Line 19: Line 19:

== Readiness for the X arm commissioning ==
 * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]]
Line 33: Line 37:
==== Daily Meetings (1PM) ==== ==== Daily Meetings (9AM) ====
Line 43: Line 47:
 * Date and time: Every weekday, 1PM
 * ~10min, as short as possible
 * Date and time: Every weekday, 9AM
 * First ~10min in the morning meeting, as short as possible
Line 47: Line 51:
=== 2018/12/21(Fri.) ===

==== Attendance ====

 * Control room: Oshino, Miyakawa, Yamamoto, Tanaka H, Tanaka K, Lucia, Fujii
 * Fan hut:
 * Zoom: Yokozawa, Enomoto


==== Laser hazard ====

|||| ||AM ||PM ||
|||| || || ||
||Center||PSL ||IR & Green||IR & Green||
||Center||around PR2 ||IR & Green||IR & Green||
||Center||behinde SR2&Yfront||IR ||IR ||
||||X end 1F ||IR & Green||IR & Green||
||||Y end 1F ||IR ||N/A ||

==== Night workers in the mine ====

 * We have no night work from 12/17.
=== 2019/1/18(Fri.) ===
Line 71: Line 54:
 * No work on this weekend.  * Nakano, Enomoto, Yokozawa, Yokogawa, Tomaru, Ushiba Guiguo : Some work for Y arm alignment.
Line 75: Line 58:
 * If you open chamber or flange, you must put a label on the door/flange for "when/who" oped/closed door, and leave "current status".
 * COMM: SR alignment will be proceeded in the middle or late of next week
Line 76: Line 62:
 * K1asc0 is ready, and RFM for ITMX and ETMX are ready. RFM for EXMY is not connected instead.
 * PR2, 3 models are being modified to receive accelerometer signals.

 * IMC: ASC loop was closed. Lock lasted all the night.
 * COMM: Beam is hitting on the center of PR2.
 * PR2: We saw the big pitch difference on Oplev as before.
 * ITMY : IP matrix tuning was done.
  * Needs more time for damping. ITMY will be ready next week for SR alignment.

 * MIR: Yokozawa, Kimura, Tomaru checked the surface of ETMY mirror. It was found that the surface was very dirty by eye and Tcam.
  * It is not sure for the cleaning.

 * WAB ETMX: Completed and moved in the safe mode. Needs a small remaining work for ITMY.
 
Line 80: Line 76:
 * Restoring alignment.
 *
 * PR2 and PR3: we will open doors.
 * Type B: needs tuning for BS frequency. GEO phone is something wrong.
 * DGS: X end rack maintenance will finish this Friday or beginning of next week.
Line 95: Line 93:
||54||2018/12/17||[[KAGRA/Commissioning/Weekly/20181217/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181217/Minute|Minute]]|| || ||57||2019/1/8||[[KAGRA/Commissioning/Weekly/20190108/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190108/Minute|Minute]]|| ||
||56||2018/12/25||[[KAGRA/Commissioning/Weekly/20181225/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181225/Minute|Minute]]|| ||
||55||2018/12/17||[[KAGRA/Commissioning/Weekly/20181217/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20181217/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/18(Fri.)

Weekend

  • Nakano, Enomoto, Yokozawa, Yokogawa, Tomaru, Ushiba Guiguo : Some work for Y arm alignment.

Transition from morning work (*:responsible person)

  • If you open chamber or flange, you must put a label on the door/flange for "when/who" oped/closed door, and leave "current status".
  • COMM: SR alignment will be proceeded in the middle or late of next week

Report of work (*:responsible person)

  • IMC: ASC loop was closed. Lock lasted all the night.
  • COMM: Beam is hitting on the center of PR2.
  • PR2: We saw the big pitch difference on Oplev as before.
  • ITMY : IP matrix tuning was done.
    • Needs more time for damping. ITMY will be ready next week for SR alignment.
  • MIR: Yokozawa, Kimura, Tomaru checked the surface of ETMY mirror. It was found that the surface was very dirty by eye and Tcam.
    • It is not sure for the cleaning.
  • WAB ETMX: Completed and moved in the safe mode. Needs a small remaining work for ITMY.

Work plan (*:responsible person)

  • PR2 and PR3: we will open doors.
  • Type B: needs tuning for BS frequency. GEO phone is something wrong.
  • DGS: X end rack maintenance will finish this Friday or beginning of next week.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members