Differences between revisions 583 and 584
Revision 583 as of 2018-12-27 13:05:37
Size: 17002
Comment:
Revision 584 as of 2018-12-28 13:43:48
Size: 17413
Comment:
Deletions are marked like this. Additions are marked like this.
Line 47: Line 47:
=== 2018/12/27(Thur.) === === 2018/12/28(Fri.) ===
Line 51: Line 51:
 * Control room: Miyakawa, Yokogawa, Sugimoto, Kokeyama, Guiguo, Yamamoto, Fujii, Miyo  * Control room: Miyakawa, Nakano, Fujii, Kozakai, Oshino, Yamamoto
Line 53: Line 53:
 * Zoom:  * Zoom: Yokozawa, Enomoto, Yokogawa, Sugimoto, Kokeyama, T.Tanaka, Inoue
Line 70: Line 70:
 *  * It is recommended that everybody should leave mine by PM4.
Line 73: Line 73:
 * Continuously working for TMSX.  * COM: QPD at TMS was placed.
 * Pcal: noise debug.
 * PEM: measurement for radio frequency.
Line 76: Line 78:
 * Some work for PSL, measuring beam profile or something.  * COM: Preparation for Y arm green fiber.
 * CAL: Injection will start today. One of the purpose is to distinguish crosstalk between optical or electro magnetic one.
  * It requires IFO lock.
  * Commissioning team leave IFO locked after work in the night. Then CAL can start working with IFO locked.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment


Meetings

Daily Meetings (1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 1PM
  • ~10min, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2018/12/28(Fri.)

Attendance

  • Control room: Miyakawa, Nakano, Fujii, Kozakai, Oshino, Yamamoto
  • Fan hut:
  • Zoom: Yokozawa, Enomoto, Yokogawa, Sugimoto, Kokeyama, T.Tanaka, Inoue

Laser hazard

AM

PM

Center

PSL

IR & Green

IR & Green

Center

around PR2

IR & Green

IR & Green

Center

behinde SR2&Yfront

IR

IR

X end 1F

IR & Green

IR & Green

Y end 1F

IR

IR

Weekend

Transition from morning work (*:responsible person)

  • It is recommended that everybody should leave mine by PM4.

Report of work (*:responsible person)

  • COM: QPD at TMS was placed.
  • Pcal: noise debug.
  • PEM: measurement for radio frequency.

Work plan (*:responsible person)

  • COM: Preparation for Y arm green fiber.
  • CAL: Injection will start today. One of the purpose is to distinguish crosstalk between optical or electro magnetic one.
    • It requires IFO lock.
    • Commissioning team leave IFO locked after work in the night. Then CAL can start working with IFO locked.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members