Differences between revisions 575 and 611 (spanning 36 versions)
Revision 575 as of 2018-12-17 13:34:54
Size: 16796
Comment:
Revision 611 as of 2019-01-30 09:16:02
Size: 18202
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:

== Readiness for the X arm commissioning ==
 * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]]
Line 33: Line 37:
==== Daily Meetings (1PM) ==== ==== Daily Meetings (9AM) ====
Line 43: Line 47:
 * Date and time: Every weekday, 1PM
 * ~10min, as short as possible
 * Date and time: Every weekday, 9AM
 * First ~10min in the morning meeting, as short as possible
Line 47: Line 51:
=== 2018/12/17(Mon.) ===

==== Attendance ====

 * Control room: Oshino, Lucia, Enomoto, Miyakawa
 * Fan hut:
 * Zoom: Miyakawa


==== Laser hazard ====

|||| ||Before 3PM||After 3PM ||
|||| || || ||
||Center||PSL ||IR & Green||IR & Green||
||Center||around PR2 ||IR & Green||IR & Green||
||Center||behinde SR2&Yfront||IR ||IR ||
||||X end 1F ||IR & Green||IR & Green||
||||Y end 1F ||IR ||IR ||

==== Night workers in the mine ====

 * We have no night work from 12/17.

=== 2019/1/29(Tue.) ===
Line 71: Line 55:
 * No work on this weekend.

==== Transition from morning work (*:responsible person) ====

 * k1asc0 trouble for network.
 * RFM on k1ix1.

=== Schedule ===
  * Current status as of 1/22: IR and Green reached X end PD.
  * --(1/22 Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/22 or 23 Surface inspection for SR mirrors.)--
  * --(1/24-25 Cleaning HR of SR3, SRM.)--

  * --(1/23 BS is aligned to Y-end PD by IR.)--
  * --(1/24-25 ITMY is aligned to REFL by IR.)--
  * --(1/24-25 ITMX is aligned to REFL by IR.)--
  * --(1/24-25 Beam position of IR at SR3 is confirmed how far from the center.)--

  * --(1/28-29 SR3 is aligned to SR2 center by IR.)--
  * --(1/30 Green beam is injected from SR2 AR surface to Y end PD.)--

  * 1/31-2/1 Removing bellows at PR and SR area.
  * 1/31-2/1 Cleaning HR of PR3 and HR, AR of SR2

  * 2/4-8 --(Alignment of SR2 -> SRM by IR)--, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8 Alignment of ETMY -> POS by Green

  * 2/12-15 Closing door for central area, pumping down
   * needs drift monitor for VIS
Line 79: Line 80:
 * Lucia works on ITMX today and ETMX tomorrow.  * COM: Green laser reached to ETMY.
 * Pedestal was replaced.
 * ISS: PD was installed on second loop.
 * CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
 * ETMY lock was released, but need little more time to make it work.
Line 82: Line 87:
 * Complete the noise budget for ALS based on measurement.
 * Implement Angle control for X arm on ETMX Marionette of BF
 * SRM: needs some fine alignment.
 * DGS: weekly maintenance from 9am to 1pm.
 * PEM: Channel names will be replaced on Monday.
 * ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.
Line 97: Line 103:
||59||2019/1/29||[[KAGRA/Commissioning/Weekly/20190129/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190129/Minute|Minute]]|| ||
||58||2019/1/22||[[KAGRA/Commissioning/Weekly/20190122/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190122/Minute|Minute]]|| ||
||57||2019/1/8||[[KAGRA/Commissioning/Weekly/20190108/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190108/Minute|Minute]]|| ||
||56||2018/12/25||[[KAGRA/Commissioning/Weekly/20181225/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181225/Minute|Minute]]|| ||
||55||2018/12/17||[[KAGRA/Commissioning/Weekly/20181217/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181217/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/29(Tue.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/22 or 23 Surface inspection for SR mirrors.

  • 1/24-25 Cleaning HR of SR3, SRM.

  • 1/23 BS is aligned to Y-end PD by IR.

  • 1/24-25 ITMY is aligned to REFL by IR.

  • 1/24-25 ITMX is aligned to REFL by IR.

  • 1/24-25 Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29 SR3 is aligned to SR2 center by IR.

  • 1/30 Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31-2/1 Removing bellows at PR and SR area.
  • 1/31-2/1 Cleaning HR of PR3 and HR, AR of SR2
  • 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

  • 2/4-8 Alignment of ETMY -> POS by Green

  • 2/12-15 Closing door for central area, pumping down
    • needs drift monitor for VIS

Report of work (*:responsible person)

  • COM: Green laser reached to ETMY.
  • Pedestal was replaced.
  • ISS: PD was installed on second loop.
  • CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
  • ETMY lock was released, but need little more time to make it work.

Work plan (*:responsible person)

  • SRM: needs some fine alignment.
  • DGS: weekly maintenance from 9am to 1pm.
  • PEM: Channel names will be replaced on Monday.
  • ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members