Differences between revisions 2 and 10 (spanning 8 versions)
Revision 2 as of 2018-09-18 21:57:43
Size: 1748
Comment:
Revision 10 as of 2019-05-27 18:59:48
Size: 2109
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * With a fixed stage.  * With a vibration isolation stage (VIS).
Line 4: Line 4:
||<<MonthCalendar(,2018,9)>>||<<MonthCalendar(,2018,10)>>|| ||<<MonthCalendar(,2018,9)>>||<<MonthCalendar(,2018,10)>>||<<MonthCalendar(,2018,11)>>||<<MonthCalendar(,2018,12)>>||
||<<MonthCalendar(,2019,1)>>||<<MonthCalendar(,2019,2)>>||<<MonthCalendar(,2019,3)>>||<<MonthCalendar(,2019,4)>>||
||<<MonthCalendar(,2019,5)>>||<<MonthCalendar(,2019,6)>>||<<MonthCalendar(,2019,7)>>||<<MonthCalendar(,2019,8)>>||
Line 19: Line 22:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6652]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6454]]
Line 24: Line 29:
 * Place/install the fixed stage.
  * Needs some shims... but what is the required horizontalness?
 * Place/install the BRT
  * What is the references...?
 * Place/install the TMS-VIS (TMS's vibration isolation stage).
 * Place/install the BRT on the TMS-VIS

Transmission Monitor (TMS) at EXT (For O3)

  • With a vibration isolation stage (VIS).
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2018 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    

<< <  2018 / 12 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

<< <  2019 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

<< <  2019 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2019 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2019 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2019 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the TMS-VIS (TMS's vibration isolation stage).
  • Place/install the BRT on the TMS-VIS

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/Subgroups/AOS/TMSX_O3 (last edited 2019-05-27 18:59:48 by TomotadaAkutsu)