Size: 17023
Comment:
|
Size: 17160
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 51: | Line 51: |
=== 2019/1/9(Wed.) === | === 2019/1/15(Mon.) === |
Line 54: | Line 54: |
* Some work for Y arm alignment. | |
Line 56: | Line 57: |
* ICRR network is still not stable. * RT model for SRM is down from yesterday. It will be fixed in the morning. If need to look at, it will be afternoon. |
|
Line 60: | Line 59: |
* MIR: First contact was put on MC mirrors yesterday. It will be removed tomorrow. * IOO: MZ common mode servo was installed. |
* MC was aligned and chamber doors was closed. MC is ready for IFO alignnment. * CAL: Noise hunting. Cutting 5pin of D-SUB cable made 30dB improvement. * PEM: Ondotori setting was finished. We will be added 10 more. * AOS: Done finalization of Y front. Will work on ETMX this week. Needs heavy work inside the ETMX chamber. |
Line 64: | Line 66: |
* PEM: One of the out put of SR3 DAC was connected to PEM signal. * VAC: IXC is being vented. Fabian will look the drift and compensate if needed. * IOO: Noise measurement for optical fiber for green. * |
* Type B: We will do hight adjustments and some tuning for BS or other VIS. * Type A: Needs work at ITMY today. * DGS: We will separate the current rack at ETMX to the second one. It takes whole of this week. * DGS: RFM ID will be changed at ETMX and ETMY. |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/1/15(Mon.)
Weekend
- Some work for Y arm alignment.
Transition from morning work (*:responsible person)
Report of work (*:responsible person)
- MC was aligned and chamber doors was closed. MC is ready for IFO alignnment.
- CAL: Noise hunting. Cutting 5pin of D-SUB cable made 30dB improvement.
- PEM: Ondotori setting was finished. We will be added 10 more.
- AOS: Done finalization of Y front. Will work on ETMX this week. Needs heavy work inside the ETMX chamber.
Work plan (*:responsible person)
- Type B: We will do hight adjustments and some tuning for BS or other VIS.
- Type A: Needs work at ITMY today.
- DGS: We will separate the current rack at ETMX to the second one. It takes whole of this week.
- DGS: RFM ID will be changed at ETMX and ETMY.
KAGRA/Commissioning/DailyWork << < 2025 / 5 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)