20270
Comment:
|
20377
|
Deletions are marked like this. | Additions are marked like this. |
Line 52: | Line 52: |
=== 2019/4/11(Thur.) === | === 2019/4/25(Thur.) === |
Line 62: | Line 62: |
* 4/11: VIS final health check * 4/11-12: Closing * 4/12: Pump down * 4/15~: Leak check |
* --(4/11: VIS final health check)-- * --(4/11-12: Closing)-- * --(4/12: Pump down)-- * 4/29,30: Leak check |
Line 73: | Line 73: |
* --(4/11: Cooling starts.)-- | * --(4/10: Cooling starts.)-- |
Line 79: | Line 79: |
* 4/11: Exchange a broken LED for Photo sensor * 4/12: closing chamber and start pumping down * 4/15: Leak check * 4/19(or 22): Cooling start |
* --(4/11: Exchange a broken LED for Photo sensor)-- * --(4/12: closing chamber and start pumping down)-- * --(4/22: Leak check)-- * --(4/22: vent)-- * --(4/24: fix oplev mirror)-- * 4/25: Pumpdown * 5/2: leak check * 5/2: Cooling start |
Line 89: | Line 93: |
* --(4/11: Cooling starts.)-- | * --(4/10: Cooling starts.)-- |
Line 97: | Line 101: |
* Commissioning meeting moves at 1PM from this week. | * 1pm commissioning meeting will start again. |
Line 100: | Line 104: |
* IOO: iMC alignment (Kokeyama, Guiguo, June-gyu) | * Y arm commissioning, from the control room. |
Line 103: | Line 107: |
* Weekend work at the control room: Fabian for monitor, Lucia for monitor and control. |
* |
Line 106: | Line 110: |
* Type B: OSEM adjustments for SR2 and PR2 were done. * SR2 pitch had big offset. * Type B: Offset for IP of BS was removed. * Top cover was removed. * MIF: The final alignment check was done last night. |
* ETMX: Oplev mirror at IM was fixed. * ETMX: Opened hatch and checked the cable for LVDT. Coupling at tower part still exists. It could be cable swapping. * ITMY: Accelerometer was fixed. * ITMY: IM actuator did not work. MN will be used for hierarchy control. * TM actuator had a problem on the circuit. Mechanically it seems to be OK. * VAC: Cleaning at ETMX is going on. * ETMX venting started. * Maintenance was done. * Replaced k1als0 and k1lsc0. * Replaced HDD of k1nfs0. |
Line 114: | Line 126: |
* VIS: Health check for all VIS in the central part today. * PR3 was checked and it was confirmed healthy. * All VIS in the center area seems to be healthy. * CRY: A LED for PD sensor ETMX will be replaced. * VIS: Monitor for ITMX and ETMY will be by Lucia. * Monitor for center tomorrow will be by Fabian, Okutomi. * CRY: cryo payload should be monitored by BF for pitch, XX for vertical by Ushiba with VIS team. * LED was fixed in the morning by Ushiba-kun. * Weekend work at the control room: Fabian for monitor, Lucia for monitor and control. |
* IOO: Some works for shutter this afternoon, for MZ. |
Line 136: | Line 141: |
||68||2019/4/23||[[KAGRA/Commissioning/Weekly/20190423/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190423/Minute|Minute]]|||| ||67||2019/4/16||[[KAGRA/Commissioning/Weekly/20190416/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190416/Minute|Minute]]|||| |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM, 1PM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/4/25(Thur.)
Schedule
- Center
3/25: Venting
3/27-4/9: Fixing PR2 or others
4/4 -4/5: Gluing
4/8: alignment check
4/8-10: OSEM adjustment
4/10: alignment check
4/11: VIS final health check
4/11-12: Closing
4/12: Pump down
- 4/29,30: Leak check
- ITMX:
3/19: Cooling stop
3/25: Venting start
3/27: Opning chamber
3/27~: Fixing thermal touch
4/2~: closing chamber and start pumping down
4/10: Cooling starts.
- Xend
3/25: closing and pump down
4/8: Leak check
4/9-10: venting
4/11: Exchange a broken LED for Photo sensor
4/12: closing chamber and start pumping down
4/22: Leak check
4/22: vent
4/24: fix oplev mirror
- 4/25: Pumpdown
- 5/2: leak check
- 5/2: Cooling start
- Yend
3/26: Venting start
3/28~: Fixing short inside chamber
4/3: Fixing F0 actuator
4/4~: closing chamber and start pumping down.
4/10: Cooling starts.
- April: Measurement of TF, payload diagonalization on ITMX
- End of April~: DRMI commissioning
- End of April~: Y arm commissioning
- ~End of May: FPMI commissioning
Note
- 1pm commissioning meeting will start again.
Night work
- Y arm commissioning, from the control room.
Weekend
Report of work
- ETMX: Oplev mirror at IM was fixed.
- ETMX: Opened hatch and checked the cable for LVDT. Coupling at tower part still exists. It could be cable swapping.
- ITMY: Accelerometer was fixed.
- ITMY: IM actuator did not work. MN will be used for hierarchy control.
- TM actuator had a problem on the circuit. Mechanically it seems to be OK.
- VAC: Cleaning at ETMX is going on.
- ETMX venting started.
- Maintenance was done.
- Replaced k1als0 and k1lsc0.
- Replaced HDD of k1nfs0.
Work plan
- IOO: Some works for shutter this afternoon, for MZ.
KAGRA/Commissioning/DailyWork << < 2024 / 10 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or Zoom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools