Differences between revisions 609 and 610
Revision 609 as of 2019-01-28 09:27:05
Size: 18124
Comment:
Revision 610 as of 2019-01-29 09:27:05
Size: 17940
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/1/28(Mon.) === === 2019/1/29(Tue.) ===
Line 62: Line 62:
  * 1/24-25 Cleaning HR of SRs.   * --(1/24-25 Cleaning HR of SRs.)--
Line 69: Line 69:
  * 1/28-29 SR3 is aligned to SR2 center by IR.   * --(1/28-29 SR3 is aligned to SR2 center by IR.)--
Line 83: Line 83:
 * COM: ITMX and ITMY are aligned and beam was reached to REFL.
  * Beam back from ITMY has hit SR3.
 * COM: Green beam was injected from SR and hit almost center of SR3.
 * ITYM picomotor is not working.
 * COM: IR laser reached to center to SRM.
  * Then Green will be aligned to ETMY by SR3.
 * BIO of IYC was something wrong by RT model.
Line 88: Line 88:

Line 92: Line 90:
 * IOO: Needs time to install cables for thermo meter for high power damp. Maybe today, or tomorrow.
 * SRs: needs tuning for damping on Thursday Friday.
 * SRM: some work for tuning.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/29(Tue.)

Weekend

Transition from morning work (*:responsible person)

  • Schedule
    • Current status as of 1/22: IR and Green reached X end PD.
    • 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.

    • 1/22 or 23 Surface inspection for SR mirrors.

    • 1/24-25 Cleaning HR of SRs.

    • 1/23 BS is aligned to Y-end PD by IR.

    • 1/24-25 ITMY is aligned to REFL by IR.

    • 1/24-25 ITMX is aligned to REFL by IR.

    • 1/24-25 Beam position of IR at SR3 is confirmed how far from the center.

    • 1/28-29 SR3 is aligned to SR2 center by IR.

    • 1/30 Green beam is injected from SR2 AR surface to Y end PD.

    • 1/31-2/1 Removing bellows at PR and SR area.
    • 1/31-2/1 Cleaning HR of PR3 and AR of SR2
    • 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

    • 2/4-8 Alignment of ETMY -> POS by Green

    • 2/12-15 Closing door for central area, pumping down
      • needs drift monitor for VIS

Report of work (*:responsible person)

  • COM: IR laser reached to center to SRM.
    • Then Green will be aligned to ETMY by SR3.
  • BIO of IYC was something wrong by RT model.

Work plan (*:responsible person)

  • SRM: some work for tuning.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members