.16 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160916|Agenda/Minutes]]

=== 2016.9.9 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160909|Agenda/Minutes]]

=== 2016.9.2 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160902|Agenda/Minutes]]

=== 2016.8.19 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160819|Agenda/Minutes]]

=== 2016.8.5 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160805|Agenda/Minutes]]

=== 2016.7.29 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160729|Agenda/Minutes]]

=== 2016.7.22 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160722|Agenda/Minutes]]

=== 2016.7.15 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160715|Agenda/Minutes]]

=== 2016.7.8 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160708|Agenda/Minutes]]

=== 2016.7.1 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160701|Agenda/Minutes]]

=== 2016.6.24 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160624|Agenda/Minutes]]

=== 2016.6.17 ===

[[KAGRA/Subgroups/VIS/VISAgenda20160617|Agenda]]

[[KAGRA/Subgroups/VIS/VISMinutes20160617|Minutes]]

=== 2016.6.10 ===

[[KAGRA/Subgroups/VIS/VISAgenda20160610|Agenda]]

[[KAGRA/Subgroups/VIS/VISMinutes20160610|Minutes]]


=== 2016.6.3 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160603|Minutes]]

=== 2016.5.27 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160527|Minutes]]

=== 2016.5.20 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160520|Minutes]]

=== 2016.5.13 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160513|Minutes]]

=== 2016.5.6 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160506|Minutes]]

=== 2016.4.22 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160422|Minutes]]

=== 2016.4.15 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160415|Minutes]]

=== 2016.4.8 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160408|Minutes]]

=== 2016.4.1 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160401|Minutes]]

=== 2016.3.25 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160325|Minutes]]

=== 2016.3.18 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160318|Minutes]]


=== 2016.3.11 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160311|Minutes]]

=== 2016.3.4 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160304|Minutes]]

=== 2016.2.26 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160226|Minutes]]

=== 2016.2.19 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160219|Minutes]]

=== 2016.2.12 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160212|Minutes]]

=== 2016.2.5 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160205|Minutes]]

=== Electronics Review 2016.2.4 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160204|Minutes]]

=== 2016.1.29 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160129|Minutes]]

=== PR3 meeting 2016.1.26 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160126|Minutes]]

=== 2016.1.22 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160122|Minutes]]

=== 2016.1.15 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160115|Minutes]]

=== 2016.1.8 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160108|Minutes]]

=== 2016.1.6 Special meeting on ETM and PR2 ===

[[KAGRA/Subgroups/VIS/VISMinutes20160106|Minutes]]

=== 2015.12.25 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151225|Minutes]]

=== PR2 wire breaker removal meeting 2015.12.22 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151222|Minutes]]

=== 2015.12.18 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151218|Minutes]]

=== 2015.12.11 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151211|Minutes]]

=== 2015.12.04 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151204|Minutes]]

=== 2015.11.27 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151127|Minutes]]

=== 2015.11.20 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151120|Minutes]]

=== 2015.11.13 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151113|Minutes]]

=== 2015.11.05 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151105|Minutes]]

=== 2015.10.30 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151030|Minutes]]

=== 2015.10.21 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4421|Minute]]

=== 2015.10.14 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4382|Minute]]

=== 2015.10.7 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4370|Minute]]

=== 2015.10.2 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4333|Minute]]

=== 2015.9.16 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4267|Minute]]

=== 2015.9.9 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4222|Minute]]

=== 2015.9.2 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4207|Minute]]

=== 2015.8.26 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4036|Minute]]

=== 2015.8.19 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4015|Minute]]
Line 148: Line 406:
Line 160: Line 417:

NAOJ VIS Meeting

  • Every Friday, from 13:30 (JST)


2016.11.25

Agenda/Minutes

2016.11.18

Agenda/Minutes

2016.11.11

Agenda/Minutes

2016.11.4

Agenda/Minutes

2016.10.28

Agenda/Minutes

2016.10.21

Progress reports

2016.10.14

Agenda/Minutes

2016.10.7

Agenda/Minutes

2016.9.30

Agenda/Minutes

2016.9.16

Agenda/Minutes

2016.9.9

Agenda/Minutes

2016.9.2

Agenda/Minutes

2016.8.19

Agenda/Minutes

2016.8.5

Agenda/Minutes

2016.7.29

Agenda/Minutes

2016.7.22

Agenda/Minutes

2016.7.15

Agenda/Minutes

2016.7.8

Agenda/Minutes

2016.7.1

Agenda/Minutes

2016.6.24

Agenda/Minutes

2016.6.17

Agenda

Minutes

2016.6.10

Agenda

Minutes

2016.6.3

Minutes

2016.5.27

Minutes

2016.5.20

Minutes

2016.5.13

Minutes

2016.5.6

Minutes

2016.4.22

Minutes

2016.4.15

Minutes

2016.4.8

Minutes

2016.4.1

Minutes

2016.3.25

Minutes

2016.3.18

Minutes

2016.3.11

Minutes

2016.3.4

Minutes

2016.2.26

Minutes

2016.2.19

Minutes

2016.2.12

Minutes

2016.2.5

Minutes

Electronics Review 2016.2.4

Minutes

2016.1.29

Minutes

PR3 meeting 2016.1.26

Minutes

2016.1.22

Minutes

2016.1.15

Minutes

2016.1.8

Minutes

2016.1.6 Special meeting on ETM and PR2

Minutes

2015.12.25

Minutes

PR2 wire breaker removal meeting 2015.12.22

Minutes

2015.12.18

Minutes

2015.12.11

Minutes

2015.12.04

Minutes

2015.11.27

Minutes

2015.11.20

Minutes

2015.11.13

Minutes

2015.11.05

Minutes

2015.10.30

Minutes

2015.10.21

2015.10.14

2015.10.7

2015.10.2

2015.9.16

2015.9.9

2015.9.2

2015.8.26

2015.8.19

2015.8.12

2015.8.5

2015.7.29

2015.7.22

2015.7.15

2015.7.8

2015.6.17

2015.6.10

2015.6.3

2015.5.27

2015.5.20

2015.5.7

2015.4.30

2015.4.24

2015.4.15

2015.4.8

2015.3.25

2015.3.11

2015.3.4

2015.2.25

2015.2.4

2015.1.28

2015.1.14

2015.1.7

2014.12.24

2014.12.17

2014.12.10

2014.12.3

2014.11.26

2014.11.19

2014.11.5

2014.10.8

2014.9.24

2014.9.17

2014.8.27

2014.8.20

2014.8.13

2014.8.6

2014.7.24

2014.7.16

2014.7.9

2014.7.2

2014.6.25

2014.6.18

2014.6.11

  • Minute

  • 1) Assembly of the payload in the 20m Lab.
  • 2) Calibration of OSEMs.
  • 3) Preparation of TAMA suspension.
  • 4) MISC

2014.6.4

  • Minute

  • 1) Status of payload assembly. File(TBA)

  • 2) Preparation of TAMA suspension and stack. File(TBA)

  • 3) Fishing rod design for KAGRA GAS filters. File

2014.5.21

2014.5.14

  • Minute

  • 1) Status of payload design and prototype assembly. File(TBA)

  • 2) Brief reports, status of Type-C procurement. File

  • 3) Simulation on coil driver circuits. File

2014.5.7

  • Minute

  • 1) Status of payload prototype assembly. File(TBA)

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File(TBA)

  • 4) Vacuum system setup in TAMA west end. Blog

2014.4.30

  • Minute

  • 1) Status of payload prototype assembly. File

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File

  • 4) Report on G&M and NIKHEF. File

2014.4.23

  • 1) Status of payload assembly in the 20m Lab. File(TBA)

  • 2) Weight distribution problem on the payload. File

2014.4.9

KAGRA/Subgroups/VIS/MeetingNAOJ (last edited 2021-07-21 08:59:45 by KousekiMiyo)