Line 37: Line 37:
==== Daily Meetings (9AM) ==== ==== Daily Meetings (9AM, 1PM) ====
Line 45: Line 45:
=== Daily meeting === == Daily meeting ==
Line 52: Line 52:
=== 2019/2/8(Fri.) ===

=== Weekend ===

=== Schedule ===
  * Current status as of 1/22: IR and Green reached X end PD.
  * --(1/22: Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/23: Surface inspection for SR mirrors.)--
  * --(1/24-25: Cleaning HR of SR3, SRM.)--

  * --(1/23: BS is aligned to Y-end PD by IR.)--
  * --(1/27: ITMY is aligned to REFL by IR.)--
  * --(1/27: ITMX is aligned to REFL by IR.)--
  * --(1/27: Beam position of IR at SR3 is confirmed how far from the center.)--

  * --(1/28-29: SR3 is aligned to SR2 center by IR.)--
  * --(1/28: Alignment of SR2 -> SRM by IR.)--
  * --(1/29: Green beam is injected from SR2 AR surface to Y end PD.)--

  * --(1/31: Removing bellows at PR and SR area.)--
  * --(1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2)--

  * --(2/5: Alignment of SRM to OMMT1 by IR)--
  * --(2/6: Alignment of ETMY -> POS by Green)--

  * 2/7-8: OMMT -> OSTM by IR, OSTM -> OMC by IR

  * 2/12-15: Closing door for central area, pumping down
   * needs drift monitor for VIS
=== 2019/5/22(Wed.) ===

==== Schedule ====
 * 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )
 * 5/20-24: Exchanging cryo valves.
 * 6/8: Engineering run

 * ITMX
  * 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm

 * ETMX
  * --(5/2: Cooling start)--
  * 5/29: Cooling done

 * ITMY
  * 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm
 * ETMY
  * 5/17~: tuned off ETMY cryostat cooler
  * 5/24PM~ inject 100Pa Nitrogen.
  * 5/27 evacuation of Nitrogen.
  * 6/3-6/14: Installation of TMS for ETMY


 * 4/22-5/31: Yarm commissioning
 * 5/27-6/30: DRMI commissioning
 * 7/1-8/9: DRFPMI commissioning
 * 8/12-10/4: DRFPMI ASC
 * 10/7-11/15: Post Commissioning
 * 11/18-12/13: Noise hunting
Line 83: Line 83:
 * Report all the wrok to klog, and gokagra ML if urgent things.
 * If you work other location from where it was confirmed at the morning meeting, please contact related poeple.
 * There was request to CRY people to attend the morning or noon meeting.
 * CRY: Exchanging cryo valve during this week.

==== Night work ====

==== Weekend ====
Line 87: Line 91:
 * Type B and COM: SR3 oplev loop was implemented and improved. Motion is much smaller now and it will help alignment work.
  * we saw some oscillation aound 10~Hz
 * CAM: GigE camera at POS table to see SR2.
 * AOS: TMSY got signal of green at QPD and PD.
 * FCL: temperature is between 24-25 degree. Temperature at SR2 is something strange.
 * COM: It was found that calculation of finesse estimation from ring down measurement was wrong. It was actually Xarm ~1450(close to design value), Yarm ~440(1/3 of design value).
 * Type Bp: Satellite box for PR2 was replaced. One new box was no signal at one of the channels. It was replaced to other new one and it worked.
Line 94: Line 95:

 * MIR: inspection will be done
 * AOS: Transportation of NAB in X arm from 11am.
 * AOS: We will check BS oplev coupling issue.
 * Type B: One of SRM OSEM is close to edge of range. We will fix it today.
 * CRY: ITMX cryostat cooler will be stopped.
 * IOO: MZ will be released today from the main path of PSL.
 * DGS: Maintenance work for adding BIO cards.
 * DGS: Camera server maintenance. If you need camera, please use k1cam1.
Line 108: Line 108:
 * Location: Meeting room at Hokubukaikan, or eZuce, Polycom  * Location: Meeting room at Hokubukaikan, or Zoom
Line 112: Line 112:
||71||2019/5/21||[[KAGRA/Commissioning/Weekly/20190521/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190521/Minute|Minute]]||||
||70||2019/5/14||[[KAGRA/Commissioning/Weekly/20190514/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190514/Minute|Minute]]||||
||69||2019/5/7||[[KAGRA/Commissioning/Weekly/20190507/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190507/Minute|Minute]]||||
||68||2019/4/23||[[KAGRA/Commissioning/Weekly/20190423/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190423/Minute|Minute]]||||
||67||2019/4/16||[[KAGRA/Commissioning/Weekly/20190416/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190416/Minute|Minute]]||||
||66||2019/4/9||[[KAGRA/Commissioning/Weekly/20190409/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190409/Minute|Minute]]||||
||65-1||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/TypeA_Agenda|Integrated Type-A meeting]]|| || || ||
||65||2019/4/2||[[KAGRA/Commissioning/Weekly/20190402/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190402/Minute|Minute]]||||
||64||2019/3/26||[[KAGRA/Commissioning/Weekly/20190326/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190326/Minute|Minute]]||[[attachment:KAGRA/Commissioning/20190326_avoding_delay.pptx|file]]||
||63||2019/3/11||[[KAGRA/Commissioning/Weekly/20190311/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190311/Minute|Minute]]|| ||
||62||2019/3/5||[[KAGRA/Commissioning/Weekly/20190305/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190305/Minute|Minute]]|| ||
||61||2019/2/19||[[KAGRA/Commissioning/Weekly/20190219/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190219/Minute|Minute]]|| ||
Line 176: Line 188:
 * 2019/3/8: Scheduling for FPMI [[/Meetings/Others/20190308/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190308|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/5/22(Wed.)

Schedule

  • 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )

  • 5/20-24: Exchanging cryo valves.
  • 6/8: Engineering run
  • ITMX
    • 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm
  • ETMX
    • 5/2: Cooling start

    • 5/29: Cooling done
  • ITMY
    • 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm
  • ETMY
    • 5/17~: tuned off ETMY cryostat cooler
    • 5/24PM~ inject 100Pa Nitrogen.
    • 5/27 evacuation of Nitrogen.
    • 6/3-6/14: Installation of TMS for ETMY
  • 4/22-5/31: Yarm commissioning
  • 5/27-6/30: DRMI commissioning
  • 7/1-8/9: DRFPMI commissioning
  • 8/12-10/4: DRFPMI ASC
  • 10/7-11/15: Post Commissioning
  • 11/18-12/13: Noise hunting

Note

  • There was request to CRY people to attend the morning or noon meeting.
  • CRY: Exchanging cryo valve during this week.

Night work

Weekend

Report of work

  • COM: It was found that calculation of finesse estimation from ring down measurement was wrong. It was actually Xarm ~1450(close to design value), Yarm ~440(1/3 of design value).
  • Type Bp: Satellite box for PR2 was replaced. One new box was no signal at one of the channels. It was replaced to other new one and it worked.

Work plan

  • CRY: ITMX cryostat cooler will be stopped.
  • IOO: MZ will be released today from the main path of PSL.
  • DGS: Maintenance work for adding BIO cards.
  • DGS: Camera server maintenance. If you need camera, please use k1cam1.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members