Differences between revisions 694 and 726 (spanning 32 versions)
Revision 694 as of 2019-04-08 18:00:40
Size: 19737
Comment:
Revision 726 as of 2019-05-07 10:08:27
Size: 19534
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/4/8(Mon.) === === 2019/5/7(Tue.) ===
Line 56: Line 56:
  * --(3/25: Venting)--
  * 3/27-4/9: Fixing PR2
   * --(4/4 -4/5: Gluing)--
   * 4/8: alignment check
   * 4/8-9: OSEM adjustment
  * 4/10-11: Closing
  * 4/12: Pump down
  * 4/15~: Leak check
  * --(4/12: Pump down)--
  * --(4/29,30: Leak check)--
  * 5/2: Vent and pumpdown
  * 5/9: leak check
Line 66: Line 62:
  * --(3/19: Cooling stop)--
  * --(3/25: Venting start)--
  * --(3/27: Opning chamber)--
  * --(3/27~: Fixing thermal touch)--
  * --(4/2~: closing chamber and start pumping down)--
  * 4/12: Cooling starts.
  * --(4/2~: closing chamber and start pumping down.)--
  * --(4/10: Cooling starts.)--
  * 5/8: Cooling done
Line 74: Line 67:
  * --(3/25: closing and pump down)--
  * --(4/8: Leak check)--
  * --(4/9-10: venting)--
  * 4/11: Exchange a broken LED for Photo sensor
  * 4/12: closing chamber and start pumping down
  * 4/15: Leak check
  * 4/19(or 22): Cooling start
  * --(4/25: Pumpdown)--
  * --(5/2: leak check)--
  * --(5/2: Cooling start)--
Line 83: Line 72:
  * --(3/26: Venting start)--
  * --(3/28~: Fixing short inside chamber)--
  * --(4/3: Fixing F0 actuator)--
Line 87: Line 73:
  * 4/12: Cooling starts.


 * 4/8: Daily meeting will be moved to 1PM
  * Summary of work will last for a while in the morning meeting.
  * --(4/10: Cooling starts.)--
  * 5/8: Cooling done
Line 99: Line 82:
  * Commissioning meeting moves at 1PM from today.  *
Line 102: Line 85:
 * IOO: iMC alignment (Kokeyama, Guiguo)  * Y arm commissioning, from the control room.
Line 105: Line 88:
 *
 
Line 108: Line 90:
 * Type Bp: Jig for 3 flags were removed successfully, and PR2 and PRM are centered.
 * ITMX has no signal on oplev.
 * CRY: ETMX PD sensor was fixed on Thurturday.
 * Type B: SR2 TF looked healthy on Thursday.
 * Type A: ETMY TF looked healthy on Saturday.
 * CRY: ITMY was cooled to 20K.
 * IR laser frequency was too noisy for mass feedback lock.
  * Frequency is stabilized by X arm cavity, and Y arm will be locked to stabilized laser.

 * Beam spot on ITMY was too high.
  * Needs BS camera.

 * VAC: In the central area, leaks were found and it was fixed. Pumping down started again.
Line 117: Line 99:
 * MIF: IFO alignment will be checked this morning.
Line 130: Line 112:
||69||2019/5/7||[[KAGRA/Commissioning/Weekly/20190507/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190507/Minute|Minute]]||||
||68||2019/4/23||[[KAGRA/Commissioning/Weekly/20190423/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190423/Minute|Minute]]||||
||67||2019/4/16||[[KAGRA/Commissioning/Weekly/20190416/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190416/Minute|Minute]]||||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/5/7(Tue.)

Schedule

  • Center
    • 4/12: Pump down

    • 4/29,30: Leak check

    • 5/2: Vent and pumpdown
    • 5/9: leak check
  • ITMX:
    • 4/2~: closing chamber and start pumping down.

    • 4/10: Cooling starts.

    • 5/8: Cooling done
  • Xend
    • 4/25: Pumpdown

    • 5/2: leak check

    • 5/2: Cooling start

  • Yend
    • 4/4~: closing chamber and start pumping down.

    • 4/10: Cooling starts.

    • 5/8: Cooling done
  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

Night work

  • Y arm commissioning, from the control room.

Weekend

Report of work

  • IR laser frequency was too noisy for mass feedback lock.
    • Frequency is stabilized by X arm cavity, and Y arm will be locked to stabilized laser.
  • Beam spot on ITMY was too high.
    • Needs BS camera.
  • VAC: In the central area, leaks were found and it was fixed. Pumping down started again.

Work plan

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)