Line 52: | Line 52: |
=== 2019/1/24(Thur.) === | === 2019/1/28(Mon.) === |
Line 55: | Line 55: |
* Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto * Sun: Nakano, Enomoto, Guiguo, Yokozawa |
|
Line 67: | Line 65: |
* 1/24-25 ITMY is aligned to REFL by IR. * 1/24-25 ITMX is aligned to REFL by IR. * 1/24-25 Beam position of IR at SR3 is confirmed how far from the center. |
* --(1/24-25 ITMY is aligned to REFL by IR.)-- * --(1/24-25 ITMX is aligned to REFL by IR.)-- * --(1/24-25 Beam position of IR at SR3 is confirmed how far from the center.)-- |
Line 72: | Line 70: |
* 1/30 Green beam is injected from SR2 AR surface to Y end PD. | * 1/30 --(Green beam is injected from SR2 AR surface)-- to Y end PD. |
Line 85: | Line 83: |
* COM: IR beam reached at Y end * We checked Y-end PDA * Green beam for X arm was used for rough alignment of BS to center at ITMY * Then IR beam hit the Y end. * Type A: * IP position of ITMY is somehow OK, but stepping motor of BF or is not working well. * IP of ETMY is locked yesterday. * TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone. * MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next. * DGS: RFM network is available for both X and Y arm. * CAM: k1cam0 was recovered. * OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame. |
* COM: ITMX and ITMY are aligned and beam was reached to REFL. * Beam back from ITMY has hit SR3. * COM: Green beam was injected from SR and hit almost center of SR3. * ITYM picomotor is not working. |
Line 105: | Line 92: |
* COM: Alignment of ITMY today. * Type A: Releasing ETMY lock. |
* IOO: Needs time to install cables for thermo meter for high power damp. Maybe today, or tomorrow. * SRs: needs tuning for damping on Thursday Friday. |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/1/28(Mon.)
Weekend
Transition from morning work (*:responsible person)
- Schedule
- Current status as of 1/22: IR and Green reached X end PD.
1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.
1/22 or 23 Surface inspection for SR mirrors.
- 1/24-25 Cleaning HR of SRs.
1/23 BS is aligned to Y-end PD by IR.
1/24-25 ITMY is aligned to REFL by IR.
1/24-25 ITMX is aligned to REFL by IR.
1/24-25 Beam position of IR at SR3 is confirmed how far from the center.
- 1/28-29 SR3 is aligned to SR2 center by IR.
1/30 Green beam is injected from SR2 AR surface to Y end PD.
- 1/31-2/1 Removing bellows at PR and SR area.
- 1/31-2/1 Cleaning HR of PR3 and AR of SR2
2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
2/4-8 Alignment of ETMY -> POS by Green
- 2/12-15 Closing door for central area, pumping down
- needs drift monitor for VIS
Report of work (*:responsible person)
- COM: ITMX and ITMY are aligned and beam was reached to REFL.
- Beam back from ITMY has hit SR3.
- COM: Green beam was injected from SR and hit almost center of SR3.
- ITYM picomotor is not working.
Work plan (*:responsible person)
- IOO: Needs time to install cables for thermo meter for high power damp. Maybe today, or tomorrow.
- SRs: needs tuning for damping on Thursday Friday.
KAGRA/Commissioning/DailyWork << < 2024 / 10 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents