=== 2019/1/24(Thur.) === === 2019/1/29(Tue.) ===
Line 55: Line 55:
 * Green: Sugimoto
 * Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto
 * Sun: Nakano, Enomoto, Guiguo, Yokozawa

==== Transition from morning work (*:responsible person) ====

 * Schedule

=== Schedule ===
Line 63: Line 58:
  * --(1/22 Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * 1/22 or 23 Surface inspection for SR mirrors.
  * 1/2
3 Cleaning HR of SR2.

  *
1/23 BS will be aligned to Y-end PD by IR.
  * 1/24-25
ITMX will be aligned to REFL by IR.
   * 1/24-25
ITMY will be aligned to REFL by IR.

  * 1/26
Beam position of IR at SR3 will be confirmed how far from the center.

  *
1/28-29 SR3 will be aligned to SR2 center by IR.
  * 1/30
Green beam will be injected from SR2 AR surface to Y end PD.

  * 1/31-2/1 Removing bellows at PR and SR area.
  * 1/31-2/1 Cleaning HR of PR3 and AR of SR2

  * 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8 Alignment of ETMY -> POS by Green

  * 2/12-15 Closing door for central area, pumping down
  * --(1/22: Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/23: Surface inspection for SR mirrors.)--
  * --(1/24-25: Cleaning HR of SR
3, SRM.)--

  * --(
1/23: BS is aligned to Y-end PD by IR.)--
  * --(1/27:
ITMY is aligned to REFL by IR.)--
  * --(1/27:
ITMX is aligned to REFL by IR.)--
  * --(1/27:
Beam position of IR at SR3 is confirmed how far from the center.)--

  * --(
1/28-29: SR3 is aligned to SR2 center by IR.)--
  * --(1/28: Alignment of SR2 -> SRM by IR.)--
  * --(1/29:
Green beam is injected from SR2 AR surface to Y end PD.)--

  * 1/31: Removing bellows at PR and SR area.
  * 1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2

  * 2/4-8: SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8: Alignment of ETMY -> POS by Green

  * 2/12-15: Closing door for central area, pumping down
Line 85: Line 80:
Line 87: Line 81:
 * COM: green beam reached Y end
  * we checked Y-end PDA and centered at ITMY, then green beam from PR2 hit the Y end.

 * Type A:
  * IP position of ITMY is somehow OK, but stepping motor of BF or is not working well.
  * IP of ETMY is locked yesterday.

 * TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone.

 * MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next.

 * DGS: RFM network is available for both X and Y arm.
  * CAM: k1cam0 was recovered.

 * OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame.
 * Type B: Hight issues are being fixed now. RT model for SRs should be separated to upper slow one and lower fast one like BS.
 * PRM: Upgrading oplev.
 * IOO: High power beam shutter mirror was dropped. It will be fixed today.
 * ETMY: Stepping motor was not working.
 * AOS: heatsink, for ETMX work.

 * COM: Green laser reached to ETMY.
 * Pedestal was replaced.
 * ISS: PD was installed on second loop.
 * CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
 * ETMY lock was released, but need little more time to make it work.
Line 104: Line 94:

 * COM: Alignment of ITMY today.
 * Type A: Releasing ETMY lock.
 * VAC: removing bellows at PR3 and SR2.
 * MIR: inspection and cleaning PR3 and SR2 by tomorrow.

 * SRM: needs some fine alignment.
 * DGS: weekly maintenance from 9am to 1pm.
 * PEM: Channel names will be replaced on Monday.
 * ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/29(Tue.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22: Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/23: Surface inspection for SR mirrors.

  • 1/24-25: Cleaning HR of SR3, SRM.

  • 1/23: BS is aligned to Y-end PD by IR.

  • 1/27: ITMY is aligned to REFL by IR.

  • 1/27: ITMX is aligned to REFL by IR.

  • 1/27: Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29: SR3 is aligned to SR2 center by IR.

  • 1/28: Alignment of SR2 -> SRM by IR.

  • 1/29: Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31: Removing bellows at PR and SR area.
  • 1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2
  • 2/4-8: SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

  • 2/4-8: Alignment of ETMY -> POS by Green

  • 2/12-15: Closing door for central area, pumping down
    • needs drift monitor for VIS

Report of work (*:responsible person)

  • Type B: Hight issues are being fixed now. RT model for SRs should be separated to upper slow one and lower fast one like BS.
  • PRM: Upgrading oplev.
  • IOO: High power beam shutter mirror was dropped. It will be fixed today.
  • ETMY: Stepping motor was not working.
  • AOS: heatsink, for ETMX work.
  • COM: Green laser reached to ETMY.
  • Pedestal was replaced.
  • ISS: PD was installed on second loop.
  • CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
  • ETMY lock was released, but need little more time to make it work.

Work plan (*:responsible person)

  • VAC: removing bellows at PR3 and SR2.
  • MIR: inspection and cleaning PR3 and SR2 by tomorrow.
  • SRM: needs some fine alignment.
  • DGS: weekly maintenance from 9am to 1pm.
  • PEM: Channel names will be replaced on Monday.
  • ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members