Line 52: Line 52:
=== 2019/4/25(Thur.) === === 2019/5/7(Tue.) ===
Line 56: Line 56:
  * --(3/25: Venting)--
  * --(3/27-4/9: Fixing PR2 or others)--
   * --(4/4 -4/5: Gluing)--
   * --(4/8: alignment check)--
   * --(4/8-10: OSEM adjustment)--
  * --(4/10: alignment check)--
  * --(4/11: VIS final health check)--
  * --(4/11-12: Closing)--
Line 65: Line 57:
  * 4/29,30: Leak check   * --(4/29,30: Leak check)--
  * ~5/3: Vent and pumpdown
  * 5/9: leak check
Line 68: Line 62:
  * --(3/19: Cooling stop)--
  * --(3/25: Venting start)--
  * --(3/27: Opning chamber)--
  * --(3/27~: Fixing thermal touch)--
  * --(4/2~: closing chamber and start pumping down)--
  * --(4/2~: closing chamber and start pumping down.)--
Line 74: Line 64:
  * 5/8: Cooling done
Line 76: Line 67:
  * --(3/25: closing and pump down)--
  * --(4/8: Leak check)--
  * --(4/9-10: venting)--
  * --(4/11: Exchange a broken LED for Photo sensor)--
  * --(4/12: closing chamber and start pumping down)--
  * --(4/22: Leak check)--
  * --(4/22: vent)--
  * --(4/24: fix oplev mirror)--
  * 4/25: Pumpdown
  * 5/2: leak check
  * 5/2: Cooling start
  * --(4/25: Pumpdown)--
  * --(5/2: leak check)--
  * --(5/2: Cooling start)--
Line 89: Line 72:
  * --(3/26: Venting start)--
  * --(3/28~: Fixing short inside chamber)--
  * --(4/3: Fixing F0 actuator)--
Line 94: Line 74:
  * 5/8: Cooling done
Line 101: Line 82:
 * 1pm commissioning meeting will start again.  *
Line 104: Line 85:
 *  * Y arm commissioning, from the control room.
Line 107: Line 88:
 *
Line 110: Line 90:
 * ETMX: Oplev mirror at IM was fixed.
 * ETMX: Opened hatch and checked the cable. Coupling at tower part still exists. It could be cable swapping.

 * ITMY: Accelerometer was fixed.
 * ITMY: IM actuator did not work. MN will be used for hierarchy control.
  * TM actuator had a problem on the circuit. Mechanically it seems to be OK.

 * VAC: Cleaning at ETMX is going on.

 * Maintenance was done.
  * Replaced k1als0 and k1lsc0.
  * Replaced HDD of k1nfs0.
 * IR laser frequency was too noisy for mass feedback lock.
  * Frequency is stabilized by X arm cavity, and Y arm will be locked to stabilized laser.

 * Beam spot on ITMY was too high.
  * Needs BS camera.

 * VAC: In the central area, leaks were found and it was fixed. Pumping down started again.
Line 124: Line 99:
 * IOO: Works for shutter this afternoon.
Line 138: Line 112:
||69||2019/5/7||[[KAGRA/Commissioning/Weekly/20190507/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190507/Minute|Minute]]||||

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/5/7(Tue.)

Schedule

  • Center
    • 4/12: Pump down

    • 4/29,30: Leak check

    • ~5/3: Vent and pumpdown
    • 5/9: leak check
  • ITMX:
    • 4/2~: closing chamber and start pumping down.

    • 4/10: Cooling starts.

    • 5/8: Cooling done
  • Xend
    • 4/25: Pumpdown

    • 5/2: leak check

    • 5/2: Cooling start

  • Yend
    • 4/4~: closing chamber and start pumping down.

    • 4/10: Cooling starts.

    • 5/8: Cooling done
  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

Night work

  • Y arm commissioning, from the control room.

Weekend

Report of work

  • IR laser frequency was too noisy for mass feedback lock.
    • Frequency is stabilized by X arm cavity, and Y arm will be locked to stabilized laser.
  • Beam spot on ITMY was too high.
    • Needs BS camera.
  • VAC: In the central area, leaks were found and it was fixed. Pumping down started again.

Work plan

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)