Line 52: Line 52:
=== 2019/1/18(Fri.) === === 2019/1/21(Mon.) ===
Line 59: Line 59:

 * If you open chamber or flange, you must put a label on the door/flange for "when/who" oped/closed door, and leave "current status".
 * COMM: SR alignment will be proceeded in the middle or late of next week
 * Haibo starts joining commissioning work. He will stay 20days.
Line 65: Line 63:
 * IMC: ASC loop was closed. Lock lasted all the night.
 * COMM: Beam is hitting on the center of PR2.
 * PR2: We saw the big pitch difference on Oplev as before.
 * ITMY : IP matrix tuning was done.
  * Needs more time for damping. ITMY will be ready next week for SR alignment.
 * BS: something may be touching or some one of the actuation is not available. It was known by TF measurement.
  * GEO phone was something wrong, and it was replaced and it will be checked soon.
 * SR3(dust) and SR2(FC is left) is something dirty. Hirose-san will look at it on Tuesday.
 * COMM: PD installation at Yend.
  * IR and Green reached to ETMX.
  * It was found that PR3 surface was dirty. Hirose-san will look at it on Tuesday.
Line 71: Line 70:
 * MIR: Yokozawa, Kimura, Tomaru checked the surface of ETMY mirror. It was found that the surface was very dirty by eye and Tcam.
  * It is not sure for the cleaning.
 * Ondotori was something wrong. Connector of power supply may be broken. It will be checked by Yokozawa-kun soon.
Line 74: Line 72:
 * WAB ETMX: Completed and moved in the safe mode. Needs a small remaining work for ITMY.
 
Line 78: Line 74:
 * PR2 and PR3: we will open doors.
 * Type B: needs tuning for BS frequency. GEO phone is something wrong.
 * DGS: X end rack maintenance will finish this Friday or beginning of next week.


 * COMM: Alignment will start this afternoon from FI. We need some iteration of alignment and adjustment of OSEM etc. for PRs and BS.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/21(Mon.)

Weekend

  • Nakano, Enomoto, Yokozawa, Yokogawa, Tomaru, Ushiba Guiguo : Some work for Y arm alignment.

Transition from morning work (*:responsible person)

  • Haibo starts joining commissioning work. He will stay 20days.

Report of work (*:responsible person)

  • BS: something may be touching or some one of the actuation is not available. It was known by TF measurement.
    • GEO phone was something wrong, and it was replaced and it will be checked soon.
  • SR3(dust) and SR2(FC is left) is something dirty. Hirose-san will look at it on Tuesday.
  • COMM: PD installation at Yend.
    • IR and Green reached to ETMX.
    • It was found that PR3 surface was dirty. Hirose-san will look at it on Tuesday.
  • Ondotori was something wrong. Connector of power supply may be broken. It will be checked by Yokozawa-kun soon.

Work plan (*:responsible person)

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1