Differences between revisions 605 and 606
Revision 605 as of 2019-01-23 09:25:04
Size: 18300
Comment:
Revision 606 as of 2019-01-24 09:40:46
Size: 18593
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/1/23(Wed.) === === 2019/1/24(Thur.) ===
Line 55: Line 55:
 * Green: Sugimoto
 * Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto
 * Sun: Nakano, Enomoto, Guiguo, Yokozawa
Line 58: Line 60:
Line 84: Line 87:
 * BS: needs to be fixed or replaced the GEO Phone.
  * BS is ready for alignment to ETMY.
 * MIR: PR3, PR2, PRM were checked and it was found that PR3 was dirty. PR3 will be cleaned eventually ~2/2.
 * COM: we did some preparation for POS table.
 * PEM: Ondotori has been recovered.
 * COM: green beam reached Y end
  * we checked Y-end PDA and centered at ITMY, then green beam from PR2 hit the Y end.

 * Type A:
  * IP position of ITMY is somehow OK, but stepping motor of BF or is not working well.
  * IP of ETMY is locked yesterday.

 * TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone.

 * MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next.

 * DGS: RFM network is available for both X and Y arm.
  * CAM: k1cam0 was recovered.

 * OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame.
Line 91: Line 104:
 * COM: we tried BS alignment yesterday night but we did not succeed. We will try it today again with centering to ITMY.
 * MIR: Cleaning of SR2 will be done today.
 * AOS, COMM: we need install a view port on SR2 chamber.
 * ISS: needs to work on optical table.

 * COM: Alignment of ITMY today.
 * Type A: Releasing ETMY lock.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/24(Thur.)

Weekend

  • Green: Sugimoto
  • Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto
  • Sun: Nakano, Enomoto, Guiguo, Yokozawa

Transition from morning work (*:responsible person)

  • Schedule
    • Current status as of 1/22: IR and Green reached X end PD.
    • 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.

    • 1/22 or 23 Surface inspection for SR mirrors.
    • 1/23 Cleaning HR of SR2.
    • 1/23 BS will be aligned to Y-end PD by IR.
    • 1/24-25 ITMX will be aligned to REFL by IR.
      • 1/24-25 ITMY will be aligned to REFL by IR.
    • 1/26 Beam position of IR at SR3 will be confirmed how far from the center.
    • 1/28-29 SR3 will be aligned to SR2 center by IR.
    • 1/30 Green beam will be injected from SR2 AR surface to Y end PD.
    • 1/31-2/1 Removing bellows at PR and SR area.
    • 1/31-2/1 Cleaning HR of PR3 and AR of SR2
    • 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

    • 2/4-8 Alignment of ETMY -> POS by Green

    • 2/12-15 Closing door for central area, pumping down
      • needs drift monitor for VIS

Report of work (*:responsible person)

  • COM: green beam reached Y end
    • we checked Y-end PDA and centered at ITMY, then green beam from PR2 hit the Y end.
  • Type A:
    • IP position of ITMY is somehow OK, but stepping motor of BF or is not working well.
    • IP of ETMY is locked yesterday.
  • TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone.
  • MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next.
  • DGS: RFM network is available for both X and Y arm.
    • CAM: k1cam0 was recovered.
  • OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame.

Work plan (*:responsible person)

  • COM: Alignment of ITMY today.
  • Type A: Releasing ETMY lock.

KAGRA/Commissioning/DailyWork
<< <  2024 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)