18435
Comment:
|
19594
|
Deletions are marked like this. | Additions are marked like this. |
Line 57: | Line 57: |
* 2/28-3/5: Fixing PRMs and SRMs * 3/2-5: Re-alignment * 3/6-7: Closing |
* 2/28-3/6: Health check and maintenance for VIS * --(PRM: One flag was dropped. -> leave it)-- * PRM: Misalignment does not reach where beam hits damper. -> 3/4-6 * --(3/5 PR3: range -> incline by 20-30mrad at mirror because of bistable. -> 3/5)-- * BS: Yaw offset adjustment by hand. -> 3/5-6 * 3/2-6: Re-alignment * 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water. * 3/7: Closing * 3/8: pump down |
Line 63: | Line 70: |
* --(3/5: EYA remaining works by Enomoto, Inoue.)-- | |
Line 64: | Line 72: |
* 3/5-6: Closing * 3/6~ : Yend pumpdown 3/6~ |
* 3/5: AOS EY and EX(if they have time) work. * 3/6: Y end closing (no laser hazard at least in the morning) * Alignment to ETMX by 3/7 morning * 3/7: Y end pump down |
Line 72: | Line 82: |
* 2/23-3/10: Xend Pcal finalization 1 * Periscope installation |
* 2/23-3/6: Xend Pcal finalization 1 * --(Periscope installation)-- |
Line 75: | Line 85: |
* 3/5: ETMX aligned * 3/5-3/10: Xend Pcal finalization 2 * 3/11,12 Xend WAB finalization * 3/19,20, Heatlink etc. |
* 3/5 and 3/11~: ETMX seems to be hitting somewhere? Tuning was not enough(by Takahashi). * 3/6: ETMX aligned with oplev accuracy * 3/5: AOS EY and EX(if they have time) work. * 3/6: Green X alignment (no IR), and no hazard at Y end. * 3/9-10(fastest, then 3/23): Pcal finalization * 3/11, 18,19: Xend WAB finalization. * 3/19: Heatlink etc. * 3/19: ETMX finalization by Takahashi * 3/21 closing |
Line 82: | Line 97: |
* 3/11~ : Night work starts | * 3/11~ : Night work starts, daily meeting will be moved to 1PM * Summary of work will last for a while in the morning meeting. |
Line 94: | Line 110: |
* PR3 was tuned once but oplev was gone again. Needs tuning one more day. * Type A: ETMX seems not healthy. To be fixed the next week. * Type B:Offset on IP of BS was seen but not real motion. * IOO: Beam damp for misalignment of PRM seems not working well. Mirror cannot be tilted well. * CAL: Pcal alignment was done. AOS will finish finalization. We need to confirm scheduling at sitework meeting or commissioning meeting. |
* Type B: Fixed tilt and adjusted OSEMs. TF shows that PR3 seems to be healthy now. * Green beam reached ETMX * PRM was touching at several places. Needs to measure TF again. * BS: Manual adjustment for yaw was done. Pitch offset has big offset and probably Oplev may be no reference anymore. Needs alignment to ETMY. * Pcal: ETMY was done. ETMX will be done today. * ETMX: no touching was found, but some of upper stage did not move. It seems to be possible to align. |
Line 103: | Line 118: |
* IOO: Yamako-kun will do noise hunting work on MZ. Needs alignment for iMC for alignment to ETMY. * VAC: cleaning at ETMY. |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/3/5(Tue.)
Schedule
- Center
2/26-27: Venting
- 2/28-3/6: Health check and maintenance for VIS
PRM: One flag was dropped. -> leave it
PRM: Misalignment does not reach where beam hits damper. -> 3/4-6
3/5 PR3: range -> incline by 20-30mrad at mirror because of bistable. -> 3/5
BS: Yaw offset adjustment by hand. -> 3/5-6
- 3/2-6: Re-alignment
- 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.
- 3/7: Closing
- 3/8: pump down
- Yend
1/25-2/20: Yend Pcal finalization
3/5: EYA remaining works by Enomoto, Inoue.
- 2/25-3/4: Yend WAB finalization
- 3/5: AOS EY and EX(if they have time) work.
- 3/6: Y end closing (no laser hazard at least in the morning)
- Alignment to ETMX by 3/7 morning
- 3/7: Y end pump down
- 3/7,8: leak test
- Xend
2/11-2/14: Xend NAB installation
2/21: Removing FC, Payload release
2/27: ETMX release
- 2/23-3/6: Xend Pcal finalization 1
Periscope installation
- Beam position by IR and Green
- 3/5 and 3/11~: ETMX seems to be hitting somewhere? Tuning was not enough(by Takahashi).
- 3/6: ETMX aligned with oplev accuracy
- 3/5: AOS EY and EX(if they have time) work.
- 3/6: Green X alignment (no IR), and no hazard at Y end.
- 3/9-10(fastest, then 3/23): Pcal finalization
- 3/11, 18,19: Xend WAB finalization.
- 3/19: Heatlink etc.
- 3/19: ETMX finalization by Takahashi
- 3/21 closing
- 3/22 Pumping down
- Leak test
- 3/11~ : Night work starts, daily meeting will be moved to 1PM
- Summary of work will last for a while in the morning meeting.
- 2/18-3/22 DRMI commissioning
- 3/11-4/5 Y arm commissioning
- 3/25-4/5 FPMI commissioning
Note
Weekend
Report of work
- Type B: Fixed tilt and adjusted OSEMs. TF shows that PR3 seems to be healthy now.
- Green beam reached ETMX
- PRM was touching at several places. Needs to measure TF again.
- BS: Manual adjustment for yaw was done. Pitch offset has big offset and probably Oplev may be no reference anymore. Needs alignment to ETMY.
- Pcal: ETMY was done. ETMX will be done today.
- ETMX: no touching was found, but some of upper stage did not move. It seems to be possible to align.
Work plan
- IOO: Yamako-kun will do noise hunting work on MZ. Needs alignment for iMC for alignment to ETMY.
- VAC: cleaning at ETMY.
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools