Differences between revisions 591 and 592
Revision 591 as of 2019-01-15 09:24:58
Size: 17160
Comment:
Revision 592 as of 2019-01-16 09:19:54
Size: 17156
Comment:
Deletions are marked like this. Additions are marked like this.
Line 51: Line 51:
=== 2019/1/15(Tue.) === === 2019/1/16(Wed.) ===
Line 58: Line 58:
 * We have maintenance today.
Line 60: Line 62:
 * MC was aligned and chamber doors was closed. MC is ready for IFO alignnment.
 * CAL: Noise hunting. Cutting 5pin of D-SUB cable made 30dB improvement.
 * PEM: Ondotori setting was finished. We will be added 10 more.
 * AOS: Done finalization of Y front. Will work on ETMX this week. Needs heavy work inside the ETMX chamber.
 * IOO, VAC: Pumping for MC failed yesterday. TP will start today.
  * MC alignment can be started from this morning.

 * CAL: Debugging ETMX Cal. Reached expected sensitivity. 60dB improvement was seen.
  * Whitening for ETMY was installed yesterday and will be checked today.

 * VIS: ITMY and BS TF are being measured yesterday and today.
  * PR2 will be checked and tuned today.

 * VIS: BS fishing rod is being fixed.
Line 66: Line 75:
 * Type B: We will do hight adjustments and some tuning for BS or other VIS.
 * Type A: Needs work at ITMY today.
 * DGS: We will separate the current rack at ETMX to the second one. It takes whole of this week.
 * DGS: RFM ID will be changed at ETMX and ETMY.

 * COM: Fiber noise measurement. Preparation of electronics for Y arm.
 * AOS: Installation of WAB will start ETMX today.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/16(Wed.)

Weekend

  • Some work for Y arm alignment.

Transition from morning work (*:responsible person)

  • We have maintenance today.

Report of work (*:responsible person)

  • IOO, VAC: Pumping for MC failed yesterday. TP will start today.
    • MC alignment can be started from this morning.
  • CAL: Debugging ETMX Cal. Reached expected sensitivity. 60dB improvement was seen.
    • Whitening for ETMY was installed yesterday and will be checked today.
  • VIS: ITMY and BS TF are being measured yesterday and today.
    • PR2 will be checked and tuned today.
  • VIS: BS fishing rod is being fixed.

Work plan (*:responsible person)

  • COM: Fiber noise measurement. Preparation of electronics for Y arm.
  • AOS: Installation of WAB will start ETMX today.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)