== Today's work plan: 2019/7/16 1PM - 2019/7/17 1PM ==

=== Afternoon ===
 * ETMY !L2Angle decoupling (Yamada, Nakano)
 * Check the schematic of the High Power Coil Driver (Fabian, Terrence)
 * Fix the CARM board boost issue (Enomoto)
 * Design a filter for DARM (Stefan)

=== Evening ===
 * Y-arm mass lock trial

=== Morning ===
 * DGS maintenance
  * Power supply replacement of SR3 (Yamamoto)
 * ITM T-cam computer replacement (Yokozawa)
 * OMC extraction (Aso, et al)
 * Check dimensions around OSTM (Takahashi)

----
== Standing issues ==

 * Y-arm lock
  * ETMY suspension control
   * L2Angle decoupling
   * ETMY coil driver range increase
  * CARM board boost does not engage
 * DRMI lock stability
  * Model HOM-PHD signal distortion (Aso, Kokeyama)
  * Search for better Gouy phase in PRC
 * Initial alignment automation
 * Type-A related
  * Add aligned state in Guardian (Kokeyama)
 * Type-B related
  * SR3 Yaw motion is too large
   * Different ground level between the IO chasis and the AA filter box may be the reason
   * Replace the DC power supply
  * BS IM2TM transfer function measurement
 * Type-C related
  * Check dimensions around the OSTM
  * OSEM characterization for OSTM
 * OMC
  * Extract OMC
  * Check the OMC on the AS table
 * Laser safety
  * Debug the laser safety guardian

 
 
 
Line 8: Line 58:
 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit?usp=sharing|Preparation for joining O3]]
Line 52: Line 103:
=== 2019/5/23(Thur.) === === 2019/7/16(Tue.) ===
Line 55: Line 106:
 * --(5/22: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS) )--
 * 5/22-23: MZ release from PSL
 * 5/20-24: Exchanging cryo valves.
 * 6/8: Engineering run
 * ~7/31: Trial for DRMI with polarization.
 * 7/6~: Trial for mass lock
Line 61: Line 110:
  * --(5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm)--
  * --(5/22AM~: tuned off shield cooler, finesse measurement for Xarm)--
Line 65: Line 112:
  * --(5/2: Cooling start)--
  * 5/29: Cooling done
Line 69: Line 114:
  * --(5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm)--   * 7/4: Turbo pump on
Line 72: Line 117:
  * --(5/17~: tuned off ETMY cryostat cooler)--
  * 5/24PM~ inject 100Pa Nitrogen.
  * 5/27 evacuation of Nitrogen.
  * 6/3-6/14: Installation of TMS for ETMY


 *
4/22-5/31: Yarm commissioning   * 5/27-6/30: DRMI commissioning
* 7/1-8/9: DRFPMI commissioning
 * 8/12-10/4: DRFPMI ASC
 * 10/7-11/15: Post Commissioning
 * 11/18-12/13: Noise hunting
  * 7/4: Turbo pump on


 * Long
term:
  * --(
4/22-5/31: Yarm commissioning)--
  * --(
5/27-6/30: DRMI commissioning)--
 
* 7/1-8/9: FPMI/DRFPMI commissioning
  * 8/12-10/4: ASC
  * 10/7-11/15: Post Commissioning
  * 11/18-12/13: Noise hunting
Line 86: Line 130:
 * COM: ETMY pitch has still range limit. One of the motor might reach the edge, and one more motor on the same DOF should work if somebody goes to EY and put more current on the driver.
 * There was request to CRY people to attend the morning or noon meeting.
 * CRY: Exchanging cryo valve during this week.
Line 95: Line 137:
 * CRY: ITMX cryostat cooler and shield cooler were stopped yesterday. Outgas pressure was normal.
 * CRY: ITMY cryostat cooler was stopped yesterday. Outgas pressure was normal.
 * CRY: ETMY Shield cooler was stopped yesterday and there was a big increment of pressure. It means ETMY may have some contamination.

 * IOO: MZ was released from the main path of PSL.
 * IOO team is still woking on realignment after removing MZ. Unexpected large beam shift by removing BS happened.

 * Type Bp: Cleaned aroundf PR2.
 * Type Bp: Stepping motor did not work on PR suspensions GAS filter.
 * Type B, Bp: Checking for LVDT for PR2 SR2 and BS
 * Type B: It was found that loose cable connection on H3 coil for RM of SR2. It was fixed.


 * DGS: We added BIO cards to k1lsc0. However it turned out that rebooting k1lsc always fails. Actually it was needed to shutdown to recover. V3 PC seems to have some problem.


 * DGS: Maintenance work for adding BIO cards.
 * DGS: Camera server maintenance. If you need camera, please use k1cam1.
 * OMC: Beam spot on mirror moved. One (or more) of the mirrors seems to be misaligned. OMC will be pulled tomorrow.
 * Y arm: 20dB suppression on LSC below 1Hz was seen on mass lock trial.
  * Opleve control was slightly changed from IM control to TM control.
  * High frequency is limited by noise. Needs high power coil driver modification.
 * Type B: H2 on SR3 was noisy, but needs more time to investigate it.
 * 80mHz peak was reduced by changing damping setting.
 * RTPC for ASC and ALS were dead somehow.
Line 116: Line 147:
 * CRY: Repairing work for cooler valve will finish today. The last item is for ITMY shield cooler.
 * COM: Finesse will be done tonight or tomorrow morning, depending on progress of IOO work.
Line 132: Line 161:
||75||2019/7/16||[[KAGRA/Commissioning/Weekly/20190716/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190716/Minute|Minute]]||||
||74||2019/7/2||[[KAGRA/Commissioning/Weekly/20190702/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190702/Minute|Minute]]||||
||73||2019/6/25||[[KAGRA/Commissioning/Weekly/20190625/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190625/Minute|Minute]]||||
||72||2019/5/28||[[KAGRA/Commissioning/Weekly/20190528/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190528/Minute|Minute]]||||
Line 208: Line 241:
 * 2019/6/11: Summery meeting for E Run 1 [[/Meetings/Others/20190611/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190611|Minute]]
 * 2019/6/5: Meeting for E Run on 6/8 [[/Meetings/Others/20190608/Agenda|Agenda]], [[KAGRA/Commissioning/Meetings/Others/20190608|Minute]]

KAGRA Commissioning Wiki


Today's work plan: 2019/7/16 1PM - 2019/7/17 1PM

Afternoon

  • ETMY L2Angle decoupling (Yamada, Nakano)

  • Check the schematic of the High Power Coil Driver (Fabian, Terrence)
  • Fix the CARM board boost issue (Enomoto)
  • Design a filter for DARM (Stefan)

Evening

  • Y-arm mass lock trial

Morning

  • DGS maintenance
    • Power supply replacement of SR3 (Yamamoto)
  • ITM T-cam computer replacement (Yokozawa)
  • OMC extraction (Aso, et al)
  • Check dimensions around OSTM (Takahashi)


Standing issues

  • Y-arm lock
    • ETMY suspension control
      • L2Angle decoupling

      • ETMY coil driver range increase
    • CARM board boost does not engage
  • DRMI lock stability
    • Model HOM-PHD signal distortion (Aso, Kokeyama)
    • Search for better Gouy phase in PRC
  • Initial alignment automation
  • Type-A related
    • Add aligned state in Guardian (Kokeyama)
  • Type-B related
    • SR3 Yaw motion is too large
      • Different ground level between the IO chasis and the AA filter box may be the reason
      • Replace the DC power supply
    • BS IM2TM transfer function measurement
  • Type-C related
    • Check dimensions around the OSTM
    • OSEM characterization for OSTM
  • OMC
    • Extract OMC
    • Check the OMC on the AS table
  • Laser safety
    • Debug the laser safety guardian

Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/7/16(Tue.)

Schedule

  • ~7/31: Trial for DRMI with polarization.
  • 7/6~: Trial for mass lock
  • ITMX
  • ETMX
  • ITMY
    • 7/4: Turbo pump on
  • ETMY
    • 7/4: Turbo pump on
  • Long term:
    • 4/22-5/31: Yarm commissioning

    • 5/27-6/30: DRMI commissioning

    • 7/1-8/9: FPMI/DRFPMI commissioning
    • 8/12-10/4: ASC
    • 10/7-11/15: Post Commissioning
    • 11/18-12/13: Noise hunting

Note

Night work

Weekend

Report of work

  • OMC: Beam spot on mirror moved. One (or more) of the mirrors seems to be misaligned. OMC will be pulled tomorrow.
  • Y arm: 20dB suppression on LSC below 1Hz was seen on mass lock trial.
    • Opleve control was slightly changed from IM control to TM control.
    • High frequency is limited by noise. Needs high power coil driver modification.
  • Type B: H2 on SR3 was noisy, but needs more time to investigate it.
  • 80mHz peak was reduced by changing damping setting.
  • RTPC for ASC and ALS were dead somehow.

Work plan

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

75

2019/7/16

Agenda

See agenda page

Minute

74

2019/7/2

Agenda

See agenda page

Minute

73

2019/6/25

Agenda

See agenda page

Minute

72

2019/5/28

Agenda

See agenda page

Minute

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1