19892
Comment:
|
20457
|
Deletions are marked like this. | Additions are marked like this. |
Line 52: | Line 52: |
=== 2019/3/11(Mon.) === | === 2019/3/18(Mon.) === |
Line 59: | Line 59: |
* --(3/4-14 PRM: Misalignment does not reach where beam hits damper.)-- | |
Line 60: | Line 61: |
* 3/4-8 PRM: Misalignment does not reach where beam hits damper. * ~3/15 BS: Yaw offset adjustment by hand. -> 3/5-6 |
* --(3/15: BS: Yaw offset adjustment by hand. -> 3/5-6)-- * --(3/12: BS ok)-- * --(3/15: some SRs work)-- |
Line 65: | Line 67: |
* 3/19: Closing * 3/20: pump down |
* 3/19-21: Closing * 3/22: pump down |
Line 74: | Line 76: |
* --(3/7,8: leak test)-- | * 3/21: leak test * 3/27: cooling start |
Line 86: | Line 89: |
* 3/11~3/15: ETMX tuning. | * --(3/11~3/15: ETMX tuning.)-- |
Line 90: | Line 93: |
* 3/21 closing * 3/22 Pumping down * Leak test |
* 3/23-24: Pcal alignment * 3/25: closing * 3/26: Pumping down * 4/2-4: Leak test * 3/27: Cooling start |
Line 109: | Line 114: |
Line 110: | Line 116: |
* Type Bp: health check PR3 seems to be OK. * Type B: SR2 and SR3 SRM are fine. SRM had glitch. * IM drift seem to be zero and opposite direction. * Type A: F3 of ETMY seems to be stuck somehow, by that temperature changed or vacuum started? * Temperature is low under 20degree at 1st floor of ETMY. * PEM: finished work at ETMX area. |
* Type B: Basically health check shows everything was ok. * One of the o-ring was fallen inside chamber, it will be fixed today. * IP LVDT of BS is something wrong. Chamber will be opened again? * Type Bp: PRM was concluded nothing was touching. Today final check will be done. * Health check was done or sill is going one. * There is some possibility of touching when PRM is misaligned, but it does not matter. * Type A: ETMX cryopayload was touching because upper part was too low. It was lifted up and cryopayload is free now. The gap is now 3mm since we are in room temperature. * Needs control of damp is the highest priority for IFO alignment. |
Line 121: | Line 128: |
* AOS: Finalization of WAB at ETMX will start today. It lasts this week. |
* PEM: Needs work at ETMX. * Takahashi-san will check ETMX and if something is wrong he will fix. * MIF: alignment work will be performed this afternoon. |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/3/18(Mon.)
Schedule
- Center
2/26-27: Venting
- 2/28-3/15: Health check and maintenance for VIS
PRM: One flag was dropped. -> leave it
3/4-14 PRM: Misalignment does not reach where beam hits damper.
3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.
3/15: BS: Yaw offset adjustment by hand. -> 3/5-6
3/12: BS ok
3/15: some SRs work
3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.
- 3/18-19: Re-alignment
- 3/19-21: Closing
- 3/22: pump down
- Yend
1/25-2/20: Yend Pcal finalization
3/5: EYA remaining works by Enomoto, Inoue.
2/25-3/5: Yend WAB finalization
3/6: Y end closing (no laser hazard at least in the morning)
3/7: Y end pump down
- 3/21: leak test
- 3/27: cooling start
- Xend
2/11-2/14: Xend NAB installation
2/21: Removing FC, Payload release
2/27: ETMX release
2/23-3/6: Xend Pcal finalization 1
Periscope installation
3/6: Beam position by IR and Green
3/5 AOS: EY and EX(if they have time) work.
3/6: Green X alignment (no IR), and no hazard at Y end.
- 3/11, 18,19: Xend WAB finalization.
3/11~3/15: ETMX tuning.
- 3/19: Heatlink etc.
- 3/19: ETMX finalization by Takahashi
- 3/18,19: ETMX alignement
- 3/23-24: Pcal alignment
- 3/25: closing
- 3/26: Pumping down
- 4/2-4: Leak test
- 3/27: Cooling start
- 3/18~ : Night work starts, daily meeting will be moved to 1PM
- Summary of work will last for a while in the morning meeting.
- 2/18-2/22: PRMI commissioning
- 3/25~?: DRMI commissioning
- 3/25-4/19: Y arm commissioning
- 3/25-4/19: FPMI commissioning
Note
- Night work does not start from 3/11 due to the 2weeks delay by VIS troubles.
- It does not mean that night work is prohibited but it means that officially night shift responsible person won't be assigned and we have no daily meeting at 1pm.
- Official night work starts 3/18 or 3/25, but not determined yet.
Weekend
Report of work
- Type B: Basically health check shows everything was ok.
- One of the o-ring was fallen inside chamber, it will be fixed today.
- IP LVDT of BS is something wrong. Chamber will be opened again?
- Type Bp: PRM was concluded nothing was touching. Today final check will be done.
- Health check was done or sill is going one.
- There is some possibility of touching when PRM is misaligned, but it does not matter.
- Type A: ETMX cryopayload was touching because upper part was too low. It was lifted up and cryopayload is free now. The gap is now 3mm since we are in room temperature.
- Needs control of damp is the highest priority for IFO alignment.
Work plan
- PEM: Needs work at ETMX.
- Takahashi-san will check ETMX and if something is wrong he will fix.
- MIF: alignment work will be performed this afternoon.
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools