Differences between revisions 642 and 699 (spanning 57 versions)
Revision 642 as of 2019-03-04 09:19:07
Size: 18554
Comment:
Revision 699 as of 2019-04-10 13:07:11
Size: 20093
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:
==== Daily Meetings (9AM) ==== ==== Daily Meetings (9AM, 1PM) ====
Line 45: Line 45:
=== Daily meeting === == Daily meeting ==
Line 52: Line 52:
=== 2019/3/4(Mon.) ===

=== Schedule ===
=== 2019/4/10(Wed.) ===

==== Schedule ====
Line 56: Line 56:
  * --(2/26-27: Venting)--
  * 2/28-3/5: Fixing PRMs and SRMs
  * 3/2-5: Re-alignment
  * 3/6-7: Closing
  * --(3/25: Venting)--
  * 3/27-4/9: Fixing PR2
   * --(4/4 -4/5: Gluing)--
   * 4/8: alignment check
   * 4/8-10: OSEM adjustment
  * 4/11-12: Closing
  * 4/12: Pump down
  * 4/15~: Leak check

 * ITMX:
  * --(3/19: Cooling stop)--
  * --(3/25: Venting start)--
  * --(3/27: Opning chamber)--
  * --(3/27~: Fixing thermal touch)--
  * --(4/2~: closing chamber and start pumping down)--
  * 4/12: Cooling starts.

 * Xend
  * --(3/25: closing and pump down)--
  * --(4/8: Leak check)--
  * 4/9-10: venting
  * 4/11: Exchange a broken LED for Photo sensor
  * 4/12: closing chamber and start pumping down
  * 4/15: Leak check
  * 4/19(or 22): Cooling start
Line 62: Line 83:
  * --(1/25-2/20: Yend Pcal finalization)--
  * 2/25-3/4: Yend WAB finalization
  * 3/5-6: Closing
  * 3/6~ : Yend pumpdown 3/6~
   * 3/7,8: leak test

 * Xend
  * --(2/11-2/14: Xend NAB installation)--
  * --(2/21: Removing FC, Payload release)--
   * --(2/27: ETMX release)--
  * 2/23-3/10: Xend Pcal finalization 1
   * Periscope installation
   * Beam position by IR and Green
  * 3/5: ETMX aligned
  * 3/5-3/10: Xend Pcal finalization 2
  * 3/11,12 Xend WAB finalization
  * 3/19,20, Heatlink etc.
  * 3/22 Pumping down
   * Leak test
  * --(3/26: Venting start)--
  * --(3/28~: Fixing short inside chamber)--
  * --(4/3: Fixing F0 actuator)--
  * --(4/4~: closing chamber and start pumping down.)--
  * 4/12: Cooling starts.


 * 4/8: Daily meeting will be moved to 1PM
  * Summary of work will last for a while in the morning meeting.

 * April: Measurement of TF, payload diagonalization on ITMX
 * End of April~: DRMI commissioning
 * End of April~: Y arm commissioning
 * ~End of May: FPMI commissioning

==== Note ====
  * Commissioning meeting moves at 1PM from this week.

==== Night work ====
 * IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

==== Weekend ====
 *
Line 82: Line 107:
 * 3/11~ : Night work starts

 * 2/18-3/22 DRMI commissioning
 * 3/11-4/5 Y arm commissioning
 * 3/25-4/5 FPMI commissioning

==== Note ====

=== Weekend ===
Line 93: Line 108:
 * Type B: Drifts of relative yaw on SRM are still lasting, but getting slower.
 * Type Bp: GAS filter keystone was almost touching something. PR3 looks healthy.
  * PR2 has some broken circuit for sensors.
  * One of the magnet on PRM was off.
  * some works inside the chamber still remains.

 * Type A: Alignment of IR to ETMX, and to ETMY, and Green to both ETM were done on Friday.
 * Type A: Some ETMX LVDT signals showed a 584Hz oscillation. It will be traced today.

 * CAL: EX alignment was done.
  * EX cryopayload had some strange signal. Connection will be checked again.

 * PEM: Ground vibration measurement is being continued. Air Conditioner was not a cause of the vibration.

 * DC position IP of SR3 is still not good. It will be fixed this morning with IFO alignment.
 * OSEM of PRM are fine now. PR2 and SR2 will be tuned today.
 * PR3 was kicked again this morning -> alignment was fixed.

 * Yaw of BS should be offloaded this morning.

 
Line 110: Line 117:
 1. alignment -> done during morning meeting, BS offload.
 * OSEM for PR2.
 * OSEM for SR2.
 
 * No maintenance will be done due to above works, specially there is a possibility that exchanging PCs will disturb PRMs and SRMs.

 * Tonight MIF will try IFO alignment again for the final check. It hopefully will be done tonight, but laser hazard is assigned all the day tomorrow in the case.

 * IOO: iMC ASC work.
Line 119: Line 134:
 * Location: Meeting room at Hokubukaikan, or eZuce, Polycom  * Location: Meeting room at Hokubukaikan, or Zoom
Line 123: Line 138:
||66||2019/4/9||[[KAGRA/Commissioning/Weekly/20190409/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190409/Minute|Minute]]||||
||65-1||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/TypeA_Agenda|Integrated Type-A meeting]]|| || || ||
||65||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190402/Minute|Minute]]||||
||64||2019/3/26||[[KAGRA/Commissioning/Weekly/20190326/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190326/Minute|Minute]]||[[attachment:KAGRA/Commissioning/20190326_avoding_delay.pptx|file]]||
||63||2019/3/11||[[KAGRA/Commissioning/Weekly/20190311/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190311/Minute|Minute]]|| ||
||62||2019/3/5||[[KAGRA/Commissioning/Weekly/20190305/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190305/Minute|Minute]]|| ||
Line 188: Line 209:
 * 2019/3/8: Scheduling for FPMI [[/Meetings/Others/20190308/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190308|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/4/10(Wed.)

Schedule

  • Center
    • 3/25: Venting

    • 3/27-4/9: Fixing PR2
      • 4/4 -4/5: Gluing

      • 4/8: alignment check
      • 4/8-10: OSEM adjustment
    • 4/11-12: Closing
    • 4/12: Pump down
    • 4/15~: Leak check
  • ITMX:
    • 3/19: Cooling stop

    • 3/25: Venting start

    • 3/27: Opning chamber

    • 3/27~: Fixing thermal touch

    • 4/2~: closing chamber and start pumping down

    • 4/12: Cooling starts.
  • Xend
    • 3/25: closing and pump down

    • 4/8: Leak check

    • 4/9-10: venting
    • 4/11: Exchange a broken LED for Photo sensor
    • 4/12: closing chamber and start pumping down
    • 4/15: Leak check
    • 4/19(or 22): Cooling start
  • Yend
    • 3/26: Venting start

    • 3/28~: Fixing short inside chamber

    • 4/3: Fixing F0 actuator

    • 4/4~: closing chamber and start pumping down.

    • 4/12: Cooling starts.
  • 4/8: Daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

  • Commissioning meeting moves at 1PM from this week.

Night work

  • IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

Weekend

Report of work

  • DC position IP of SR3 is still not good. It will be fixed this morning with IFO alignment.
  • OSEM of PRM are fine now. PR2 and SR2 will be tuned today.
  • PR3 was kicked again this morning -> alignment was fixed.

  • Yaw of BS should be offloaded this morning.

Work plan

  1. alignment -> done during morning meeting, BS offload.

  2. OSEM for PR2.
  3. OSEM for SR2.
  4. No maintenance will be done due to above works, specially there is a possibility that exchanging PCs will disturb PRMs and SRMs.
  5. Tonight MIF will try IFO alignment again for the final check. It hopefully will be done tonight, but laser hazard is assigned all the day tomorrow in the case.
  6. IOO: iMC ASC work.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)