Line 52: Line 52:
=== 2019/3/1(Fri.) === === 2019/3/20(Wed.) ===
Line 57: Line 57:
  * 2/28: Fixing --(PR2, PR3)--
   * 3/1: Fixing PRM, and SRM
  * 3/2-5: Re-alignment
  * 3/5-6: Closing
  * 2/28-3/15: Health check and maintenance for VIS
   * --(PRM: One flag was dropped. -> leave it)--
   * --(3/4-14 PRM: Misalignment does not reach where beam hits damper.)--
   * --(3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.)--
   * --(3/15: BS: Yaw offset adjustment by hand. -> 3/5-6)--
    * --(3/12: BS ok)--
   * --(3/15: some SRs work)--

  * --(3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.)--
  * --(3/18: Re-alignment)--
  * 3/19-21: Closing
  * 3/22: pump down

 * ITMX:
  * 3/19: Cooling stop
  * 3/28: Opning chamber
  * 3/28: Fixing thermal touch
  * 3/29: closing chamber and start pum
Line 64: Line 78:
  * 2/25-3/4: Yend WAB finalization
  * 3/5-6: Closing
  * 3/6~ : Yend pumpdown 3/6~
   * 3/7,8: leak test
  * --(3/5: EYA remaining works by Enomoto, Inoue.)--
  * --(2/25-3/5: Yend WAB finalization)--
  * --(3/6: Y end closing (no laser hazard at least in the morning))--
  * --(3/7: Y end pump down)--
  * 3/21: leak test
  * 3/27: cooling start
Line 73: Line 89:
  * 2/23-3/10: Xend Pcal finalization 1
   * Periscope installation
   * Beam position by IR and Green
  * 3/5: ETMX aligned
  * 3/5-3/10: Xend Pcal finalization 2
  * 3/11,12 Xend WAB finalization
  * 3/19,20, Heatlink etc.
  * 3/22 Pumping down
   * Leak test
  * --(2/23-3/6: Xend Pcal finalization 1)--
   * --(Periscope installation)--
   * --(3/6: Beam position by IR and Green)--
  * --(3/5 AOS: EY and EX(if they have time) work.)--
  * --(3/6: Green X alignment (no IR), and no hazard at Y end.)--
  * 3/11, 18,19: Xend WAB finalization.
  * --(3/11~3/15: ETMX tuning.)--
  * 3/19: Heatlink etc.
  * 3/19: ETMX finalization by Takahashi
  * 3/18,19: ETMX alignement
  * 3/23-24: Pcal alignment
  * 3/25: closing
  * 3/26: Pumping down
  * 4/2-4: Leak test
  * 3/27: Cooling start
Line 83: Line 105:
 * 3/11~ : Night work starts

 * 2/18-3/22 DRMI commissioning
 * 3/11-4/5 Y arm commissioning
 * 3/25-4/5 FPMI commissioning
 * 3/18~ : Night work starts, daily meeting will be moved to 1PM
  * Summary of work will last for a while in the morning meeting.

 * 2/18-2/22: PRMI commissioning
 * 3/25~?: DRMI commissioning
 * 3/25-4/19: Y arm commissioning
 * 3/25-4/19: FPMI commissioning
Line 90: Line 114:
 * DIO is almost out of storage. Please return if you have it which is not used anymore.  * Night work does not start from 3/11 due to the 2weeks delay by VIS troubles.
  * It does not mean that night work is prohibited but it means that officially night shift responsible person won't be assigned and we have no daily meeting at 1pm.
  * Official night work starts 3/18 or 3/25, but not determined yet.
Line 94: Line 120:
 
Line 95: Line 122:
 * PRM had flagg dropped off. We leave it in this vent.
 * PR2 and PR3 needs more inspection.
  * PR3 needs more gap to be moved.
  * PR2 had bad LVDT circuit.

 * SRM had a touching part and it was fixed. It seems to be healthy now.
  * IM has still yaw drift caused by cable clamp.
  * SRM RT models are being modified.
 * COM: RF harmonic generator had less signal than expected.
 * Type B: Basically health check shows everything was ok.
  * One of the o-ring was fallen inside chamber, it will be fixed today.
  * IP LVDT of BS is something wrong. Chamber will be opened again?

 * Type Bp: PRM was concluded nothing was touching. Today final check will be done.
  * Health check was done or sill is going one.
  * There is some possibility of touching when PRM is misaligned, but it does not matter.

 * Type A: ETMX cryopayload was touching because upper part was too low. It was lifted up and cryopayload is free now. The gap is now 3mm since we are in room temperature.
  * Needs control of damp is the highest priority for IFO alignment.
Line 107: Line 134:
 * COM: Alignment work will start today.
 * PRM: Vibration measurement of cooler.
 * PEM: Needs work at ETMX.
 * Takahashi-san will check ETMX and if something is wrong he will fix.
 * MIF: alignment work will be performed this afternoon.
Line 122: Line 149:
||63||2019/3/11||[[KAGRA/Commissioning/Weekly/20190311/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190311/Minute|Minute]]|| ||
||62||2019/3/5||[[KAGRA/Commissioning/Weekly/20190305/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190305/Minute|Minute]]|| ||
Line 187: Line 216:
 * 2019/3/8: Scheduling for FPMI [[/Meetings/Others/20190308/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190308|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/3/20(Wed.)

Schedule

  • Center
    • 2/26-27: Venting

    • 2/28-3/15: Health check and maintenance for VIS
      • PRM: One flag was dropped. -> leave it

      • 3/4-14 PRM: Misalignment does not reach where beam hits damper.

      • 3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.

      • 3/15: BS: Yaw offset adjustment by hand. -> 3/5-6

        • 3/12: BS ok

      • 3/15: some SRs work

    • 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.

    • 3/18: Re-alignment

    • 3/19-21: Closing
    • 3/22: pump down
  • ITMX:
    • 3/19: Cooling stop
    • 3/28: Opning chamber
    • 3/28: Fixing thermal touch
    • 3/29: closing chamber and start pum
  • Yend
    • 1/25-2/20: Yend Pcal finalization

    • 3/5: EYA remaining works by Enomoto, Inoue.

    • 2/25-3/5: Yend WAB finalization

    • 3/6: Y end closing (no laser hazard at least in the morning)

    • 3/7: Y end pump down

    • 3/21: leak test
    • 3/27: cooling start
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

      • 2/27: ETMX release

    • 2/23-3/6: Xend Pcal finalization 1

      • Periscope installation

      • 3/6: Beam position by IR and Green

    • 3/5 AOS: EY and EX(if they have time) work.

    • 3/6: Green X alignment (no IR), and no hazard at Y end.

    • 3/11, 18,19: Xend WAB finalization.
    • 3/11~3/15: ETMX tuning.

    • 3/19: Heatlink etc.
    • 3/19: ETMX finalization by Takahashi
    • 3/18,19: ETMX alignement
    • 3/23-24: Pcal alignment
    • 3/25: closing
    • 3/26: Pumping down
    • 4/2-4: Leak test
    • 3/27: Cooling start
  • 3/18~ : Night work starts, daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • 2/18-2/22: PRMI commissioning
  • 3/25~?: DRMI commissioning
  • 3/25-4/19: Y arm commissioning
  • 3/25-4/19: FPMI commissioning

Note

  • Night work does not start from 3/11 due to the 2weeks delay by VIS troubles.
    • It does not mean that night work is prohibited but it means that officially night shift responsible person won't be assigned and we have no daily meeting at 1pm.
    • Official night work starts 3/18 or 3/25, but not determined yet.

Weekend

Report of work

  • Type B: Basically health check shows everything was ok.
    • One of the o-ring was fallen inside chamber, it will be fixed today.
    • IP LVDT of BS is something wrong. Chamber will be opened again?
  • Type Bp: PRM was concluded nothing was touching. Today final check will be done.
    • Health check was done or sill is going one.
    • There is some possibility of touching when PRM is misaligned, but it does not matter.
  • Type A: ETMX cryopayload was touching because upper part was too low. It was lifted up and cryopayload is free now. The gap is now 3mm since we are in room temperature.
    • Needs control of damp is the highest priority for IFO alignment.

Work plan

  • PEM: Needs work at ETMX.
  • Takahashi-san will check ETMX and if something is wrong he will fix.
  • MIF: alignment work will be performed this afternoon.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)