Differences between revisions 611 and 667 (spanning 56 versions)
Revision 611 as of 2019-01-30 09:16:02
Size: 18202
Comment:
Revision 667 as of 2019-03-26 08:55:04
Size: 20181
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/1/29(Tue.) === === 2019/3/25(Mon.) ===

=== Schedule ===
 * Center
  * --(2/26-27: Venting)--
  * 2/28-3/15: Health check and maintenance for VIS
   * --(PRM: One flag was dropped. -> leave it)--
   * --(3/4-14 PRM: Misalignment does not reach where beam hits damper.)--
   * --(3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.)--
   * --(3/15: BS: Yaw offset adjustment by hand. -> 3/5-6)--
    * --(3/12: BS ok)--
   * --(3/15: some SRs work)--

  * --(3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.)--
  * --(3/18: Re-alignment)--
  * --(3/19-21: Closing)--
  * --(3/22: Pump down)--
  * --(3/25: Venting)--
  * 3/27: Fixing PR2
  * 4/3: Closing and pump down

 * ITMX:
  * --(3/19: Cooling stop)--
  * 3/25: Venting start
  * 3/27: Opning chamber
  * 3/27~: Fixing thermal touch
  * ~4/3: closing chamber and start pumping down.
  * 4/12: Cooling starts.

 * Xend
  * --(2/11-2/14: Xend NAB installation)--
  * --(2/21: Removing FC, Payload release)--
   * --(2/27: ETMX release)--
  * --(2/23-3/6: Xend Pcal finalization 1)--
   * --(Periscope installation)--
   * --(3/6: Beam position by IR and Green)--
  * --(3/5 AOS: EY and EX(if they have time) work.)--
  * --(3/6: Green X alignment (no IR), and no hazard at Y end.)--
  * --(3/11, ~20: Xend WAB finalization.)--
  * --(3/11~3/15: ETMX tuning.)--
  * --(3/19: ETMX finalization by Takahashi)--
  * --(3/18,19: ETMX alignement)--
  * --(3/23-24: Pcal alignment)--
  * --(3/24: Removing PD)--
  * 3/25: closing and pump down
  * 4/12: Cooling start

 * Yend
  * --(1/25-2/20: Yend Pcal finalization)--
  * --(3/5: EYA remaining works by Enomoto, Inoue.)--
  * --(2/25-3/5: Yend WAB finalization)--
  * --(3/6: Y end closing (no laser hazard at least in the morning))--
  * --(3/7: Y end pump down)--
  * --(3/22-23: leak test)--
  * 3/26: Venting start
  * 3/28~: Fixing short inside chamber
  * ~4/2: closing chamber and start pumping down.
  * 4/10: Cooling starts.


 * 4/1~ : Night work starts, daily meeting will be moved to 1PM
  * Summary of work will last for a while in the morning meeting.

 * --(2/18-2/22: PRMI commissioning)--
 * End of April~: DRMI commissioning
 * End of April~: Y arm commissioning
 * ~End of May: FPMI commissioning

==== Note ====
  * Official night work starts 4/1.
Line 56: Line 125:
=== Schedule ===
  * Current status as of 1/22: IR and Green reached X end PD.
  * --(1/22 Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/22 or 23 Surface inspection for SR mirrors.)--
  * --(1/24-25 Cleaning HR of SR3, SRM.)--

  * --(1/23 BS is aligned to Y-end PD by IR.)--
  * --(1/24-25 ITMY is aligned to REFL by IR.)--
  * --(1/24-25 ITMX is aligned to REFL by IR.)--
  * --(1/24-25 Beam position of IR at SR3 is confirmed how far from the center.)--

  * --(1/28-29 SR3 is aligned to SR2 center by IR.)--
  * --(1/30 Green beam is injected from SR2 AR surface to Y end PD.)--

  * 1/31-2/1 Removing bellows at PR and SR area.
  * 1/31-2/1 Cleaning HR of PR3 and HR, AR of SR2

  * 2/4-8 --(Alignment of SR2 -> SRM by IR)--, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8 Alignment of ETMY -> POS by Green

  * 2/12-15 Closing door for central area, pumping down
   * needs drift monitor for VIS

==== Report of work (*:responsible person) ====
 * COM: Green laser reached to ETMY.
 * Pedestal was replaced.
 * ISS: PD was installed on second loop.
 * CAL: Green beam monitor at ETMY will work, and needs fine alignment for finalization.
 * ETMY lock was released, but need little more time to make it work.

==== Work plan (*:responsible person) ====
 * SRM: needs some fine alignment.
 * DGS: weekly maintenance from 9am to 1pm.
 * PEM: Channel names will be replaced on Monday.
 * ETMY should be ready by the next week for Pcal finalization and ETM alignment to BS.
  ==== Report of work ====

 * Type Bp: It was fount that there was a big bump at PR2 last week, and Vertical of Oplev was out of range.
  * It was decided to vent again. Venting starts 11am today.

 * CAL: Beam position of Pcal was fixed at ETMX.


==== Work plan ====
 * Vent at center area.
Line 103: Line 148:
||64||2019/3/26||[[KAGRA/Commissioning/Weekly/20190326/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190326/Minute|Minute]]|| ||
||63||2019/3/11||[[KAGRA/Commissioning/Weekly/20190311/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190311/Minute|Minute]]|| ||
||62||2019/3/5||[[KAGRA/Commissioning/Weekly/20190305/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190305/Minute|Minute]]|| ||
||61||2019/2/19||[[KAGRA/Commissioning/Weekly/20190219/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190219/Minute|Minute]]|| ||
||60||2019/2/5||[[KAGRA/Commissioning/Weekly/20190205/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190205/Minute|Minute]]|| ||
Line 166: Line 216:
 * 2019/3/8: Scheduling for FPMI [[/Meetings/Others/20190308/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190308|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/3/25(Mon.)

Schedule

  • Center
    • 2/26-27: Venting

    • 2/28-3/15: Health check and maintenance for VIS
      • PRM: One flag was dropped. -> leave it

      • 3/4-14 PRM: Misalignment does not reach where beam hits damper.

      • 3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.

      • 3/15: BS: Yaw offset adjustment by hand. -> 3/5-6

        • 3/12: BS ok

      • 3/15: some SRs work

    • 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.

    • 3/18: Re-alignment

    • 3/19-21: Closing

    • 3/22: Pump down

    • 3/25: Venting

    • 3/27: Fixing PR2
    • 4/3: Closing and pump down
  • ITMX:
    • 3/19: Cooling stop

    • 3/25: Venting start
    • 3/27: Opning chamber
    • 3/27~: Fixing thermal touch
    • ~4/3: closing chamber and start pumping down.
    • 4/12: Cooling starts.
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

      • 2/27: ETMX release

    • 2/23-3/6: Xend Pcal finalization 1

      • Periscope installation

      • 3/6: Beam position by IR and Green

    • 3/5 AOS: EY and EX(if they have time) work.

    • 3/6: Green X alignment (no IR), and no hazard at Y end.

    • 3/11, ~20: Xend WAB finalization.

    • 3/11~3/15: ETMX tuning.

    • 3/19: ETMX finalization by Takahashi

    • 3/18,19: ETMX alignement

    • 3/23-24: Pcal alignment

    • 3/24: Removing PD

    • 3/25: closing and pump down
    • 4/12: Cooling start
  • Yend
    • 1/25-2/20: Yend Pcal finalization

    • 3/5: EYA remaining works by Enomoto, Inoue.

    • 2/25-3/5: Yend WAB finalization

    • 3/6: Y end closing (no laser hazard at least in the morning)

    • 3/7: Y end pump down

    • 3/22-23: leak test

    • 3/26: Venting start
    • 3/28~: Fixing short inside chamber
    • ~4/2: closing chamber and start pumping down.
    • 4/10: Cooling starts.
  • 4/1~ : Night work starts, daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • 2/18-2/22: PRMI commissioning

  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

  • Official night work starts 4/1.

Weekend

Report of work

  • Type Bp: It was fount that there was a big bump at PR2 last week, and Vertical of Oplev was out of range.
    • It was decided to vent again. Venting starts 11am today.
  • CAL: Beam position of Pcal was fixed at ETMX.

Work plan

  • Vent at center area.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

64

2019/3/26

Agenda

See agenda page

Minute

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)