22753
Comment:
|
24913
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
<<TableOfContents(2)>> ----- <<Anchor(1PMMeetings)>> [[https://teamup.com/ksc4nkchhmh4stoekm|KAGRA Comissioning task planner]] [[KAGRA/Commissioning/DailyMeetingArchive|Meeting archive]] == Items == * Mine work * Beam jitter noise budget * ASC * Laser power increase * REFL table power budget * OMC * Remote work * Feedforward MICH * Offload path * ASC * Calibration check * Lock loss investigation [[http://10.68.10.87/~controls/washimi/LockLossStudy/]] * See the commissioning task planner: * [[https://teamup.com/ksc4nkchhmh4stoekm]] |
|
Line 3: | Line 33: |
Line 24: | Line 55: |
== Working people assignment == * [[https://teamup.com/kswnmta8p18h6u1uab|KAGRA Commissioning Planner]] |
== Tasks and working people assignment == * [[https://teamup.com/ksc4nkchhmh4stoekm|KAGRA Comissioning task planner]] * [[https://teamup.com/kswnmta8p18h6u1uab|KAGRA commissioning people planner]] |
Line 43: | Line 75: |
* We need IFO commissioning strategy!!! * One arm WFS test |
|
Line 61: | Line 91: |
* Fix clipping at IFI with IFO (Kokeyama) | |
Line 62: | Line 93: |
* Calibration for Oplevs at center area using IFO signal (Enomoto) * Fix clipping at IFI with IFO (Aso) |
* One arm WFS test |
Line 66: | Line 96: |
* Fix DAC comb noise problem (Miyakawa) | |
Line 76: | Line 105: |
[[KAGRA/Commissioning/DailyMeetingArchive|Meeting archive]] ----- <<Anchor(1PMMeetings)>> == Today's work plan: 2019/10/3 1PM - 2019/10/7 1PM == === After noon and Evening === * Recovering FPMI (Nakano, Ushiba) * Let's see all the peak again and start hunting them above 10Hz first. * 40Hz peak suppression without control (Okutomi, Lucia) * ASC work at AS port. It may needs real IFO beam but other laser diode can be used (Kokeyama, Miyoki) * VIS works for SRMs if AS port is not used. (Fabian) === Oct. 3 === * Ceremony * IFO test for ceremony (Nakano, Yamamoto) * ASC work with single arm (K.Tanaka) * VIS work (Fujii) * FPMI work(Nakano, Ushiba) === weekend === * ASC work on Sunday (Kokeyama) * Line injection (Yamamoto, Ogaki) * PEM acoustic injection on Saturday or Sunday (Yokozawa) |
* Sensor correction for Type B by large motion like typhoon (Fabian) * Check for all PD or other circuits for grounding on table (Ushiba) * Gate valve test (Tomaru) * Vacuum pump noise measurement (Yokozawa) * Temperature stabilization due to fan off (Miyoki) |
Line 121: | Line 128: |
||90||2020/1/14||[[KAGRA/Commissioning/Weekly/20200114/Agenda|Agenda]]|| ||[[KAGRA/Commissioning/Weekly/20200114/Minute|Minute]]|[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11370|File]]|| ||89||2020/1/7||[[KAGRA/Commissioning/Weekly/20200107/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20200107/Minute|Minute]]|| || ||88||2019/12/17||[[KAGRA/Commissioning/Weekly/20191217/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191217/Minute|Minute]]|| || ||87||2019/12/10||[[KAGRA/Commissioning/Weekly/20191210/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191210/Minute|Minute]]|| || ||86||2019/12/3||[[KAGRA/Commissioning/Weekly/20191203/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191203/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11040|JGW-G1911040]]|| ||85||2019/11/26||[[KAGRA/Commissioning/Weekly/20191126/Agenda|Agenda]]||See [[https://teamup.com/ksc4nkchhmh4stoekm|task planner page]]||[[KAGRA/Commissioning/Weekly/20191126/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11012|JGW-G1911012]][[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11010|JGW-G1911010]]|| ||84||2019/11/19||[[KAGRA/Commissioning/Weekly/20191119/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191119/Minute|Minute]]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10998|File]]|| ||83||2019/11/12||[[KAGRA/Commissioning/Weekly/20191112/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191112/Minute|Minute]]|| || ||82||2019/10/15||[[KAGRA/Commissioning/Weekly/20191015/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191015/Minute|Minute]]|| || ||81||2019/10/8||[[KAGRA/Commissioning/Weekly/20191008/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20191008/Minute|Minute]]|| || |
KAGRA Commissioning Wiki
Contents
KAGRA Comissioning task planner
Items
- Mine work
- Beam jitter noise budget
- ASC
- Laser power increase
- REFL table power budget
- OMC
- Remote work
- Feedforward MICH
- Offload path
- ASC
- Calibration check
Lock loss investigation http://10.68.10.87/~controls/washimi/LockLossStudy/
- See the commissioning task planner:
Meetings
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 4PM, everyday
- Location: KAGRA control room
Zoom 1 URL: https://zoom.us/j/7631499341
- Time: 9AM, everyday
- Location: KAGRA control room
Zoom 2 URL: https://zoom.us/j/6676627462
- Time: 11AM, every Tuesday
- Location: 2F large meeting room
Tasks and working people assignment
Schedule
- Cryo cooler check on 8/5 (Kimura)
- ITMX cooler stop on 8/6 (CRY)
- Y arm will be available from 8/8~
- ETMX warm up 8/9 (CRY)
- ETYY cooling (CRY)
Standing issues
- PEM - measured data sharing (Washimi, Yokozawa)
- How to control the PSL temperature when people enters the room (Miyoki)
- DRMI lock stability
- 3f transition
- Search for better Gouy phase in PRC
- PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
- VIS related
- Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
- United Guardian for all 4 suspensions (Okutomi)
- Damping
- Type A: Feed forward technic to suppress extra motion (Nakano)
- Automation script for damping for calm down phase
PR2 & PRM oplev wind shield, PR3 LS oplev centering
- Wind shield for PR2 and PRM (Enomoto)
- For ASC things
- Fix clipping at IFI with IFO (Kokeyama)
- Measure TF of VIS as ASC actuator (Okutomi)
- One arm WFS test
- ETMY strong damping (Lucia, Ushiba)
DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)
- QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
- Establishing investigation method for diagonalization using ETMY only (all VIS power)
- Fix oplev noise for ITMY
- Fix oplev noise for ITMX
- Fix oplev gain for ETMY (Akutsu)
- Covering wind shield for oplevs of iMC (Akutsu, or somebody)
- Investigation for noise of length oplev noise for ITMs (VIS + CRY)
- PD dark noise investigation (Kozakai)
- Sensor correction for Type B by large motion like typhoon (Fabian)
- Check for all PD or other circuits for grounding on table (Ushiba)
- Gate valve test (Tomaru)
- Vacuum pump noise measurement (Yokozawa)
- Temperature stabilization due to fan off (Miyoki)
KAGRA/Commissioning/DailyWork << < 2024 / 11 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Weekly meeting
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
90 |
2020/1/14 |
|
|||
89 |
2020/1/7 |
|
|||
88 |
2019/12/17 |
|
|||
87 |
2019/12/10 |
|
|||
86 |
2019/12/3 |
||||
85 |
2019/11/26 |
||||
84 |
2019/11/19 |
See agenda page |
|||
83 |
2019/11/12 |
See agenda page |
|
||
82 |
2019/10/15 |
See agenda page |
|
||
81 |
2019/10/8 |
See agenda page |
|
||
80 |
2019/10/1 |
See agenda page |
|||
79 |
2019/9/3 |
See agenda page |
|
||
78 |
2019/8/20 |
See agenda page |
|||
77 |
2019/8/6 |
See agenda page |
|||
76 |
2019/7/23 |
See agenda page |
|||
75 |
2019/7/16 |
See agenda page |
|||
74 |
2019/7/2 |
See agenda page |
|||
73 |
2019/6/25 |
See agenda page |
|||
72 |
2019/5/28 |
See agenda page |
|||
71 |
2019/5/21 |
See agenda page |
|||
70 |
2019/5/14 |
See agenda page |
|||
69 |
2019/5/7 |
See agenda page |
|||
68 |
2019/4/23 |
See agenda page |
|||
67 |
2019/4/16 |
See agenda page |
|||
66 |
2019/4/9 |
See agenda page |
|||
65-1 |
2019/4/2 |
|
|
|
|
65 |
2019/4/2 |
See agenda page |
|||
64 |
2019/3/26 |
See agenda page |
|||
63 |
2019/3/11 |
See agenda page |
|
||
62 |
2019/3/5 |
See agenda page |
|
||
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
|||
35 |
2018/7/3 |
|
|||
34 |
2018/6/26 |
|
|||
33 |
2018/6/19 |
|
|||
32 |
2018/6/12 |
|
|||
31 |
2018/6/5 |
|
|||
30 |
2018/5/22 |
|
|||
29 |
2018/5/8 |
|
|||
28 |
2018/5/1 |
|
|||
27 |
2018/4/17 |
|
|||
26 |
2018/4/10 |
|
|||
25 |
2018/4/3 |
|
|||
24 |
2018/3/27 |
|
|||
23 |
2018/3/20 |
|
|||
22 |
2018/3/13 |
|
|||
21 |
2018/3/6 |
|
|||
20 |
2018/2/27 |
|
|||
19 |
2018/2/20 |
|
|||
18 |
2018/2/13 |
|
|||
17 |
2018/2/6 |
|
|||
16 |
2018/1/30 |
|
|||
15 |
2018/1/23 |
|
|||
14 |
2018/1/16 |
|
|||
13 |
2018/1/9 |
|
|||
12 |
2017/12/19 |
|
|||
11 |
2017/12/12 |
|
|||
10 |
2017/11/28 |
|
|||
9 |
2017/11/14 |
|
|||
8 |
2017/11/7 |
|
|||
7 |
2017/10/31 |
|
|||
6 |
2017/10/24 |
|
|||
5 |
2017/10/17 |
|
|||
4 |
2017/10/10 |
|
|
||
3 |
2017/10/3 |
|
|||
2 |
2017/9/26 |
|
|||
1 |
2017/9/19 |
|
|
|
Other meetings
2018/9/3: Extended chief meeting for Arm commissioning Agenda, Minute
2018/8/30: 3rd Meeting for pump down at ITMX (Minute, Check list)
2018/8/23: 2nd Meeting for pump down at ITMX (Minute, Check list)
2018/8/16: Meeting for pump down at ITMX (Minute, Check list)
2018/5/28: Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.
2018/4/11: Meeting for pump down test at ETMX 2 (Minute, Check list)
2018/4/5: Meeting for pump down test at ETMX 1 (Minute, Check list)
2018/3/14: Meeting for pump down test at Center are (Minute, Check list)
2018/1/18: Meeting for pump down and cooling at ETMY3 (Minute, Check list)
2018/1/17: Meeting for pump down and cooling at ETMY2 (Minute, Check list)
2018/1/10: Meeting for pump down and cooling at ETMY1 (Minute, Check list)
2017/12/13: Meeting for pump down at ETMY (Minute, schedule)
2017/11/27~12/1Commissioning Workshop 2017
2017/11/17: Meeting for closing ETY (Minute)
2017/10/12: Meeting about PR2 pitch misalignment (Minute)
Task list
Documents
Communication tools
- wiki
Task assignment list ([[https://docs.google.com/spreadsheets/d/1qipguowxaEbEEV9LYxvHR_aMBxn0Evsl