Line 83: | Line 83: |
== Today's work plan: 2019/9/3 1PM - 2019/9/4 1PM == | == Today's work plan: 2019/9/4 1PM - 2019/9/5 1PM == |
Line 86: | Line 86: |
* TMX investigation with X arm lock (Okutomi, Akutsu) * QPD centering at ETMX (Nakano, Tanaka) |
|
Line 89: | Line 87: |
* Type A work ETMY (Lucia, Fujii) | * Type A work ETMY (Lucia) * Type B work for SRM (Fabian) |
Line 91: | Line 90: |
* Type B work (Fabian) * Payload work for optical lever control in the central part (Shoda) * ISS work in the PSL(Yoshioka, Ushiba) * Bean profile measurement (Kokeyama, Eleonora) |
* ISS work in the PSL in short time (Yoshioka, Ushiba) * Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa) * Investigation for alignment on Y end (Akutsu) * Ghost beam check (Kokeyama, Eleonora, Terrence, Akutsu) * ASC work with Xarm or Yarm (Okutommi) |
Line 98: | Line 99: |
* IFO realignment and lock acquisition for SRFPMI (Nakano, Yokozawa, Okutomi, Ushiba) * Changing modulation frequency for f1 and f2. * TMSY IR QPD work. (Akutsu, Tanaka, Kokeyama) |
* Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa) * Investigation for alignment on Y end (Akutsu) * ASC work with Xarm or Yarm (Okutommi) |
Line 107: | Line 108: |
* Calibration (Ogaki) * Centering oplev for SR2 and SRM (Fabian, Yokozawa) * Investigate 46Hz noise on Pitch of ITMX, and for damping ETMY (Okutomi, Fujii) |
* Calibration of MI (Ogaki) * Type A work ETMX and ITMX (Fujii) * Type A work ETMY (Lucia) |
Line 111: | Line 112: |
* Type A sensor correction for EX and EY (Lucia, Fujii) * Payload work for optical control in the central part, specially for SRs (Shoda) |
* ASC work (Kokeyama, Eleonora) |
KAGRA Commissioning Wiki
Meetings
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 1PM, everyday
- Location: KAGRA control room
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 9AM, everyday
- Location: KAGRA control room
Zoom 2 URL: https://zoom.us/j/6676627462
- Time: 11AM, every Tuesday
- Location: 2F large meeting room
Working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
- ITMX cooler stop on 8/6 (CRY)
- Y arm will be available from 8/8~
- ETMX warm up 8/9 (CRY)
- ETYY cooling (CRY)
Standing issues
- Sensitivity monitor for various DoF (CAL)
- for FPMI
- PEM - measured data sharing (Washimi, Yokozawa)
- How to control the PSL temperature when people enters the room (Miyoki)
- We need IFO commissioning strategy!!!
- One arm WFS test
- DRMI lock stability
- 3f transition
- Search for better Gouy phase in PRC
- PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- Arm: transition
- Y-arm lock
- Try ALS mass lock with FFUs and ACs turned off
- Type-A related
- Fast shut off feature on type-A after lockloss not to ring (real time model change, Stefan)
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Exchanging modified HPCD.
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Automation script for damping for calm down phase
- Fixing frost on mirrors.
PR2 & PRM oplev wind shield, PR3 LS oplev centering
- Wind shield for PR2 and PRM (Enomoto)
- For ASC things
- Centering REFL DC QPD (Eleonora)
- Measure TF of VIS as ASC actuator (Okutomi)
- Measure OLT of CALM loop and check PD noise (Nakano, Enomoto)
- Mich calibration during before and after silent run. (Ogaki)
Today's work plan: 2019/9/4 1PM - 2019/9/5 1PM
Afternoon
- Type A work ETMX and ITMX (Fujii)
- Type A work ETMY (Lucia)
- Type B work for SRM (Fabian)
- Payload damping ITMY (Yamada)
- ISS work in the PSL in short time (Yoshioka, Ushiba)
- Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa)
- Investigation for alignment on Y end (Akutsu)
- Ghost beam check (Kokeyama, Eleonora, Terrence, Akutsu)
- ASC work with Xarm or Yarm (Okutommi)
Evening
- Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa)
- Investigation for alignment on Y end (Akutsu)
- ASC work with Xarm or Yarm (Okutommi)
- Silent run after daily work done until morning
Weekend
Morning
- Calibration of MI (Ogaki)
- Type A work ETMX and ITMX (Fujii)
- Type A work ETMY (Lucia)
- Payload damping ITMY (Yamada)
- ASC work (Kokeyama, Eleonora)
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
79 |
2019/9/3 |
See agenda page |
|
||
78 |
2019/8/20 |
See agenda page |
|||
77 |
2019/8/6 |
See agenda page |
|||
76 |
2019/7/23 |
See agenda page |
|||
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Task list
Documents
Communication tools
- wiki
Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl