Differences between revisions 610 and 611
Revision 610 as of 2019-01-29 09:27:05
Size: 17940
Comment:
Revision 611 as of 2019-01-30 09:16:02
Size: 18202
Comment:
Deletions are marked like this. Additions are marked like this.
Line 56: Line 56:
==== Transition from morning work (*:responsible person) ====

 * Schedule
=== Schedule ===
Line 62: Line 60:
  * --(1/24-25 Cleaning HR of SRs.)--   * --(1/24-25 Cleaning HR of SR3, SRM.)--
Line 70: Line 68:
  * 1/30 --(Green beam is injected from SR2 AR surface)-- to Y end PD.   * --(1/30 Green beam is injected from SR2 AR surface to Y end PD.)--
Line 73: Line 71:
  * 1/31-2/1 Cleaning HR of PR3 and AR of SR2

  * 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 1/31-2/1 Cleaning HR of PR3 and HR, AR of SR2

  * 2/4-8 --(Alignment of SR2 -> SRM by IR)--, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
Line 81: Line 79:
Line 83: Line 80:
 * COM: IR laser reached to center to SRM.
  * Then Green will be aligned to ETMY by SR3.
 * BIO of IYC was something wrong by RT model.

 
 * COM: Green laser reached to ETMY.
 * Pedestal was replaced.
 * ISS: PD was installed on second loop.
 * CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
 * ETMY lock was released, but need little more time to make it work.
Line 89: Line 87:

 * SRM: some work for tuning.

 * SRM: needs some fine alignment.
 * DGS: weekly maintenance from 9am to 1pm.
 * PEM: Channel names will be replaced on Monday.
 * ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/1/29(Tue.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/22 or 23 Surface inspection for SR mirrors.

  • 1/24-25 Cleaning HR of SR3, SRM.

  • 1/23 BS is aligned to Y-end PD by IR.

  • 1/24-25 ITMY is aligned to REFL by IR.

  • 1/24-25 ITMX is aligned to REFL by IR.

  • 1/24-25 Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29 SR3 is aligned to SR2 center by IR.

  • 1/30 Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31-2/1 Removing bellows at PR and SR area.
  • 1/31-2/1 Cleaning HR of PR3 and HR, AR of SR2
  • 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

  • 2/4-8 Alignment of ETMY -> POS by Green

  • 2/12-15 Closing door for central area, pumping down
    • needs drift monitor for VIS

Report of work (*:responsible person)

  • COM: Green laser reached to ETMY.
  • Pedestal was replaced.
  • ISS: PD was installed on second loop.
  • CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
  • ETMY lock was released, but need little more time to make it work.

Work plan (*:responsible person)

  • SRM: needs some fine alignment.
  • DGS: weekly maintenance from 9am to 1pm.
  • PEM: Channel names will be replaced on Monday.
  • ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)