Differences between revisions 606 and 701 (spanning 95 versions)
Revision 606 as of 2019-01-24 09:40:46
Size: 18593
Comment:
Revision 701 as of 2019-04-11 09:15:35
Size: 20115
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:
==== Daily Meetings (9AM) ==== ==== Daily Meetings (9AM, 1PM) ====
Line 45: Line 45:
=== Daily meeting === == Daily meeting ==
Line 52: Line 52:
=== 2019/1/24(Thur.) ===

=== Weekend ===
 * Green: Sugimoto
 * Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto
 * Sun: Nakano, Enomoto, Guiguo, Yokozawa

==== Transition from morning work (*:responsible person) ====

 * Schedule
  * Current status as of 1/22: IR and Green reached X end PD.
  * --(1/22 Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * 1/22 or 23 Surface inspection for SR mirrors.
  * 1/23 Cleaning HR of SR2.

  * 1/23 BS will be aligned to Y-end PD by IR.
  * 1/24-25 ITMX will be aligned to REFL by IR.
   * 1/24-25 ITMY will be aligned to REFL by IR.

  * 1/26 Beam position of IR at SR3 will be confirmed how far from the center.

  * 1/28-29 SR3 will be aligned to SR2 center by IR.
  * 1/30 Green beam will be injected from SR2 AR surface to Y end PD.

  * 1/31-2/1 Removing bellows at PR and SR area.
  * 1/31-2/1 Cleaning HR of PR3 and AR of SR2

  * 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR
  * 2/4-8 Alignment of ETMY -> POS by Green

  * 2/12-15 Closing door for central area, pumping down
   * needs drift monitor for VIS


==== Report of work (*:responsible person) ====
 * COM: green beam reached Y end
  * we checked Y-end PDA and centered at ITMY, then green beam from PR2 hit the Y end.

 * Type A:
  * IP position of ITMY is somehow OK, but stepping motor of BF or is not working well.
  * IP of ETMY is locked yesterday.

 * TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone.

 * MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next.

 * DGS: RFM network is available for both X and Y arm.
  * CAM: k1cam0 was recovered.

 * OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame.

==== Work plan (*:responsible person) ====

 * COM: Alignment of ITMY today.
 * Type A: Releasing ETMY lock.
=== 2019/4/11(Thur.) ===

==== Schedule ====
 * Center
  * --(3/25: Venting)--
  * --(3/27-4/9: Fixing PR2 or others)--
   * --(4/4 -4/5: Gluing)--
   * --(4/8: alignment check)--
   * --(4/8-10: OSEM adjustment)--
  * --(4/10: alignment check)--
  * 4/11: VIS final health check
  * 4/11-12: Closing
  * 4/12: Pump down
  * 4/15~: Leak check

 * ITMX:
  * --(3/19: Cooling stop)--
  * --(3/25: Venting start)--
  * --(3/27: Opning chamber)--
  * --(3/27~: Fixing thermal touch)--
  * --(4/2~: closing chamber and start pumping down)--
  * --(4/11: Cooling starts.)--

 * Xend
  * --(3/25: closing and pump down)--
  * --(4/8: Leak check)--
  * --(4/9-10: venting)--
  * 4/11: Exchange a broken LED for Photo sensor
  * 4/12: closing chamber and start pumping down
  * 4/15: Leak check
  * 4/19(or 22): Cooling start

 * Yend
  * --(3/26: Venting start)--
  * --(3/28~: Fixing short inside chamber)--
  * --(4/3: Fixing F0 actuator)--
  * --(4/4~: closing chamber and start pumping down.)--
  * --(4/11: Cooling starts.)--

 * April: Measurement of TF, payload diagonalization on ITMX
 * End of April~: DRMI commissioning
 * End of April~: Y arm commissioning
 * ~End of May: FPMI commissioning

==== Note ====
  * Commissioning meeting moves at 1PM from this week.

==== Night work ====
 * IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

==== Weekend ====
 * Weekend work at the control room: Fabian for monitor, Lucia for monitor and control.
 
==== Report of work ====
 * Type B: OSEM adjustments for SR2 and PR2 were done.
  * SR2 pitch had big offset.
 * Type B: Offset for IP of BS was removed.
  * Top cover was removed.
 * MIF: The final alignment check was done last night.

==== Work plan ====
 * VIS: Health check for all VIS in the central part today.
 * CRY: A LED for PD sensor ETMX will be replaced.
 * VIS: Monitor for ITMX and ETMY will be by Lucia.
  * Monitor for center tomorrow will be by Fabian, Okutomi.
 * CRY: cryo payload should be monitored by BF for pitch, XX for vertical by Ushiba with VIS team.

 * Weekend work at the control room: Fabian for monitor, Lucia for monitor and control.
Line 116: Line 128:
 * Location: Meeting room at Hokubukaikan, or eZuce, Polycom  * Location: Meeting room at Hokubukaikan, or Zoom
Line 120: Line 132:
||66||2019/4/9||[[KAGRA/Commissioning/Weekly/20190409/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190409/Minute|Minute]]||||
||65-1||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/TypeA_Agenda|Integrated Type-A meeting]]|| || || ||
||65||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190402/Minute|Minute]]||||
||64||2019/3/26||[[KAGRA/Commissioning/Weekly/20190326/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190326/Minute|Minute]]||[[attachment:KAGRA/Commissioning/20190326_avoding_delay.pptx|file]]||
||63||2019/3/11||[[KAGRA/Commissioning/Weekly/20190311/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190311/Minute|Minute]]|| ||
||62||2019/3/5||[[KAGRA/Commissioning/Weekly/20190305/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190305/Minute|Minute]]|| ||
||61||2019/2/19||[[KAGRA/Commissioning/Weekly/20190219/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190219/Minute|Minute]]|| ||
||60||2019/2/5||[[KAGRA/Commissioning/Weekly/20190205/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190205/Minute|Minute]]|| ||
Line 183: Line 203:
 * 2019/3/8: Scheduling for FPMI [[/Meetings/Others/20190308/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190308|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/4/11(Thur.)

Schedule

  • Center
    • 3/25: Venting

    • 3/27-4/9: Fixing PR2 or others

      • 4/4 -4/5: Gluing

      • 4/8: alignment check

      • 4/8-10: OSEM adjustment

    • 4/10: alignment check

    • 4/11: VIS final health check
    • 4/11-12: Closing
    • 4/12: Pump down
    • 4/15~: Leak check
  • ITMX:
    • 3/19: Cooling stop

    • 3/25: Venting start

    • 3/27: Opning chamber

    • 3/27~: Fixing thermal touch

    • 4/2~: closing chamber and start pumping down

    • 4/11: Cooling starts.

  • Xend
    • 3/25: closing and pump down

    • 4/8: Leak check

    • 4/9-10: venting

    • 4/11: Exchange a broken LED for Photo sensor
    • 4/12: closing chamber and start pumping down
    • 4/15: Leak check
    • 4/19(or 22): Cooling start
  • Yend
    • 3/26: Venting start

    • 3/28~: Fixing short inside chamber

    • 4/3: Fixing F0 actuator

    • 4/4~: closing chamber and start pumping down.

    • 4/11: Cooling starts.

  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

  • Commissioning meeting moves at 1PM from this week.

Night work

  • IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

Weekend

  • Weekend work at the control room: Fabian for monitor, Lucia for monitor and control.

Report of work

  • Type B: OSEM adjustments for SR2 and PR2 were done.
    • SR2 pitch had big offset.
  • Type B: Offset for IP of BS was removed.
    • Top cover was removed.
  • MIF: The final alignment check was done last night.

Work plan

  • VIS: Health check for all VIS in the central part today.
  • CRY: A LED for PD sensor ETMX will be replaced.
  • VIS: Monitor for ITMX and ETMY will be by Lucia.
    • Monitor for center tomorrow will be by Fabian, Okutomi.
  • CRY: cryo payload should be monitored by BF for pitch, XX for vertical by Ushiba with VIS team.
  • Weekend work at the control room: Fabian for monitor, Lucia for monitor and control.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)