Line 19: Line 19:

== Readiness for the X arm commissioning ==
 * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]]
Line 33: Line 37:
==== Daily Meetings (1PM) ==== ==== Daily Meetings (9AM) ====
Line 43: Line 47:
 * Date and time: Every weekday, 1PM
 * ~10min, as short as possible
 * Date and time: Every weekday, 9AM
 * First ~10min in the morning meeting, as short as possible
Line 47: Line 51:
=== 2018/12/21(Fri.) ===
Line 49: Line 52:
==== Attendance ==== === 2019/1/22(Tue.) ===
Line 51: Line 54:
 * Control room: Oshino, Miyakawa, Yamamoto, Tanaka H, Tanaka K, Lucia, Fujii
 * Fan hut:
 * Zoom: Yokozawa, Enomoto
=== Weekend ===
Line 56: Line 57:
==== Laser hazard ====

|||| ||AM ||PM ||
|||| || || ||
||Center||PSL ||IR & Green||IR & Green||
||Center||around PR2 ||IR & Green||IR & Green||
||Center||behinde SR2&Yfront||IR ||IR ||
||||X end 1F ||IR & Green||IR & Green||
||||Y end 1F ||IR ||N/A ||

==== Night workers in the mine ====

 * We have no night work from 12/17.

=== Weekend ===
 * No work on this weekend.
Line 74: Line 58:
 * Haibo starts joining commissioning work. He will stay 20days.
Line 76: Line 61:
 * K1asc0 is ready, and RFM for ITMX and ETMX are ready. RFM for EXMY is not connected instead.
 * PR2, 3 models are being modified to receive accelerometer signals.

 * BS: Two cables were not connected well, so actuation was not correct when measuring TF day before yesterday.
  * TF was measured yesterday but still TF showed something different from the last correct measurement.
  * FR moved 800um.
  * Anyway alignment can be proceeded probably this afternoon.

 * CRY: we found disconnected cables at ITMX.

 * OMC: OMMT was aligned, and it was found that OSEM was touched somewhere.
 * PEM: Ondotori is still not working because of software issue.
Line 80: Line 74:
 * Restoring alignment.
 *

 * COMM: we will check PR3 first, then SR3.
  * Access to PR3 is quite difficult, gate valve needs to be removed or optical table needs to be fix.
  * we will decide whether we need clean the mirror surface or not.
  * Once mirror inspection and cleaning (if necessary), then will start alignment for REFL using reflected beam from ITMX.
 * COMM: PDA will be placed EYA.

 * SR3, SR2: height is OK. FR will be tuned.
  * SR3 surface will be inspected.
Line 95: Line 96:
||58||2019/1/22||[[KAGRA/Commissioning/Weekly/20190122/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20190122/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/22(Tue.)

Weekend

Transition from morning work (*:responsible person)

  • Haibo starts joining commissioning work. He will stay 20days.

Report of work (*:responsible person)

  • BS: Two cables were not connected well, so actuation was not correct when measuring TF day before yesterday.
    • TF was measured yesterday but still TF showed something different from the last correct measurement.
    • FR moved 800um.
    • Anyway alignment can be proceeded probably this afternoon.
  • CRY: we found disconnected cables at ITMX.
  • OMC: OMMT was aligned, and it was found that OSEM was touched somewhere.
  • PEM: Ondotori is still not working because of software issue.

Work plan (*:responsible person)

  • COMM: we will check PR3 first, then SR3.
    • Access to PR3 is quite difficult, gate valve needs to be removed or optical table needs to be fix.
    • we will decide whether we need clean the mirror surface or not.
    • Once mirror inspection and cleaning (if necessary), then will start alignment for REFL using reflected beam from ITMX.
  • COMM: PDA will be placed EYA.
  • SR3, SR2: height is OK. FR will be tuned.
    • SR3 surface will be inspected.

KAGRA/Commissioning/DailyWork
<< <  2024 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)