Line 52: Line 52:
=== 2019/1/23(Wed.) === === 2019/2/5(Tue.) ===
Line 56: Line 56:

==== Transition from morning work (*:responsible person) ====
 * Schedule
=== Schedule ===
Line 60: Line 58:
  * --(1/22 Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * 1/22 or 23 Surface inspection for SR mirrors.
  * 1/2
3 Cleaning HR of SR2.

  *
1/23 BS will be aligned to Y-end PD by IR.
  * 1/24-25
ITMX will be aligned to REFL by IR.
   * 1/24-25
ITMY will be aligned to REFL by IR.

  * 1/26
Beam position of IR at SR3 will be confirmed how far from the center.

  *
1/28-29 SR3 will be aligned to SR2 center by IR.
  * 1/30
Green beam will be injected from SR2 AR surface to Y end PD.

  *
1/31-2/1 Removing bellows at PR and SR area.
  *
1/31-2/1 Cleaning HR of PR3 and AR of SR2

  * 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8 Alignment of ETMY -> POS by Green

  * 2/12-15 Closing door for central area, pumping down
  * --(1/22: Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/23: Surface inspection for SR mirrors.)--
  * --(1/24-25: Cleaning HR of SR
3, SRM.)--

  * --(
1/23: BS is aligned to Y-end PD by IR.)--
  * --(1/27:
ITMY is aligned to REFL by IR.)--
  * --(1/27:
ITMX is aligned to REFL by IR.)--
  * --(1/27:
Beam position of IR at SR3 is confirmed how far from the center.)--

  * --(
1/28-29: SR3 is aligned to SR2 center by IR.)--
  * --(1/28: Alignment of SR2 -> SRM by IR.)--
  * --(1/29:
Green beam is injected from SR2 AR surface to Y end PD.)--

  * --(
1/31: Removing bellows at PR and SR area.)--
  * --(
1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2)--

  * 2/4-8: SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8: Alignment of ETMY -> POS by Green

  * 2/12-15: Closing door for central area, pumping down
Line 82: Line 80:

==== Report of work (*:responsible person) ====
 * BS: needs to be fixed or replaced the GEO Phone.
  * BS is ready for alignment to ETMY.
 * MIR: PR3, PR2, PRM were checked and it was found that PR3 was dirty. PR3 will be cleaned eventually ~2/2.
 * COM: we did some preparation for POS table.
 * PEM: Ondotori has been recovered.

==== Work plan (*:responsible person) ====
 * COM: we tried BS alignment yesterday night but we did not succeed. We will try it today again with centering to ITMY.
 * MIR: Cleaning of SR2 will be done today.
 * AOS, COMM: we need install a view port on SR2 chamber.
 * ISS: needs to work on optical table.
==== Note ====

 * Report klog, and gokagra ML if urgent things.

==== Report of work ====
 * Type B: SRM was rotated 180degree.
  * SR2, SR3, SRM: Height adjustment yesterday and this morning.
  * SRMs model were splitter.
 * CAL: Injected beam to ETMY mirror and detected.
 * Type A: ETMY was released, Lucia will work on it.

==== Work plan ====
 * COM: we will start alignment after heights of all SRMs have been aligned.
Line 108: Line 106:
||60||2019/2/5||[[KAGRA/Commissioning/Weekly/20190205/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190205/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/2/5(Tue.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22: Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/23: Surface inspection for SR mirrors.

  • 1/24-25: Cleaning HR of SR3, SRM.

  • 1/23: BS is aligned to Y-end PD by IR.

  • 1/27: ITMY is aligned to REFL by IR.

  • 1/27: ITMX is aligned to REFL by IR.

  • 1/27: Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29: SR3 is aligned to SR2 center by IR.

  • 1/28: Alignment of SR2 -> SRM by IR.

  • 1/29: Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31: Removing bellows at PR and SR area.

  • 1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2

  • 2/4-8: SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

  • 2/4-8: Alignment of ETMY -> POS by Green

  • 2/12-15: Closing door for central area, pumping down
    • needs drift monitor for VIS

Note

  • Report klog, and gokagra ML if urgent things.

Report of work

  • Type B: SRM was rotated 180degree.
    • SR2, SR3, SRM: Height adjustment yesterday and this morning.
    • SRMs model were splitter.
  • CAL: Injected beam to ETMY mirror and detected.
  • Type A: ETMY was released, Lucia will work on it.

Work plan

  • COM: we will start alignment after heights of all SRMs have been aligned.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)