Line 37: Line 37:
==== Daily Meetings (9AM) ==== ==== Daily Meetings (9AM, 1PM) ====
Line 45: Line 45:
=== Daily meeting === == Daily meeting ==
Line 52: Line 52:
=== 2019/3/22(Fri.) ===

=== Schedule ===
=== 2019/4/10(Wed.) ===

==== Schedule ====
Line 56: Line 56:
  * --(2/26-27: Venting)--
  * 2/28-3/15: Health check and maintenance for VIS
   * --(PRM: One flag was dropped. -> leave it)--
   * --(3/4-14 PRM: Misalignment does not reach where beam hits damper.)--
   * --(3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.)--
   * --(3/15: BS: Yaw offset adjustment by hand. -> 3/5-6)--
    * --(3/12: BS ok)--
   * --(3/15: some SRs work)--

  * --(3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.)--
  * --(3/18: Re-alignment)--
  * --(3/19-21: Closing)--
  * --(3/22: Pump down)--
  * 3/26: Leak test
  * --(3/25: Venting)--
  * 3/27-4/9: Fixing PR2
   * --(4/4 -4/5: Gluing)--
   * 4/8: alignment check
   * 4/8-10: OSEM adjustment
  * 4/11-12: Closing
  * 4/12: Pump down
  * 4/15~: Leak check
Line 73: Line 67:
  * 3/28: Opning chamber
  * 3/28: Fixing thermal touch
  * 3/29: closing chamber and start pumping down.
  * 4/1: Start cooling.
  * --(3/25: Venting start)--
  * --(3/27: Opning chamber)--
  * --(3/27~: Fixing thermal touch)--
  * --(4/2~: closing chamber and start pumping down)--
  * 4/12: Cooling starts.

 * Xend
  * --(3/25: closing and pump down)--
  * --(4/8: Leak check)--
  * 4/9-10: venting
  * 4/11: Exchange a broken LED for Photo sensor
  * 4/12: closing chamber and start pumping down
  * 4/15: Leak check
  * 4/19(or 22): Cooling start
Line 79: Line 83:
  * --(1/25-2/20: Yend Pcal finalization)--
  * --(3/5: EYA remaining works by Enomoto, Inoue.)--
  * --(2/25-3/5: Yend WAB finalization)--
  * --(3/6: Y end closing (no laser hazard at least in the morning))--
  * --(3/7: Y end pump down)--
  * 3/22-23: leak test
  * 3/27: cooling start

 * Xend
  * --(2/11-2/14: Xend NAB installation)--
  * --(2/21: Removing FC, Payload release)--
   * --(2/27: ETMX release)--
  * --(2/23-3/6: Xend Pcal finalization 1)--
   * --(Periscope installation)--
   * --(3/6: Beam position by IR and Green)--
  * --(3/5 AOS: EY and EX(if they have time) work.)--
  * --(3/6: Green X alignment (no IR), and no hazard at Y end.)--
  * --(3/11, ~20: Xend WAB finalization.)--
  * --(3/11~3/15: ETMX tuning.)--
  * --(3/19: ETMX finalization by Takahashi)--
  * --(3/18,19: ETMX alignement)--
  * 3/23-24: Pcal alignment
  * 3/25: Removing PD
  * 3/25: closing and pump down
  * 4/2-4: Leak test
  * 3/27: Cooling start
 
 * 3/25~ : Night work officially starts, daily meeting will be moved to 1PM
  * --(3/26: Venting start)--
  * --(3/28~: Fixing short inside chamber)--
  * --(4/3: Fixing F0 actuator)--
  * --(4/4~: closing chamber and start pumping down.)--
  * 4/12: Cooling starts.


 * 4/8: Daily meeting will be moved to 1PM
Line 109: Line 93:
 * 2/18-2/22: PRMI commissioning
 * 3/25~?: DRMI commissioning
 * 3/25-4/19: Y arm commissioning
 * 3/25-4/19: FPMI commissioning
 * April: Measurement of TF, payload diagonalization on ITMX
 * End of April~: DRMI commissioning
 * End of April~: Y arm commissioning
 * ~End of May: FPMI commissioning
Line 115: Line 99:
  * Official night work starts 3/25, but not determined yet.
  * Please DO NOT close laser shutter, this is for long term measurement. Currently laser is stopped thin foil at the end of PSL.

=== Weekend ===
 * Pcal: (Sat?, Sun) Alignment check at ETMX.
 * COM: (Sun) alignment work in the mine.
  * Commissioning meeting moves at 1PM from this week.

==== Night work ====
 * IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

==== Weekend ====
 *
Line 123: Line 108:

 * Type B: It was found that BS was necessary to fix some hight issue yesterday.
 * Center area, all the chambers were closed by the end of yesterday, and pump down has just started this morning.

 * COM: Alignment was done by the night of day before yesterday.
 * Type A:
  * ETMX has been confirmed that it is healthy.
  * ETMY: IP was something wrong and still alignment was not finished day before yesterday.
   * Motor had some problem, and it will be fixed.
 * Type B: SR2 oplev is being tuned in these days.

 * DC position IP of SR3 is still not good. It will be fixed this morning with IFO alignment.
 * OSEM of PRM are fine now. PR2 and SR2 will be tuned today.
 * PR3 was kicked again this morning -> alignment was fixed.

 * Yaw of BS should be offloaded this morning.

 
Line 137: Line 117:
 * Drift for all PRMs BS and SRMs will be monitored by Fabian, Terrence and Mark.
 * Yend leak test will be done today.
 1. alignment -> done during morning meeting, BS offload.
 * OSEM for PR2.
 * OSEM for SR2.
 
 * No maintenance will be done due to above works, specially there is a possibility that exchanging PCs will disturb PRMs and SRMs.

 * Tonight MIF will try IFO alignment again for the final check. It hopefully will be done tonight, but laser hazard is assigned all the day tomorrow in the case.

 * IOO: iMC ASC work.
Line 148: Line 134:
 * Location: Meeting room at Hokubukaikan, or eZuce, Polycom  * Location: Meeting room at Hokubukaikan, or Zoom
Line 152: Line 138:
||66||2019/4/9||[[KAGRA/Commissioning/Weekly/20190409/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190409/Minute|Minute]]||||
||65-1||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/TypeA_Agenda|Integrated Type-A meeting]]|| || || ||
||65||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190402/Minute|Minute]]||||
||64||2019/3/26||[[KAGRA/Commissioning/Weekly/20190326/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190326/Minute|Minute]]||[[attachment:KAGRA/Commissioning/20190326_avoding_delay.pptx|file]]||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/4/10(Wed.)

Schedule

  • Center
    • 3/25: Venting

    • 3/27-4/9: Fixing PR2
      • 4/4 -4/5: Gluing

      • 4/8: alignment check
      • 4/8-10: OSEM adjustment
    • 4/11-12: Closing
    • 4/12: Pump down
    • 4/15~: Leak check
  • ITMX:
    • 3/19: Cooling stop

    • 3/25: Venting start

    • 3/27: Opning chamber

    • 3/27~: Fixing thermal touch

    • 4/2~: closing chamber and start pumping down

    • 4/12: Cooling starts.
  • Xend
    • 3/25: closing and pump down

    • 4/8: Leak check

    • 4/9-10: venting
    • 4/11: Exchange a broken LED for Photo sensor
    • 4/12: closing chamber and start pumping down
    • 4/15: Leak check
    • 4/19(or 22): Cooling start
  • Yend
    • 3/26: Venting start

    • 3/28~: Fixing short inside chamber

    • 4/3: Fixing F0 actuator

    • 4/4~: closing chamber and start pumping down.

    • 4/12: Cooling starts.
  • 4/8: Daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

  • Commissioning meeting moves at 1PM from this week.

Night work

  • IOO: iMC alignment (Kokeyama, Guiguo, June-gyu)

Weekend

Report of work

  • DC position IP of SR3 is still not good. It will be fixed this morning with IFO alignment.
  • OSEM of PRM are fine now. PR2 and SR2 will be tuned today.
  • PR3 was kicked again this morning -> alignment was fixed.

  • Yaw of BS should be offloaded this morning.

Work plan

  1. alignment -> done during morning meeting, BS offload.

  2. OSEM for PR2.
  3. OSEM for SR2.
  4. No maintenance will be done due to above works, specially there is a possibility that exchanging PCs will disturb PRMs and SRMs.
  5. Tonight MIF will try IFO alignment again for the final check. It hopefully will be done tonight, but laser hazard is assigned all the day tomorrow in the case.
  6. IOO: iMC ASC work.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)