== Today's work plan: 2019/7/24 1PM - 2019/7/25 1PM == | == Today's work plan: 2019/7/25 1PM - 2019/7/26 1PM == |
Line 17: | Line 17: |
* Replacing LVDT driver on SR3(Fabian) * Single arm locking (Nakano) * Fix AC to stablize temeparute (Miyoki) * ITMY damping (Okutomi) * Maintenance for Ondotori (Yokozawa, T. Tanaka) * ALS model medication (Enomoto, Sugimoto) * MZ in PSL room for a hour (Guiguo) |
* Fixing ITMY stuck (Okutomi) * ASC test on ITMX (Ushiba) * ETMX work (Fujii) * SR3 work for control loop IM yaw (Terrence) * Cabling for BIO this afternoon (Enomoto) * Xarm ALS hand over to IR using TR (Enomoto) |
Line 27: | Line 26: |
* ALS hand over to IR using TR (Nakano, Enomoto) * DRFPMI lock (Nakano, Enomoto) |
* Xarm ALS hand over to IR using TR (Enomoto) |
Line 35: | Line 33: |
* SR3 OSEM check (Fabian, Terrence) * Automation for Suspensions except for SR3 (Shoda) |
* ITMX damping (Ushiba) * Cryo cooler valve exchange (Kimura, Ushiba) * SR3 TF measurement (Fabian) * Automation for SR3 and SRM (Shoda) * Noise source by cable or something around PSL (Yokozawa) * Setting agnet meter at Y end (Yokozawa) |
Line 64: | Line 66: |
* Check the OMC on the AS table | |
Line 70: | Line 71: |
* IR QPD, centering on IR , green QPD at ETMY (Akutsu) | |
Line 75: | Line 75: |
* ITM noise measurement by PEM on 27th morning (Yokozawa). * IR QPD, centering on IR , green QPD at ETMY (Akutsu) * Exchanging laser source of oplev (Akutsu) |
|
Line 158: | Line 162: |
* Temperature drift affected IFO commissioning. So tried ALS signal handling off to TRX and TRY. * SR3 H2 noise investigation is still going on. * Suppressing 80mHz of yaw by feeding back the MN oplev signal was done. * OMC work for alignment. Control system was implemented. * temperature fluctuation at all the central area specially around BS for 0.6C with 20hours period. |
* DGS maintenance * 2 BIO cards installed to k1als0. * cable will be connected today. * Replaced RT-PCs for PR2 and PR3. * OMC cavity was bad, and the transmission was measured as ~20%. Finesse was roughly ~300. * OMC REFL was blocked and not coming instead of just an AR reflection. * Mirror alignment will be changed. * 0.5C temperature shift happened in the center room. * SR3 H2 noise was temporarily fixed using spare ADC port. * Broken LVDT driver was exchanged and to be fixed for tuning. * Tried X arm transition but IMC did not work well. |
Line 165: | Line 175: |
* DGS maintenance * BIO cards installation. * Replacing RT-PCs of SR or PR * Modification of Type A model. * Temperature maintenance in the afternoon. * MZ work (Guiguo). * OMC work in the morning. |
KAGRA Commissioning Wiki
Daily commissioning meeting
- Time: 1PM everyday
- Location: KAGRA control room
Remote participation: https://zoom.us/j/7631499341
Today's work plan: 2019/7/25 1PM - 2019/7/26 1PM
Commissioning leader: Miyakawa (22nd-26th)
Afternoon
- Fixing ITMY stuck (Okutomi)
- ASC test on ITMX (Ushiba)
- ETMX work (Fujii)
- SR3 work for control loop IM yaw (Terrence)
- Cabling for BIO this afternoon (Enomoto)
- Xarm ALS hand over to IR using TR (Enomoto)
- OMC characterization with control (Kokeyama, Darkhan)
Evening
- Xarm ALS hand over to IR using TR (Enomoto)
Weekend
Morning
- ITMY damping (Okutomi)
- Type A work (Fujii)
- ITMX damping (Ushiba)
- Cryo cooler valve exchange (Kimura, Ushiba)
- SR3 TF measurement (Fabian)
- Automation for SR3 and SRM (Shoda)
- Noise source by cable or something around PSL (Yokozawa)
- Setting agnet meter at Y end (Yokozawa)
Standing issues
- Try FPPRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- Fast shut off feature on type-A after lockloss not to ring (real time model change, Stefan)
- Y-arm lock
- ETMY suspension control
- ITMY damping
- One IM magnet is broken. Need a different strategy. Use MN ? (Yamada, Okutomi)
- DRMI lock stability
- Model HOM-PHD signal distortion (Aso, Kokeyama)
- Search for better Gouy phase in PRC
- Initial alignment automation (Nakano)
- IFO configuration Guardian (Kokeyama)
- SDF for all the VIS (Shoda, Okutomi)
- Type-A related
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Exchanging modified HPCD.
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Type-B related
- SR3 Yaw motion is too large (Fabian, Terrence)
- Type-C related
- OSEM characterization for OSTM (on going, Takahashi)
- OMC
- OMC characterization with control
- Laser safety
- Debug the laser safety guardian (Nakano)
- AS tube installation on 7/30-31 (Michimura)
- Valve unit exchange for ITMX on 7/26 for 1-2 hours (Kimura)
- Fiber noise cancellation on Saturday (Enomoto, Sugimoto)
- ITM noise measurement by PEM on 27th morning (Yokozawa).
- IR QPD, centering on IR , green QPD at ETMY (Akutsu)
- Exchanging laser source of oplev (Akutsu)
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM, 1PM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily morning meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/7/24(Wed.)
Schedule
- ~7/31: Trial for DRMI with polarization.
- 7/6~: Trial for mass lock
- ITMX
- ETMX
- ITMY
- ETMY
- Long term:
- 7/1-8/9: FPMI/DRFPMI commissioning
- 8/12-10/4: ASC
- 10/7-11/15: Post Commissioning
- 11/18-12/13: Noise hunting
Note
Night work
Weekend
Report of work
- DGS maintenance
- 2 BIO cards installed to k1als0.
- cable will be connected today.
- Replaced RT-PCs for PR2 and PR3.
- 2 BIO cards installed to k1als0.
- OMC cavity was bad, and the transmission was measured as ~20%. Finesse was roughly ~300.
- OMC REFL was blocked and not coming instead of just an AR reflection.
- Mirror alignment will be changed.
- 0.5C temperature shift happened in the center room.
- SR3 H2 noise was temporarily fixed using spare ADC port.
- Broken LVDT driver was exchanged and to be fixed for tuning.
- Tried X arm transition but IMC did not work well.
Work plan
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or Zoom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
76 |
2019/7/23 |
See agenda page |
|||
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Documents
Communication tools