Differences between revisions 746 and 759 (spanning 13 versions)
Revision 746 as of 2019-05-29 09:23:11
Size: 20329
Comment:
Revision 759 as of 2019-06-07 09:24:34
Size: 20893
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit?usp=sharing|Preparation for joining O3]]
Line 52: Line 53:
=== 2019/5/29(Wed.) === === 2019/6/7(Fri.) ===
Line 57: Line 58:
 * 5/27-6/2: Y arm mass lock.
 * 5/29: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (specially BS)
 * --(5/27-6/2: Y arm mass lock.)-- (not done yet)
 * --(5/29: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (specially BS) )--
Line 85: Line 86:
 * TMS installation this week.
 * Please reduce the number or speed of 16kHz channels.
Line 91: Line 94:
 * COM: GR for X arm was locked again. The problem was that the shutter of GR was half closed since last Wednesday.
  * Some resonances of 3.6H and 5.1Hz were excited when length control signal was injected to hierarchy control point.
 * CRY: ITMY reached 29K.
 
 * COM: PRMI robust lock was established, with free swinging SRM.
 * COM: Very short DRMI lock was established. Glitch of somewhere was seen in PRCL and SRCL.
 * COM: SRY was locked.
 * Type A: ITMY is still shaky. Investigation is planned.

 * AOS: TMSY was installed and aligned with transmittance of GR.
  * It will be done with light with Y arm lock next.
  * Found LVDT issue.

 * CAL: Reconstruction monitor for X arm was done with calibration of MICH. OLG and other TF ware measured.

Line 96: Line 107:
 * DGS: Maintenance for replacing k1lsc0.
 * COM: Finesse measurement for y arm with low temperature. Contamination can happen with low temperature.
 * Type B: Smooth watch dog will be implemented into some Type Bs in the maintenance time.
 * COM: Centering oplev, BS oplev investigation, alignment of AS.
 * IOO, FCL: Filters will be stopped at 2PM around IOO for tomorrows run. No stop around PRM or SRM and ETXM.
Line 189: Line 198:
 * 2019/6/5: Meeting for E Run on 6/8 [[/Meetings/Others/20190608/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190608|Minute]]

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/6/7(Fri.)

Schedule

  • 5/22-23: MZ release from PSL

  • 5/20-24: Exchanging cryo valves.

  • 5/27-6/2: Y arm mass lock. (not done yet)

  • 5/29: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (specially BS)

  • 6/3-6/14: Installation of TMS for ETMY
  • 6/8: Engineering run
  • ITMX
    • 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm

    • 5/22AM~: tuned off shield cooler, finesse measurement for Xarm

  • ETMX
    • 5/2: Cooling start

  • ITMY
    • 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm

  • ETMY
    • 5/17~: tuned off ETMY cryostat cooler

  • Long term:
    • 4/22-5/31: Yarm commissioning
    • 5/27-6/30: DRMI commissioning
    • 7/1-8/9: DRFPMI commissioning
    • 8/12-10/4: DRFPMI ASC
    • 10/7-11/15: Post Commissioning
    • 11/18-12/13: Noise hunting

Note

  • TMS installation this week.
  • Please reduce the number or speed of 16kHz channels.

Night work

Weekend

Report of work

  • COM: PRMI robust lock was established, with free swinging SRM.
  • COM: Very short DRMI lock was established. Glitch of somewhere was seen in PRCL and SRCL.
  • COM: SRY was locked.
  • Type A: ITMY is still shaky. Investigation is planned.
  • AOS: TMSY was installed and aligned with transmittance of GR.
    • It will be done with light with Y arm lock next.
    • Found LVDT issue.
  • CAL: Reconstruction monitor for X arm was done with calibration of MICH. OLG and other TF ware measured.

Work plan

  • COM: Centering oplev, BS oplev investigation, alignment of AS.
  • IOO, FCL: Filters will be stopped at 2PM around IOO for tomorrows run. No stop around PRM or SRM and ETXM.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

72

2019/5/28

Agenda

See agenda page

Minute

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)